EN 197-2-2014 en Cement - Part 2 Conformity Evaluation《水泥-第2部分:合格评定》.pdf
《EN 197-2-2014 en Cement - Part 2 Conformity Evaluation《水泥-第2部分:合格评定》.pdf》由会员分享,可在线阅读,更多相关《EN 197-2-2014 en Cement - Part 2 Conformity Evaluation《水泥-第2部分:合格评定》.pdf(30页珍藏版)》请在麦多课文档分享上搜索。
1、BSI Standards PublicationBS EN 197-2:2014CementPart 2: Conformity evaluationBS EN 197-2:2014 BRITISH STANDARDNational forewordThis British Standard is the UK implementation of EN 197-2:2014. Itsupersedes BS EN 197-2:2000 which is withdrawn.The UK participation in its preparation was entrusted to Tec
2、hnicalCommittee B/516, Cement and lime.A list of organizations represented on this committee can beobtained on request to its secretary.This publication does not purport to include all the necessaryprovisions of a contract. Users are responsible for its correctapplication. The British Standards Inst
3、itution 2014. Published by BSI StandardsLimited 2014ISBN 978 0 580 77018 0ICS 91.100.10Compliance with a British Standard cannot confer immunity fromlegal obligations.This British Standard was published under the authority of theStandards Policy and Strategy Committee on 31 January 2014.Amendments i
4、ssued since publicationDate Text affectedBS EN 197-2:2014EUROPEAN STANDARD NORME EUROPENNE EUROPISCHE NORM EN 197-2 January 2014 ICS 91.100.10 Supersedes EN 197-2:2000English Version Cement - Part 2: Conformity evaluation Ciment - Partie 2: Evaluation de la conformit Zement - Teil 2: Konformittsbewe
5、rtung This European Standard was approved by CEN on 9 November 2013. CEN members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration. Up-to-date lists and bibliographic
6、al references concerning such national standards may be obtained on application to the CEN-CENELEC Management Centre or to any CEN member. This European Standard exists in three official versions (English, French, German). A version in any other language made by translation under the responsibility
7、of a CEN member into its own language and notified to the CEN-CENELEC Management Centre has the same status as the official versions. CEN members are the national standards bodies of Austria, Belgium, Bulgaria, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of M
8、acedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and United Kingdom. EUROPEAN COMMITTEE FOR STANDARDIZATION COMIT EUROPEN DE NORMALISATION
9、EUROPISCHES KOMITEE FR NORMUNG CEN-CENELEC Management Centre: Avenue Marnix 17, B-1000 Brussels 2014 CEN All rights of exploitation in any form and by any means reserved worldwide for CEN national Members. Ref. No. EN 197-2:2014 EBS EN 197-2:2014EN 197-2:2014 (E) 2 Contents Page Foreword 4 1 Scope 5
10、 2 Normative references 5 3 Terms and definitions .5 4 Factory production control by the manufacturer .7 4.1 General requirements 7 4.1.1 Concept .7 4.1.2 Works quality manual .7 4.1.3 Management systems .8 4.1.4 System of documentation .8 4.2 Internal quality control 9 4.2.1 Process control 9 4.2.2
11、 Measuring and testing .9 4.2.3 Handling, storage, packaging and delivery 9 4.3 Autocontrol testing of samples 9 4.3.1 Sampling and testing 9 4.3.2 Corrective action. 10 4.3.3 Measuring and test equipment for autocontrol testing 10 4.3.4 Quality records 10 5 Tasks for the product certification body
12、10 5.1 General . 10 5.2 Continuous surveillance, assessment and evaluation of the factory production control 11 5.2.1 Inspection tasks 11 5.2.2 Frequency of inspections 11 5.2.3 Reports 11 5.3 Evaluation of the results of autocontrol testing of samples 11 5.3.1 Evaluation tasks 11 5.3.2 Number and t
13、iming of evaluations 11 5.3.3 Control period . 11 5.3.4 Evaluation of test results . 11 5.3.5 Reports 12 5.4 Audit testing of samples taken at the factory/depot and determination of the product-type by testing . 12 5.4.1 Sampling 12 5.4.2 Number of samples. 12 5.4.3 Properties and test methods . 12
14、5.4.4 Testing . 12 5.4.5 Evaluation of test results . 13 5.4.6 Reports 13 5.4.7 Proficiency testing 13 5.5 Initial inspection of the factory and the factory production control . 13 5.5.1 Inspection of a new factory . 13 5.5.2 Inspection of an existing factory . 13 5.5.3 Criteria for the assessment o
15、f the production equipment . 13 5.5.4 Criteria for the assessment of laboratories . 14 5.5.5 Reports 14 5.6 Evaluation of test results during the initial period 14 5.6.1 Initial period . 14 5.6.2 Evaluation of test results . 14 5.6.3 Reports 14 BS EN 197-2:2014EN 197-2:2014 (E) 3 6 Actions in the ev
16、ent of non-conformity 15 6.1 Actions to be taken by the manufacturer 15 6.2 Actions to be taken by the product certification body 15 6.2.1 Following continuous surveillance, assessment and evaluation of the factory production control (see 5.2) and evaluation of the results of autocontrol testing (se
17、e 5.3) . 15 6.2.2 Following evaluation of the results of the audit testing of samples taken at the factory/depot (see 5.4 and Annex A) . 15 7 Procedure for third party certification of constancy of performance of the product 16 8 Certificate of constancy of performance of the product and conformity
18、mark 16 8.1 Indication of constancy of performance of the product 16 8.2 Certificate of constancy of performance of the product . 16 9 Requirements for dispatching centres 17 9.1 General requirements . 17 9.2 Tasks for the intermediary 17 9.2.1 Measures to maintain the cement quality . 17 9.2.2 Conf
19、irmation autocontrol testing of samples taken at the dispatching centre 17 9.3 Tasks for the third party . 18 9.3.1 Continuous surveillance, assessment and evaluation of the measures to maintain the cement quality and of the confirmation autocontrol . 18 9.3.2 Audit testing of samples taken at the d
20、ispatching centre 18 9.3.3 Decisions to be taken 18 Annex A (normative) Evaluation of the representativeness and the accuracy of the 28 day strength test results 21 A.1 General . 21 A.2 Sets of results considered 21 A.3 Evaluation procedure 21 Annex B (informative) Procedure for certification of con
21、stancy of performance of cement 24 Annex C (informative) Comparison of terminology according to the CPD and the CPR 25 Bibliography 26 Tables Table 1 Actions to be taken by the product certification body in the event of non-conformity of the results of autocontrol and/or audit testing 19 Table 2 Con
22、firmation and audit testing of samples of certified cement taken at dispatching centres: properties and minimum testing frequencies a . 20 Table A.1 Symbols . 22 Table A.2 Numerical criteria for masonry cement conforming to EN 4131 . 23 Table A.3 Numerical criteria for calcium aluminate cement confo
23、rming to EN 14647 . 23 Table C.1 Comparison of terminology according to the CPD and the CPR 25 BS EN 197-2:2014EN 197-2:2014 (E) 4 Foreword This document (EN 197-2:2014) has been prepared by Technical Committee CEN/TC 51 “Cement and building limes”, the secretariat of which is held by NBN. This Euro
24、pean Standard shall be given the status of a national standard, either by publication of an identical text or by endorsement, at the latest by July 2014, and conflicting national standards shall be withdrawn at the latest by July 2014. Attention is drawn to the possibility that some of the elements
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- EN19722014ENCEMENTPART2CONFORMITYEVALUATION 水泥 部分 合格 评定 PDF

链接地址:http://www.mydoc123.com/p-709537.html