DIN 1414-2-1998 Technical specifications for twist drills of high-speed steel - Part 2 Inspection《高速钢麻花钻的技术规范 第2部分 检验》.pdf
《DIN 1414-2-1998 Technical specifications for twist drills of high-speed steel - Part 2 Inspection《高速钢麻花钻的技术规范 第2部分 检验》.pdf》由会员分享,可在线阅读,更多相关《DIN 1414-2-1998 Technical specifications for twist drills of high-speed steel - Part 2 Inspection《高速钢麻花钻的技术规范 第2部分 检验》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、DEUTSCHE NORM June 1998 Technical delivery conditions for high-speed steel twist drills Part 2: Inspection DIN - 141 4-2 ICs 25.1 00.30 Descriptors: Tools, twist drills, high-speed steel, inspection methods. This standard, together with DIN 1414-1, June 1998 supersedes DIN 1414, October 1977. Techni
2、sche Lieferbedingungen fr Spiralbohrer aus Schnellarbeitsstahl - Teil 2: Prfung In keeping with current practice in standards published by the International Organization for Standardization (/SO), a comma has been used throughout as the decimal marker. Contents Page Page Foreword . . 1 3.4 Land widt
3、h 2 3.5 Relative lip 2 Normative references , , , , , , , , , , , , , , , , , 2 3.6 Flute spaci 3.7 Helixangle 4 3 Checking dimensions 3.1 Drill diameter 2 3.9 Side clearan . 5 . 2 4 Hardness 6 3.2 Radial runout . . 3.8 Point angle . . 5 . 3.3 Web . 3 5 surface roughness . 6 3.3.1 Web thickness . 3
4、3.3.2 Web symmetry . 3 Other relevant standards . 7 Foreword This standard has been prepared by Technical Committee Spiralbohrer aus Schnellarbeitsstahl of the Normenausschu Werkzeuge und Spannzeuge (Tools and Clamping Devices Standards Committee). Amendments This standard differs from the October 1
5、977 edition as follows: a) The standard now consists of two Parts, one dealing with requirements (Part 1) and the other one with inspection (Part 2). b) The standard introduces requirements for web symmetry, side clearance, surface roughness and surface treatment. c) The inspection methods have been
6、 brought up to date. Previous editions DIN 1414: 1955-04, 1958-06, 1966-12, 1971-08, 1977-10. Continued on pages 2 to 7. Translation by DI N-Sprachendienst. In case of doubt, the German-language original should be consulted as the authoritative text I I Q No pari of this translation may be reproduce
7、d without the prior permission of Ref. No. DIN 1414-2 : 1998-06 Beuth Verlag GmbH, D-10772 Berlin, hac the exclusive right of sale for German Standards (DIN-Normen). DIN Deutsches Institut fur Normung e. V., Berlin. English price group 08 Sales No. 0108 11.99 Page 2 DIN 1414-2 : 1998-06 Dimensions i
8、n mm 1 Scope This standard specifies methods of inspecting two-flute twist drills made of high-speed steel. It is not appli- cable to roll-forged drills. See DIN 1414-1 for requirements. 2 Normative references This standard incorporates, by dated or undated reference, provisions from other publicati
9、ons. These norma- tive references are cited at the appropriate places in the text, and titles of the publications are listed below. For dated references, subsequent amendments to or revisions of any of these publications apply to this standard only when incorporated in it by amendment or revision. F
10、or undated references, the latest edition of the publication referred to applies. DIN 228-1 Morse tapers and metric tapers - Taper shanks DIN 1414-1 Technical delivery conditions for high-speed steel twist drills - Requirements DIN 4768 Determination of surface roughness parameters Ra, RZ, and R, us
11、ing electric stylus instru- ments - Concepts and measuring conditions DIN 6581 Concepts associated with chip removal - Reference systems and angles on the cutting portion of tools DIN 6582 Concepts associated with chip removal -Additional concepts for tool, wedge and cutting edge 3 Checking dimensio
12、ns 3.1 Drill diameter The drill diameter shall be measured across the lands at the outer corners of the drill, immediately adjacent to the point (see figure 1) by using a micrometer, a ring gauge or an indicator. Figure 1: Point of drill diameter measurement 3.1.1 Back taper The back taper shall be
13、measured from the outer corners towards the shank of the drill using a micrometer or an indicator. 3.2 Radial runout The radial runout shall be measured across the lands at the outer corners of the drill using a suitable vee block with stop and dial gauge, as shown in figures 2 and 3, suitable for b
14、oth parallel and Morse taper shanks, or an optical instrument. Place the drill on the vee block so that it is in contact with the stop, with the land facing upwards and touching the gauging pin. Set the gauge to zero, rotate the drill through 180“ and take the reading. Figure 2: Measurement of radia
15、l runout of parallel shank twist drills Page 3 DIN 1414-2 : 1998-06 Figure 3: Measurement of radial runout of Morse taper shank twist drills 3.3 Web 3.3.1 Web thickness The web thickness shall be measured at the drill point (see figure 4) using a calliper, a stylus instrument or a micrometer. Figure
16、 4: Web thickness 3.3.2 Web symmetry The web symmetry shall be measured using a vee block with stop and a dial gauge. Place the drill on the vee block with the web at the drill point or behind any thinning of the web touching the gauging pin (see figure 5). Set the gauge to zero, rotate the drill th
17、rough 180“ and take the reading. Figure 5: Measurement of web symmetry 3.4 Land width The land width shall be measured at right angles to the leading edge of the land across a land (see figure 6), using a calliper or an optical instrument. Figure 6: Land width Page 4 DIN 1414-2 : 1998-06 3.5 Relativ
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DIN141421998TECHNICALSPECIFICATIONSFORTWISTDRILLSOFHIGHSPEEDSTEELPART2INSPECTION 高速钢 麻花 技术规范 部分 检验 PDF

链接地址:http://www.mydoc123.com/p-653084.html