CEPT T TPH 30 E-1980 Permanent Provision of and Remuneration for Telecommunications Channels Specifically for Restoration of International Links Routed on Large Capacity Submarine .pdf
《CEPT T TPH 30 E-1980 Permanent Provision of and Remuneration for Telecommunications Channels Specifically for Restoration of International Links Routed on Large Capacity Submarine .pdf》由会员分享,可在线阅读,更多相关《CEPT T TPH 30 E-1980 Permanent Provision of and Remuneration for Telecommunications Channels Specifically for Restoration of International Links Routed on Large Capacity Submarine .pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、o Tlph 30 E Page 1 Recommendation T/Tph 30 (Brussels 1980) PERMANENT PROVISION OF, AND REMUNERATION FOR, LINKS ROUTED ON LARGE CAPACITY SUBMARINE CABLES IN THE CASE OF OUTAGES TELECOMMUNICATIONS CHANNELS SPECIFICALLY FOR RESTORATION OF INTERN TIONAL Recommendation proposed by the “Telephone Operatio
2、n and Tariffs” Working Group T/WG 2 (Tph) Text of the Recommendation adopted by the “Telecommunications” Commission: “The European Conference of Postal and Telecommunications Administrations, coilsidering - in accordance with the principles laid down in Recommendation T/Tph 21 E, a complete restorat
3、ion, to the highest - the reserve capacities of existing links are no longer sufficient with regard to a total restoration of large capacity - clear and simple restoration plans must be drawn up to ensure that these are more rapidly brought into operation, - Administrations must be encouraged in the
4、ir efforts to provide permanent channels specifically for restoration, - restoration of international links routed on large capacity submarine cables concerns all Administrations which have, on whatever basis, rights of use in these systems, - the necessary investment for providing channels for rest
5、oration of international links routed on large capacity submarine cables in the case of outages may be too large to be left to a single Administration, - the said investment is a relatively small proportion of the amounts necessary for the construction of the systems in question, especially if this
6、investment finances restoration channels for several links which are not already protected, standard allowed by the network, must remain a permanent objective, submarine cables, O recommends to CEPT member Administrations that the following rules be applied: . PRINCIPLES ,1. Specific permanent chann
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- CEPTTTPH30E1980PERMANENTPROVISIONOFANDREMUNERATIONFORTELECOMMUNICATIONSCHANNELSSPECIFICALLYFORRESTORATIONOFINTERNATIONALLINKSROUTEDONLARGECAPACITYSUBMARINEPDF

链接地址:http://www.mydoc123.com/p-593359.html