ASTM F2973-2015 Standard Specification for Insulating Lifting Links for Load Lifting Equipment Working Near Energized Power Lines《靠近通电电力线的负荷提升设备用绝缘提升连杆的标准规格》.pdf
《ASTM F2973-2015 Standard Specification for Insulating Lifting Links for Load Lifting Equipment Working Near Energized Power Lines《靠近通电电力线的负荷提升设备用绝缘提升连杆的标准规格》.pdf》由会员分享,可在线阅读,更多相关《ASTM F2973-2015 Standard Specification for Insulating Lifting Links for Load Lifting Equipment Working Near Energized Power Lines《靠近通电电力线的负荷提升设备用绝缘提升连杆的标准规格》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: F2973 14F2973 15Standard Specification forInsulating Lifting Links for Load Lifting Equipment WorkingNear Energized Power Lines1This standard is issued under the fixed designation F2973; the number immediately following the designation indicates the year oforiginal adoption or, in the c
2、ase of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This specification covers insulating lifting links used for protection of workers positio
3、ning a load from accidental contactof the load lifting equipment with live electrical conductors, apparatus, and circuits.1.2 This specification includes design, material, and testing requirements for the manufacturer and in-service inspection, testingand care requirements for the user or the agent
4、of the user.1.3 Insulating links whose primary application does not pertain to power line electrical safety are not within the scope of thisspecification.1.4 The values stated in SI units are to be regarded as standard. No other units of measurement are included in this standard.1.5 This standard do
5、es not purport to address all of the safety concerns, if any, associated with its use. It is the responsibilityof the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatorylimitations prior to use.2. Referenced Documents2.1 ASTM Stand
6、ards:2E4 Practices for Force Verification of Testing MachinesF819 Terminology Relating to Electrical Protective Equipment for Workers2.2 IEEE Standard:3IEEE 4 Standard Techniques for High-Voltage Testing2.3 ISO Standard:4ISO 75001 Metallic materials - Verification of static uniaxial testing machines
7、 - Part 1: Tensile testing machines - Corrigendum3. Terminology3.1 DefinitionsTerminology used in this specification is in accordance with Terminology F819.3.2 Definitions of Terms Specific to This Standard:3.2.1 design verification test, ntest made on a sample treated as representative of an indust
8、rial product.3.2.2 electrical test, na test ensuring that a product meets the minimum electrical requirements of the standard.3.2.3 flashover, na disruptive discharge over the surface of the insulating link.3.2.4 mechanical test, na test confirming that a product meets the minimum mechanical require
9、ments of a standard.3.2.5 proof load, nspecific mechanical load applied in the performance of the proof load test.3.2.6 proof test, nmechanical and electrical tests performed by the manufacturer on all production units.3.2.7 puncture, ndisruptive discharge through an insulator.1 This specification i
10、s under the jurisdiction of ASTM Committee F18 on Electrical Protective Equipment for Workers and is the direct responsibility of SubcommitteeF18.55 on Inspection and Non-Destructive Test Methods for Aerial Devices.Current edition approved Oct. 1, 2014Oct. 1, 2015. Published October 2014November 201
11、5. Originally approved in 2014. Last previous edition approved in 2014 asF2973-14. DOI: 10.1520/F2973-1410.1520/F2973-152 For referencedASTM standards, visit theASTM website, www.astm.org, or contactASTM Customer Service at serviceastm.org. For Annual Book of ASTM Standardsvolume information, refer
12、to the standards Document Summary page on the ASTM website.3 Available from Institute of Electrical and Electronics Engineers, Inc. (IEEE), 445 Hoes Ln., Piscataway, NJ 08854, http:/www.ieee.org.4 Available from American National Standards Institute (ANSI), 25 W. 43rd St., 4th Floor, New York, NY 10
13、036, http:/www.ansi.org.This document is not an ASTM standard and is intended only to provide the user of an ASTM standard an indication of what changes have been made to the previous version. Becauseit may not be technically possible to adequately depict all changes accurately, ASTM recommends that
14、 users consult prior editions as appropriate. In all cases only the current versionof the standard as published by ASTM is to be considered the official document.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States13.2.8 qualified personne
15、l, npersonnel who, by possession of a recognized degree, certificate, professional standing, or skill,and who, by knowledge, training, and experience, have demonstrated the ability to deal with problems relating to the subjectmatter, the work, or the project.3.2.9 rated load, nthe maximum working lo
16、ad.3.2.10 visual inspection, nvisual check made to detect defects that impede the performance of a product(s).4. Materials and Manufacture4.1 The mechanical design factor shall not be less than 5.0 times its rated load for ratings up to 100 tons and 4.0 times ratedload for ratings 100 tons and up.4.
17、2 The electrical design factor of the link shall not be less than 2 times it rated use voltage.4.3 The insulation system shall not absorb water and shall have a water repellent surface.4.4 Weather shields shall be made of impact resistant nonconductive material.4.5 UV resistant polymers should be em
18、ployed by the manufacturer if, without them, electrical performance may be affected.4.6 Steel used shall meet ASTM or AISI standards.5. Workmanship and Finish5.1 The insulating surface of the links shall be free of cracks, nicks, gouges, damage to the insulating surface that would affectits insulati
19、ng properties in both dry and wet conditions.5.2 MarkingsEach link should bear permanent, accessible, and readily visible markings that include, at a minimum, themanufacturers mark, ASTM XXX, unit serial number, rated voltage, and rated load.5.3 ManualsThe manufacturer shall provide a manual with ea
20、ch link. The manual shall contain:5.3.1 Descriptions, specifications, and ratings of the link.5.3.2 Ambient temperature range for which the link is designed.5.3.3 Precautions concerning weather.5.3.4 Instructions regarding routine and frequency of inspections and maintenance.6. General Test Requirem
21、ents6.1 Personnel responsible for the tests outlined in this document shall be qualified individuals as per 3.2.8, knowledgeable inthe use of the test equipment used for tensile loading and high-voltage testing.6.2 The electrical test equipment shall meet the requirements of IEEE 4-1995. The meterin
22、g systems including measurementcable used to measure AC current shall have a system error of 5 % or less.6.3 The electrical test set up shall provide the operator protection in the performance of his duties and isolate the specimen toguard against accidental contact by persons in the vicinity.6.4 Th
23、e ambient temperature for the test location shall not be lower than 15.5 C.6.5 Electrical discharge characteristics and measured current of a test object can be affected by its general arrangement, suchas the clearance from other energized or grounded structures, the height above ground level, or th
24、e arrangement of the high-voltagelead that may affect flashover voltages. For that reason, the general arrangement should be as shown in Fig. 1 for testing links thatFIG. 1 Suggested Test Set Up for Insulated LinksF2973 152are not installed on load lifting equipment.6.6 Clearance to nearby structure
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMF29732015STANDARDSPECIFICATIONFORINSULATINGLIFTINGLINKSFORLOADLIFTINGEQUIPMENTWORKINGNEARENERGIZEDPOWERLINES

链接地址:http://www.mydoc123.com/p-539836.html