《ASTM F2233-2003 Standard Guide for Safety Access Rights Construction Liability and Risk Management for Optical Fiber Networks in Existing Sewers《现有污水管中光纤网络的安全性、使用权限、建造、义务和风险管理的标准指南.pdf》由会员分享,可在线阅读,更多相关《ASTM F2233-2003 Standard Guide for Safety Access Rights Construction Liability and Risk Management for Optical Fiber Networks in Existing Sewers《现有污水管中光纤网络的安全性、使用权限、建造、义务和风险管理的标准指南.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: F 2233 03Standard Guide forSafety, Access Rights, Construction, Liability, and RiskManagement for Optical Fiber Networks in Existing Sewers1This standard is issued under the fixed designation F 2233; the number immediately following the designation indicates the year oforiginal adoption
2、 or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This guide addresses only primary safety concerns,easements, constructabili
3、ty, liability of the various parties, andrisk management related to constructing, installing, maintain-ing or changing an optical fiber network in an existing sewer.1.2 The text of this standard references notes and footnoteswhich provide explanatory material. These notes and footnotes(excluding tho
4、se in tables and figures) shall not be consideredas requirements of the standard.1.3 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and de
5、termine the applica-bility of regulatory requirements prior to use. See 4.1 and5.1-5.1.7 for specific safety information.2. Referenced Documents2.1 Referenced Documents:OSHA 29CFR Part 1926 Occupational Safety and HealthStandards for the Construction IndustryU.S. DOT MUTCD Part VI Manual on Uniform
6、TrafficControl Devices23. Terminology3.1 Definitions of Terms Specific to This Standard:3.1.1 access rightsagreements between various parties toobtain temporary and permanent access to property for thepurpose of constructing, maintaining, or changing optical fibernetworks.3.1.2 competent persona per
7、son properly trained in thesafety aspects of an activity.3.1.3 confined spaceman entry area that has restrictedaccess and egress.3.1.4 constructabilitythe term used to denote the condi-tion of a completed set of plans and specifications for a opticalfiber network and its impact to the host utility,
8、which have beenprepared with an analysis of practical, feasible methods ofconstruction.3.1.5 liabilitythe exposure to claims for damage to an-other partys health, well-being, or property. in the event that a“bond” is considered from a liability perspective, furnishing abond will guarantee performanc
9、e and/or payment of all bills.3.1.6 optical fiber networktelecommunications cablefrom central office to user.3.1.7 partneringin construction, teaming between theowner, engineer, contractor, and other involved parties.3.1.8 risk managementthe process of identifying the riskson a construction project,
10、 and assigning the risks to the partiesmost capable of controlling the risks.3.1.9 safetyphysical and mental activities that protect thehealth, well-being, and life of workers and third party people,and activities that protect the property of all parties.4. Significance and Use4.1 Safety factors mus
11、t be addressed and incorporated intothe work to protect the workers and the public, and construc-tion activities may need to be altered accordingly. Engineeringand construction costs are a part of the analysis.4.2 Access rights to the work should be considered in thedesign of the project.4.3 A const
12、ruction professional, who has field experience inconstruction activities similar to the scope of work anticipated,should review the plans for constructability prior to starting theproject.4.4 Proper insurance and surety bonding to protect theinterests of all parties to the agreement or contract shou
13、ld beconsidered.4.5 Risk management assessment will identify the partiesthat are in the best position to control and be responsible for thedifferent risks.5. Performance Requirements5.1 Safety PracticesSafety practices should follow theguidelines of OSHA 29 CFR Part 1926, and other state andlocal re
14、gulations. The installer should refer to OSHA, state andlocal regulations before work begins. These guidelines will1This guide is under the jurisdiction of ASTM Committee F36 on Technologyand Underground Utilitiesand is the direct responsibility of Subcommittee F36.10on Installation and Operation of
15、 Fiber Optic Cables in Existing Sewers.Current edition approved Feb. 10, 2003. Published April 2003.2For the manual, go to the web site http:/.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.address confined spaces, a competent perso
16、n, safety training,structural hazards, trench safety, manhole safety, traffic safety,and equipment safety.5.1.1 Confined SpacesPerhaps the most dangerous ele-ment of safety risk is exposure to underground confined spaces.In the United States, OSHA requires that confined spaceentrants, attendant, ent
17、ry supervisor, and rescue team betrained, provide special equipment, and follow certain proce-dures when entering a manhole or underground sewer. Theattendant must be equipped to test the atmosphere, monitor theatmosphere and the crew, control the activities in the confinedspace, and call an emergen
18、cy response team for any accident.Besides the air atmosphere, the confined space crew mustrecognize and protect members from sewage or water in thesewers, which can injure or drown a crew member.5.1.2 Structural HazardsWhen cleaning, inspecting, re-pairing the sewer, or installing and maintaining an
19、d changingthe fiber and conduit, the crew should inspect entry structuresand large diameter sewers for structural deficiencies, andconsider possible point collapses, which could flood the pipewith sudden infiltration, or subject the crew to other hazards.Therefore, appropriate judgment and other pre
20、cautions shouldbe considered.5.1.3 Trench SafetySome open trench work or directionaldrilling is required for interconnections and for final connec-tions to users and other telecommunication companies. Acompetent person trained to recognize dangerous conditionsand to protect the crew must be on site.
21、 The most commonsafety concerns in open trench work are cave-ins and otherutility hits. Therefore, shoring, trench boxes, manhole boxes,ladders, locating equipment, and air atmosphere monitoringdevices are needed to perform these activities. All OSHAconstruction standards must be followed.5.1.4 Traf
22、fc SafetyCrews cleaning, inspecting, repairing,installing optical fiber and conduit, repairing sewers andmanholes, and installing new conduit in open trench may beexposed to traffic. U.S. DOT MUTCD Part IV requires thattraffic control devices and flaggers must be in place to protectthe crew and the
23、public, if there is exposure to traffic. Acompetent person should be in charge of these activities.NOTE 1The AGC3(Associated General Contractors of America)offers information on Safety, Constructability, Liability and Risk Manage-ment, and Partnering through its website at http:/agc.org. Additionali
24、nformation about constructability issues is available at the websitewww.engr.wisc.edu/cee/courses/cee596.html, which is the “Constructabil-ity Analysis” course at the College of Engineering, University ofWisconsin-Madison.5.1.5 Equipment SafetyAll construction equipment andpersonal protective gear m
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMF22332003STANDARDGUIDEFORSAFETYACCESSRIGHTSCONSTRUCTIONLIABILITYANDRISKMANAGEMENTFOROPTICALFIBERNETWORKSINEXISTINGSEWERS

链接地址:http://www.mydoc123.com/p-538129.html