1、Designation: D6102 15Standard Guide forInstallation of Geosynthetic Clay Liners1This standard is issued under the fixed designation D6102; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A number in paren
2、theses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This guide covers directions for the installation ofgeosynthetic clay liners (GCLs) under field conditions typi-cally present in environmental lining
3、applications.1.2 This guide contains general installation guidelines. It isnot intended to replace project-specific installation require-ments as found in the contract drawings or specifications. Inthe event of a conflict, the requirement of the project specifi-cations will supersede the requirement
4、s of this guide.1.3 This guide does not purport to establish specific proce-dure for all climatic, geographical, hydraulic, or topographicalconditions that may exist at a site. Appropriate installationprocedures under atypical field conditions should be modifiedas necessary to maintain the integrity
5、 of the GCL and adjacentlining system components.1.4 Different GCLs have different materials of constructionwith different physical properties. The procedures contained inthis guide, therefore, may not be universally applicable to allGCLs under all field conditions.1.5 The values stated in SI units
6、are to be regarded asstandard. No other units of measurement are included in thisstandard.1.6 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practic
7、es and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2D653 Terminology Relating to Soil, Rock, and ContainedFluidsD4439 Terminology for GeosyntheticsD5888 Guide for Storage and Handling of GeosyntheticClay Liners2.2 GRI Document:3GRI-GC
8、L-5 Standard Guide for Design Considerations forGeosynthetic Clay Liners (GCLs) in Various Applications3. Terminology3.1 Definitions: For definitions of other geosynthetic termsused in this guide, refer to Terminology D4439. For definitionsof soils terms, refer to Terminology D653.3.2 Definitions of
9、 Terms Specific to This Standard:3.2.1 fresh water, nwater with a salinity less than 0.5 partsper thousand.3.2.2 geosynthetic clay liner (GCL), na manufacturedhydraulic barrier consisting of clay bonded to a layer or layersof geosynthetics.4. Significance and Use4.1 For optimum performance, GCLs mus
10、t be installed in amanner that does not impact their physical, mechanical, orhydraulic properties.4.2 This guide identifies the proper installation proceduresand equipment for use by GCL designers, inspectors, andinstallers.5. Procedure5.1 The methods and equipment used for placement of theGCL can v
11、ary, but the primary objective of the process is tominimize the potential for GCL damage. The placementmethods and equipment should be evaluated appropriatelywithin this context.5.2 Subgrade Preparation:5.2.1 For projects where the GCL is to be placed over anearthen subgrade, the subgrade surface mu
12、st be prepared andapproved prior to installation in accordance either with projectspecifications or with this guide. The surface should be firmand unyielding, with no abrupt elevation changes, voids andcracks, ice, or standing water.1This guide is under the jurisdiction ofASTM Committee D35 on Geosy
13、ntheticsand is the direct responsibility of Subcommittee D35.04 on Geosynthetic ClayLiners.Current edition approved May 1, 2015. Published July 2015. Originally approvedin 1997. Last previous edition approved in 2012 as D610212. DOI: 10.1520/D6102-15.2For referenced ASTM standards, visit the ASTM we
14、bsite, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Available from Geosynthetic Institute, 475 Kedron Avenue, Folsom, PA19033-1208, http:/www.geosynthetic-instit
15、ute.org.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States15.2.2 The subgrade surface should be smooth and free ofvegetation, sharp-edged rocks, stones, sticks, constructiondebris, and other foreign matter that could contact the GCL.The
16、subgrade surface shall be compacted in accordance withthe project specifications. At a minimum, the subgrade shouldbe rolled with a smooth-drum compactor of sufficient weight toremove any excessive wheel ruts, footprints, or other abruptgrade changes. Excessive rutting should be clearly defined andq
17、uantified. In some cases 25 mm is the maximum rut depthallowed. Furthermore, all protrusions extending more than 12mm from the subgrade surface shall either be removed,crushed, or pushed into the surface with a smooth-drumcompactor.5.3 GCL Placement:5.3.1 All handling of the GCL at the job site shou
18、ld beconducted in accordance with Guide D5888.5.3.2 GCL rolls are to be delivered to the working area ofthe site in their original packaging. Immediately prior todeployment, the packaging shall be carefully removed withoutdamaging the GCL.NOTE 1The orientation of the GCL (that is, which side faces u
19、p) maybe important and shall be in accordance with the engineers requirements.5.3.3 No equipment that could damage the GCL shall beallowed to travel directly on the GCL. Acceptable installation,for example, may be accomplished such that the GCL isunrolled in front of the backwards-moving deploymente
20、quipment, such as a front-end loader or bulldozer. If theequipment causes rutting of the subgrade, the subgrade must berestored to its originally accepted condition before placementcontinues.5.3.4 Care must be taken to minimize the extent to whichthe GCL is repositioned across the subgrade in order
21、tominimize damage to the subgrade and to the bottom surface ofthe GCL. A temporary geosynthetic subgrade covering com-monly known as a slip sheet or rub sheet may be used to reducefriction damage during placement.5.3.5 The GCL should be placed so that seams are parallelto the direction of the slope.
22、 Other industry-accepted practicesfor installing geosynthetics on slopes shall be followed whereappropriate, to help ensure that the stability and performance ofthe GCL is adequate.5.3.6 All GCL should lie flat on the underlying surface, withno wrinkles or folds, especially at the exposed edges of t
23、hepanels.5.3.7 Only as much GCL shall be deployed per working dayas can be covered in accordance with 5.8. The GCL shall becovered overnight.NOTE 2If the GCL is hydrated when no confining stress is present, itmay be necessary to remove and replace the hydrated material. The projectengineer, Construc
24、tion Quality Assurance (CQA) inspector, and GCLsupplier should be consulted for specific guidance if premature hydrationis suspected to have occurred.5.3.8 The GCL should not be installed when it is frozen.5.3.9 If GCLis placed over geosynthetic, care must be takenas to not damage underlying materia
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD610220154571STANDARDGUIDEFORINSTALLATIONOFGEOSYNTHETICCLAYLINERS 土工 合成 粘土 衬垫 安装 标准 指南 PDF

链接地址:http://www.mydoc123.com/p-521540.html