1、Designation:D610206D610212 Standard Guide for Installation of Geosynthetic Clay Liners 1 This standard is issued under the xed designation D6102; the number immediately following the designation indicates the year of original adoption or, in the case of revision, the year of last revision.Anumber in
2、 parentheses indicates the year of last reapproval.A superscript epsilon () indicates an editorial change since the last revision or reapproval. 1. Scope 1.1 This guide covers directions for the installation of geosynthetic clay liners (GCLs) under eld conditions typically present in environmental l
3、ining applications. 1.2 This guide contains general installation guidelines. It is not intended to replace project-specic installation requirements as found in the contract drawings or specications. In the event of a conict, the requirement of the project specications will supersede the requirements
4、 of this guide. 1.3 This guide does not purport to establish specic procedure for all climatic, geographical, hydraulic, or topographical conditions that may exist at a site. Appropriate installation procedures under atypical eld conditions should be modied as necessary to maintain the integrity of
5、the GCL and adjacent lining system components. 1.4 Different GCLs have different materials of construction with different physical properties.The procedures contained in this guide, therefore, may not be universally applicable to all GCLs under all eld conditions. 1.5 This standard does not purport
6、to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. 2. Referenced Documents 2.1 ASTM Standards: 2 D65
7、3Terminology Relating to Soil, Rock, and Contained Fluids D4439Terminology for Geosynthetics D5888Guide for Storage and Handling of Geosynthetic Clay Liners 3. Terminology 3.1 DenitionsFor denitions of other geosynthetic terms used in this guide, refer to Terminology D4439. For denitions of soils te
8、rms, refer to Terminology D653. 3.1 Denitions of Terms Specic to This Standard:Denitions: 3.2.1 geosynthetic clay liner (GCL), na manufactured hydraulic barrier consisting of clay bonded to a layer or layers of geosynthetics.For denitions of other geosynthetic terms used in this guide, refer to Term
9、inology D4439. For denitions of soils terms, refer to Terminology D653. 3.2 3.3 geosynthetic clay liner (GCL), na manufactured hydraulic barrier consisting of clay bonded to a layer or layers of geosynthetics. 4. Signicance and Use 4.1 Foroptimumperformance,GCLsmustbeinstalledinamannerthatdoesnotimp
10、acttheirphysical,mechanical,orhydraulic properties. 4.2 This guide identies the proper installation procedures and equipment for use by GCLdesigners, inspectors, and installers. 1 This guide is under the jurisdiction ofASTM Committee D35 on Geosynthetics and is the direct responsibility of Subcommit
11、tee D35.04 on Geosynthetic Clay Liners. Current edition approved Jan. 1, 2006July 1, 2012. Published February 2006August 20126. Originally approved in 1997. Last previous edition approved in 20042006 as D610204.06. DOI: 10.1520/D6102-06.10.1520/D6102-12. 2 ForreferencedASTMstandards,visittheASTMwebs
12、ite,www.astm.org,orcontactASTMCustomerServiceatserviceastm.org.For Annual Book ofASTM Standards volume information, refer to the standards Document Summary page on the ASTM website. This document is not anASTM standard and is intended only to provide the user of anASTM standard an indication of what
13、 changes have been made to the previous version. Because it may not be technically possible to adequately depict all changes accurately,ASTM recommends that users consult prior editions as appropriate. In all cases only the current version of the standard as published by ASTM is to be considered the
14、 official document. Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States 15. Procedure 5.1 ThemethodsandequipmentusedforplacementoftheGCLcanvary,buttheprimaryobjectiveoftheprocessistominimize the potential for GCL damage. The placement met
15、hods and equipment should be evaluated appropriately within this context. 5.2 Subgrade Preparation: 5.2.1 ForprojectswheretheGCListobeplacedoveranearthensubgrade,thesubgradesurfacemustbepreparedandapproved prior to installation in accordance either with project specications or with this guide.The su
16、rface should be rm and unyielding, with no abrupt elevation changes, voids and cracks, ice, or standing water. 5.2.2 The subgrade surface should be smooth and free of vegetation, sharp-edged rocks, stones, sticks, construction debris, and other foreign matter that could contact the GCL. The subgrade
17、 surface shall be compacted in accordance with the project specications. At a minimum, the subgrade should be rolled with a smooth-drum compactor of sufficient weight to remove any excessivewheelruts,footprints,orotherabruptgradechanges.Excessiveruttingshouldbeclearlydenedandquantied.Insome cases 25
18、 mm is the maximum rut depth allowed. Furthermore, all protrusions extending more than 12 mm from the subgrade surface shall either be removed, crushed, or pushed into the surface with a smooth-drum compactor. 5.3 GCL Placement: 5.3.1 All handling of the GCL at the job site should be conducted in ac
19、cordance with Guide D5888. 5.3.2 GCLrollsaretobedeliveredtotheworkingareaofthesiteintheiroriginalpackaging.Immediatelypriortodeployment, the packaging shall be carefully removed without damaging the GCL. NOTE 1The orientation of the GCL (that is, which side faces up) may be important and shall be in
20、 accordance with the engineers requirements. 5.3.3 No equipment that could damage the GCL shall be allowed to travel directly on the GCL. Acceptable installation, for example, may be accomplished such that the GCL is unrolled in front of the backwards-moving deployment equipment, such as a front-end
21、 loader or bulldozer. If the equipment causes rutting of the subgrade, the subgrade must be restored to its originally accepted condition before placement continues. 5.3.4 Care must be taken to minimize the extent to which the GCL is repositioned across the subgrade in order to minimize damage to th
22、e subgrade and to the bottom surface of the GCL.Atemporary geosynthetic subgrade covering commonly known as a slip sheet or rub sheet may be used to reduce friction damage during placement. 5.3.5 The GCL should be placed so that seams are parallel to the direction of the slope. Other industry-accept
23、ed practices for installinggeosyntheticsonslopesshallbefollowedwhereappropriate,tohelpensurethatthestabilityandperformanceoftheGCL is adequate. 5.3.6 AllGCLshouldlieatontheunderlyingsurface,withnowrinklesorfolds,especiallyattheexposededgesofthepanels. 5.3.7 Only as much GCL shall be deployed per wor
24、king day as can be covered in accordance with 5.8. The GCL shall be covered overnight. NOTE 2If the GCL is hydrated when no conning stress is present, it may be necessary to remove and replace the hydrated material. The project engineer, Construction Quality Assurance (CQA) inspector, and GCL suppli
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD61022012RED8750STANDARDGUIDEFORINSTALLATIONOFGEOSYNTHETICCLAYLINERS 土工 合成 粘土 衬垫 安装 标准 指南 PDF

链接地址:http://www.mydoc123.com/p-521539.html