1、Designation: D5888 06 (Reapproved 2016)Standard Guide forStorage and Handling of Geosynthetic Clay Liners1This standard is issued under the fixed designation D5888; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last r
2、evision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This guide covers guidelines for the proper storage andhandling of geosynthetic clay liners received at the job site bythe e
3、nd user.1.2 This guide contains general guidelines and is not in-tended to replace project-specific requirements as found in thecontract drawings or specifications. In the event of a conflict,the requirements of the project specifications will supersede therequirements of this practice.1.3 The value
4、s given in SI units are to be regarded as thestandard. The inch-pound units given in parentheses are forinformation only.1.4 This guide offers an organized collection of informationor a series of options and does not recommend a specificcourse of action. This document cannot replace education orexpe
5、rience and should be used in conjunction with professionaljudgement. Not all aspects of this guide may be applicable inall circumstances. This ASTM standard is not intended torepresent or replace the standard of care by which theadequacy of a given professional service must be judged, norshould this
6、 document be applied without consideration of aprojects many unique aspects. The word “Standard” in thetitle of this document means only that the document has beenapproved through the ASTM consensus process.1.5 This standard does not purport to address all of thesafety concerns, if any, associated w
7、ith its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2D4439 Terminology for Geosynthetics3. Terminology3.1 Definitions:
8、3.1.1 core pipe, na rigid pipe or rod inserted through thecore of a GCL roll. Each end of the pipe is connected to a chainor lifting strap which attaches to equipment for GCLunloading, on-site handling, and installation.3.1.2 geosynthetic clay liner (GCL), na manufacturedhydraulic barrier consisting
9、 of clay bonded to a layer or layersof geosynthetics.3.1.3 spreader bar, na steel beam used in conjunction withthe core pipe that prevents the lifting chains or straps fromchafing against the ends of the GCL roll.3.1.4 stinger, na rigid pipe or rod with one end directlyconnected to a forklift or oth
10、er equipment. The opposite end ofthe stinger can then be inserted through the GCL roll core suchthat the equipment is able to unload, handle, or install the GCL.3.1.5 For definitions of other geosynthetic terms used in thispractice, refer to Terminology D4439.4. Significance and Use4.1 For optimum p
11、erformance, GCLs must be stored andhandled prior to their installation in a manner that does notimpact their physical properties. Adherence to these storageand handling guidelines will help to ensure that acceptableGCL performance will be achieved.5. Procedure5.1 Receiving and Handling GCL at the Jo
12、b Site:5.1.1 The GCLs are packaged in individual rolls and aretypically delivered to the job site in trucks. Each roll isindividually wrapped and labeled by the GCL manufacturer.Prior to unloading the rolls, make a visual examination of theshipment in order to identify any damage that may haveoccurr
13、ed in transit to the site. Record and report any immedi-ately visible or suspected damage to the GCL rolls immediatelyto the GCL carrier and to the supplier. Tag, mark, and segregatedamaged rolls.5.1.2 Unloading the rolls from the delivery vehicle must bedone in manner that prevents damage to the GC
14、L and itspackaging.NOTE 1A pipe or solid bar of sufficient strength to support the fullweight of the GCL roll without significant bending should be used for all1This guide is under the jurisdiction ofASTM Committee D35 on Geosyntheticsand is the direct responsibility of Subcommittee D35.04 on Geosyn
15、thetic ClayLiners.Current edition approved June 1, 2016. Published June 2016. Originallyapproved in 1995. Last previous edition approved in 2011 as D5888 06(2011).DOI: 10.1520/D5888-06R16.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at service
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD5888200620160859STANDARDGUIDEFORSTORAGEANDHANDLINGOFGEOSYNTHETICCLAYLINERS 土工 合成 黏土 存储 处理 标准 指南

链接地址:http://www.mydoc123.com/p-520970.html