ASTM D1173-2007(2015) Standard Test Method for Foaming Properties of Surface-Active Agents《表面活性剂发泡性能的标准试验方法》.pdf
《ASTM D1173-2007(2015) Standard Test Method for Foaming Properties of Surface-Active Agents《表面活性剂发泡性能的标准试验方法》.pdf》由会员分享,可在线阅读,更多相关《ASTM D1173-2007(2015) Standard Test Method for Foaming Properties of Surface-Active Agents《表面活性剂发泡性能的标准试验方法》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: D1173 07 (Reapproved 2015)Standard Test Method forFoaming Properties of Surface-Active Agents1This standard is issued under the fixed designation D1173; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last
2、revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This test method covers the determination of the foam-ing properties of surface-active agents as defined in Terminol-ogy D4
3、59. This test method is applicable under limited andcontrolled conditions, but does not necessarily yield informa-tion correlating with specific end uses.1.2 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of t
4、his standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2D459 Terminology Relating to Soaps and Other Detergents3. Apparatus3.1 PipetThe pipet (Fig. 1) shall be constructed fr
5、omstandard-wall, chemically resistant glass tubing having thefollowing dimensions: for the bulb, 45 6 1.5 mm outsidediameter; for the lower stem, 7 6 0.5 mm outside diameter.The upper stem shall be constructed to contain a solid-stopper,straight bore, No. 2, standard-taper stopcock having a 2-mmbore
6、 and stems 8 mm in outside diameter. Both the upper andlower seals of the bulb to the stems shall be hemispherical inshape. The lower stem shall be 60 6 2 mm in length from thepoint of attachment to the bulb and shall contain an orificesealed into the lower end. The orifice shall be constructed from
7、precision bore tubing having an inside diameter of 2.9 6 0.02mm and a length of 10 6 0.05 mm, with both ends groundsquare. The orifice shall have an outside diameter so as to fitsnugly into the lower stem and form a secure seal to the stemwhen heated with a sharp pointed flame in the blow torch. The
8、pipet shall be calibrated to contain 200 6 0.2 mL at 20C. Thecalibration mark shall be on the upper stem at least 15 mmbelow the barrel of the stopcock and shall completely encirclethe stem.3.2 ReceiverThe receiver (Fig. 2) shall be constructedfrom standard-wall, chemically resistant glass tubing ha
9、ving aninternal diameter of 50 6 0.8 mm, with one end constricted andsealed to a straight-bore, solid-plug, standard-taper No. 6stopcock having a 6-mm bore and 12-mm stems. The receivershall have three calibration marks which shall completelyencircle the tube. The first mark shall be at the 50-mL po
10、int,shall be measured with the stopcock closed, and shall not be onany curved portion of the constriction. The second mark shallbe at the 250-mL point, and the third mark at a distance of 906 0.5 cm above the 50-mL mark. The receiver tube shall bemounted in a standard-wall tubular water jacket, havi
11、ng anexternal diameter of not less than 70 mm, fitted with inlet andoutlet connections. The jacket may be attached to the receiverwith rubber stoppers or may be sealed at the top and bottom.The seal at the bottom shall be as close to the barrel of thestopcock as practicable. The assembled receiver a
12、nd jacketshall be mounted securely in a plumb position and the jacketconnected to a source of water thermostatically maintained at120 6 1F (49 6 0.5C) for circulating through the jacket. Atthe top of the receiver there shall be a platform, flush with thetop of the assembly, having a metal plate in w
13、hich is drilledthree indexing holes circumferentially placed around the re-ceiver and having an angular displacement of 120 from eachother. A clamp, which may be securely attached to the upperpart of the pipet, shall fit into the holes. The clamp shall havethree leveling screws and lock nuts and whe
14、n properlymounted, shall exactly center the pipet in the receiver and bringthe lower tip of the pipet level with the upper calibration markon the receiver. A meter stick shall be fastened to the side orbehind the receiver with the zero point level with the 250-mLcalibration point on the receiver.4.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD117320072015STANDARDTESTMETHODFORFOAMINGPROPERTIESOFSURFACEACTIVEAGENTS 表面活性剂 发泡 性能 标准 试验 方法 PDF

链接地址:http://www.mydoc123.com/p-509392.html