ASTM C956-2004 Standard Specification for Installation of Cast-In-Place Reinforced Gypsum Concrete《现场浇注的增强石膏混凝土构件安装的标准规范》.pdf
《ASTM C956-2004 Standard Specification for Installation of Cast-In-Place Reinforced Gypsum Concrete《现场浇注的增强石膏混凝土构件安装的标准规范》.pdf》由会员分享,可在线阅读,更多相关《ASTM C956-2004 Standard Specification for Installation of Cast-In-Place Reinforced Gypsum Concrete《现场浇注的增强石膏混凝土构件安装的标准规范》.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: C 956 04Standard Specification forInstallation of Cast-In-Place Reinforced Gypsum Concrete1This standard is issued under the fixed designation C 956; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last rev
2、ision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This specification covers the minimum requirements forthe installation of cast-in-place reinforced gypsum concreteover perman
3、ent formboard.1.2 The values stated in inch-pound units are to be regardedas the standard. The values given in parentheses are forinformation only.1.3 The text of this standard references notes and footnoteswhich provide explanatory material. These notes and footnotes(excluding those in tables and f
4、igures) shall not be consideredrequirements of the standard.2. Referenced Documents2.1 ASTM Standards:2A 82 Specification for Steel Wire, Plain, for Concrete Re-inforcementA 185 Specification for Steel Welded Wire Reinforcement,Plain, for ConcreteA 568 Specification for Steel, Sheet, Carbon, and Hig
5、h-Strength, Low-Alloy, Hot-Rolled and Cold-Rolled, Gen-eral Requirements forA 653/A 653M Specification for Steel Sheet, Zinc-Coated(Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed)by the Hot-Dip ProcessC 11 Terminology Relating to Gypsum and Related Build-ing Materials and SystemsC 317 Specifica
6、tion for Gypsum ConcreteC 726 Specification for Mineral Fiber Roof InsulationBoardE 72 Test Methods of Conducting Strength Tests of Panelsfor Building Construction2.2 American Concrete Institute Standard:ACI 318 Building Code Requirements for Reinforced Con-crete32.3 American Welding Society Standar
7、d:D1.1 Structural Welding Code Steel43. Terminology3.1 Definitions shall be in accordance with TerminologyC11.3.2 Definitions:3.2.1 primary framing, nstructural members provided tosupport the reinforced gypsum concrete roof deck assembly.3.2.1.1 purlin, na secondary structural member that spansthe p
8、rimary framing members and provides support for sub-purlins.3.2.2 subpurlin, na steel member applied transversely tothe primary framing and purlins to support the formboards andto transmit the dead and live loads from the gypsum concreteslab to the primary framing.3.2.2.1 bulb tee, na subpurlin, hot
9、-rolled formed steel,rail-shaped section.3.2.2.2 truss tee, na subpurlin fabricated from steel wireand strip, tee-shaped section.3.2.3 cross tee, na steel tee-shaped section used to supporta formboard end at right angles to the subpurlins where aformboard end does not occur over the purlin or primar
10、yframing.3.2.4 formboard, nsheet material used as a permanentform to support the gypsum concrete.3.2.5 reinforcement, nsteel wire mesh or fabric usedwithin the gypsum concrete slab to provide longitudinal andtransverse strength.3.2.6 double-pouring, nthe application of gypsum con-crete in more than
11、one layer to complete the full slab thickness.See 8.7.4.3.3.2.7 ribbon-pouring or strip-pouring, nthe application ofnarrow ribbons of gypsum concrete, about 10 to 12 in. (254 to1This specification is under the jurisdiction of ASTM Committee C11 onGypsum and Related Building Materials and Systems and
12、 is the direct responsibilityof Subcommittee C11.03 on Specifications for the Application of Gypsum and OtherProducts in Assemblies.Current edition approved May 1, 2004. Published May 2004. Originallyapproved in 1981. Last previous edition C 956 97(2002)e1.2For referenced ASTM standards, visit the A
13、STM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Available from the American Concrete Institute, P.O. Box 19150, Detroit, MI48219.4Available from the Am
14、erican Welding Society, 550 N.W. La Jeune Rd., P.O.Box 351040, Miami, FL 33135.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.305 mm) wide by 1 to 112 in. (25.4 to 38.1 mm) deep, acrossthe width of the formboard at center of span be
15、tween purlins.4. Delivery of Materials4.1 Materials shall be delivered in original packages, con-tainers, or bundles bearing the brand name and name ofproducer or seller. Bulk materials shall be delivered with thebrand name and name of the producer or seller shown on theaccompanying bills of lading.
16、5. Storage of Materials5.1 All materials shall be stored in a manner that preventsdamage before use. When stored under tarpaulins, ventilationshall be provided to prevent moisture accumulation under thetarpaulin.5.2 Formboard shall be stored flat and off the ground.Handling and stacking shall be don
17、e in such a manner toprevent damage to face, ends, and edges and keep dry until use.5.3 When it is necessary to store gypsum concrete at the jobsite, the gypsum concrete shall be stored off the ground andkept dry until use.6. Environmental Conditions6.1 The minimum temperature at which gypsum concre
18、te ismixed and placed is not specified. Gypsum concrete shall notbe mixed with water containing ice crystals.NOTE 1An exothermic reaction during setting ensures completehydration before freezing.7. Materials7.1 Subpurlins:7.1.1 Subpurlins shall be designed to support live and deadloads of the roof d
19、eck.7.1.2 Hot-rolled and cold-rolled steel shapes other than bulbtees or truss tees shall meet the requirements of this specifica-tion for subpurlins.7.2 Cross Tees, shall be not less than 114 in. (31.75 mm)wide by12 in. (12.7 mm) high, fabricated from not less than 26gage zinc-coated steel conformi
20、ng to Specifications A 653/A 653M or A 568.7.3 Formboard:7.3.1 Mineral Fiber Formboard, Specification C 726, notless than34 in. (19.0 mm) thick nor more than 3 in. (76 mm)thick. It shall sustain a uniform load of 20 lb/ft2(97 kg/m2).7.3.1.1 Mineral fiber formboard shall be tested in accor-dance with
21、 the transverse loading test of Test Methods E 72.7.3.1.2 The test specimen shall be uniformly loaded andsupported at both edges and ends. The test specimens shall besupported at the perimeter with a frame providing 1 in. (25.4mm) bearing on ends and12 in. (12.7 mm) bearing on edgesand 7 in. (177.8
22、mm) nominal clearance from the bed of theapparatus.7.3.1.3 For formboards34 in. (19.0 mm) thick, test speci-mens shall be 48 in. (1200 mm) long by 24 in. (600 mm) wide.7.3.1.4 For formboards 1 in. (25.4 mm) thick or greater, testspecimens shall be 48 in. (1200 mm) long by 32 in. (800 mm)wide.7.4 Rei
23、nforcement, Specification A 82, shall be fabricatedfrom zinc-coated (galvanized) welded or woven steel wiremesh or fabric having an effective cross-sectional area of notless than 0.026 in.2(16.77 mm)2per foot of slab width.Reinforcement shall be free of rust, scale, or other materialsthat reduce bon
24、d to the gypsum concrete.7.4.1 Hexagonal Reinforcing Mesh, shall be fabricated from2 in. (50.8 mm) hexagonal mesh formed of not less than 0.0410in. (1.04 mm) diameter wires with longitudinal wires not lessthan 0.0625 in. (1.59 mm) in diameter, spaced not more than 3in. (76.2 mm) on centers. Steel wi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC9562004STANDARDSPECIFICATIONFORINSTALLATIONOFCASTINPLACEREINFORCEDGYPSUMCONCRETE 现场 浇注 增强 石膏 混凝土

链接地址:http://www.mydoc123.com/p-508973.html