ASTM C1618M-2013 Standard Test Method for Concrete Sanitary Sewer Pipe by Negative (Vacuum) or Positive Air Pressure (Metric)《使用负气压(真空)和正气压混凝土排污管的标准试验方法(公制)》.pdf
《ASTM C1618M-2013 Standard Test Method for Concrete Sanitary Sewer Pipe by Negative (Vacuum) or Positive Air Pressure (Metric)《使用负气压(真空)和正气压混凝土排污管的标准试验方法(公制)》.pdf》由会员分享,可在线阅读,更多相关《ASTM C1618M-2013 Standard Test Method for Concrete Sanitary Sewer Pipe by Negative (Vacuum) or Positive Air Pressure (Metric)《使用负气压(真空)和正气压混凝土排污管的标准试验方法(公制)》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: C1618M 13Standard Test Method forConcrete Sanitary Sewer Pipe by Negative (Vacuum) orPositive Air Pressure (Metric)1This standard is issued under the fixed designation C1618M; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revi
2、sion, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This test method covers procedures for testing of precastconcrete pipe sections, prior to delivery,
3、where maximum fieldleakage rates are specified.1.2 Tests described in this standard are intended to be usedat the point of manufacture of the concrete pipe and are notintended for testing installed pipe (for field tests see PracticesC924, C969, and C1214). The user of this specification isadvised th
4、at individual or multiple pipe sections may be testedfor the purpose of testing the pipe barrel and additionally thejoints in straight alignment when multiple pipe sections aretested.1.3 Test times are based on leakage rates and therefore areproportional only to the pipe diameter and are constant fo
5、r anylength of test pipe or pipeline.1.4 Test times tabulated and the rate of air loss in thisstandard are based on successful testing of installed pipelines.However, since air and water have different physicalproperties, retests of some pipelines not meeting field air testshave been successful when
6、 tested with water. The leakage ratesof 0.0017 CFM/ft2and 0.0003 CFM/ft2, were determinedempirically as the maximums for pipe to meet the 50 and 200gal/(in. of internal diameter) (mile of sewer) (24h) test rates,respectively1.5 The values stated in SI units are to be regarded asstandard. No other un
7、its of measurement are included in thisstandard.NOTE 1The availability of this test procedure for concrete pipe variesfrom location to location. Check with local supplier(s) for availability andrecommendations.1.6 This standard does not purport to address all the safetyconcerns, if any, associated w
8、ith its use. It is the responsibilityof the user of this standard to establish the appropriate safetyand health practices and to determine the applicability ofregulatory limitations prior to its use. See Section 6 for specificsafety precautions.2. Referenced Documents2.1 ASTM Standards:2C822 Termino
9、logy Relating to Concrete Pipe and RelatedProductsC924 Practice for Testing Concrete Pipe Sewer Lines byLow-Pressure Air Test MethodC969 Practice for Infiltration and Exfiltration AcceptanceTesting of Installed Precast Concrete Pipe Sewer LinesC1214 Test Method for Concrete Pipe Sewerlines by Nega-t
10、ive Air Pressure (Vacuum) Test Method3. Terminology3.1 DefinitionsFor definitions of terms related to precastconcrete pipe, see Terminology C822.4. Summary of Test Method4.1 The pipe to be tested shall be sealed at the outer endswith suitable airtight bulkheads. The manufacturer shall chooseto use e
11、ither low-pressure air or negative pressure air (vacuum)test methods to evaluate the condition of the pipe beforedelivery. The change in the internal pressure during a specifiedtime is used to determine the acceptability of the pipe.5. Significance and Use5.1 This is a quality test control performed
12、 at the manufac-turing plant to establish that the finished, shippable pipe meetsthe leakage limits stated in the specifications.6. Safety Precautions6.1 The user of this specification is advised of the following:6.1.1 This test may be dangerous if a pipe is not preparedproperly and proper procedure
13、s are not followed.6.1.2 No one should be allowed near the ends of the pipe ortest bulkheads during the test.1This test method is under the jurisdiction of ASTM Committee C13 onConcrete Pipe and is the direct responsibility of Subcommittee C13.09 on Methodsof Test.Current edition approved July 1, 20
14、13. Published December 2013. Originallyapproved in 2005. Last previous edition approved in 2013 as C1618M 05(2013).DOI: 10.1520/C1618M-13.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume
15、information, refer to the standards Document Summary page onthe ASTM websiteCopyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States17. Apparatus7.1 For positive air pressure test, one bulkhead shall includea remote controlled valve that will
16、release the internal testpressure.7.2 For the low-pressure air test, tie rods or an external testframe that is designed to resist the force caused by internal airpressure shall be used to restrain the bulkheads. The low-pressure air test assembly shall be protected by a relief valveset to release at
17、 a pressure no greater than 42 kPa. Thebulkheads used for negative pressure air tests do not requireexternal restraints.7.3 The pressure or vacuum pumps shall have adequatecapacity to obtain the required test pressure.7.4 The test pressure shall be measured with a gage ormanometer that is precise en
18、ough to measure the increments ofpressure change specified by this standard.7.5 The pressure measuring devices shall be located in asafe area where they can be observed without danger to testpersonnel.8. Preparation of the Pipe8.1 Allow the test pipe to cool to ambient air temperature.NOTE 2A wetted
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC1618M2013STANDARDTESTMETHODFORCONCRETESANITARYSEWERPIPEBYNEGATIVEVACUUMORPOSITIVEAIRPRESSUREMETRIC

链接地址:http://www.mydoc123.com/p-465319.html