ASTM C1487-2002(2007) Standard Guide for Remedying Structural Silicone Glazing《修理结构性硅玻璃门窗的标准指南》.pdf
《ASTM C1487-2002(2007) Standard Guide for Remedying Structural Silicone Glazing《修理结构性硅玻璃门窗的标准指南》.pdf》由会员分享,可在线阅读,更多相关《ASTM C1487-2002(2007) Standard Guide for Remedying Structural Silicone Glazing《修理结构性硅玻璃门窗的标准指南》.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: C 1487 02 (Reapproved 2007)Standard Guide forRemedying Structural Silicone Glazing1This standard is issued under the fixed designation C 1487; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision.
2、A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This guide provides recommendations for remedyingexisting structural sealant glazing (hereinafter called SSG)installations in situ.
3、Remedial work may be necessary when alite of glass is replaced, for routine maintenance, or afterdistress is discovered. This guide focuses on large-scaleremedies.1.2 Committee C24 is not aware of any comparable stan-dards published by other organizations.2. Referenced Documents2.1 ASTM Standards:2C
4、 717 Terminology of Building Seals and SealantsC 1392 Guide for Evaluating Failure of Structural SealantGlazingC 1394 Guide for In-Situ Structural Silicone Glazing Evalu-ationC 1401 Guide for Structural Sealant GlazingE 330 Test Method for Structural Performance of ExteriorWindows, Doors, Skylights
5、and Curtain Walls by UniformStatic Air Pressure DifferenceE 997 Test Method for Structural Performance of Glass inExterior Windows, Curtain Walls, and Doors Under theInfluence of Uniform Static Loads by Destructive MethodsE 1233 Test Method for Structural Performance of ExteriorWindows, Doors, Skyli
6、ghts, and Curtain Walls by CyclicAir Pressure Differential3. Terminology3.1 DefinitionsDefinitions of the terms used in this guideare found in Terminology C 717.3.2 Definitions of Terms Specific to This Standard:3.2.1 distress, nthe individual or collective physical mani-festations of a failure as p
7、erceivable problems. For structuralsealant glazing, such distress may include sealant adhesivefailure, sealant cohesive failure, shifting of a lite, loss of a lite,or water infiltration (see Guide C 1394).3.2.2 qualified person, none with a recognized degree orprofessional registration and extensive
8、 knowledge and experi-ence in the field of structural sealant glazing, and who iscapable of design, analysis, and evaluation in the subject.4. Significance and Use4.1 Guidelines are provided for remedying existing SSGinstallations. Refer to Guide C 1401 for a complete discussionof proper SSG design,
9、 installation, and materials.4.2 Due to the unlimited range of materials that may be usedin a particular building, and because each design is unique, theinformation contained in this guide is general in nature.4.3 This guide should not be the only reference consultedwhen designing remedies for SSG.
10、For example, the localbuilding code and the manufacturers product literature for theactual materials used, if known, also should be considered. Thesealant manufacturer(s) should be involved fully with theremedial design.4.4 This guide is intended to be a resource, but it is not asubstitute for exper
11、ience and judgement in designing remediesfor the specialized types of construction discussed. It isintended to be used in conjunction with other resources as anaid in remedying problems with existing SSG.5. Introduction5.1 There are numerous reasons that a building owner ormanager, hereinafter refer
12、red to as owner, may choose toremedy an SSG system, including routine maintenance or tocorrect discovered deficiencies. Regardless of the reason thatsuch a remedy is undertaken, it is recommended that theremedial design and construction be performed under thesupervision of a qualified person.5.2 It
13、is essential to begin the remedial process with acomprehensive evaluation, in accordance with the guidelinesestablished in Guide C 1394. The underlying cause of failuremust be understood fully prior to implementing a remedy;otherwise, the failure may be repeated.1This guide is under the jurisdiction
14、 ofASTM Committee C24 on Building Sealsand Sealants and is the direct responsibility of Subcommittee C24.10 on Specifi-cations, Guides and Practices.Current edition approved June 1, 2007. Published July 2007. Originally approvedin 2000. Last previous edition approved in 2002 as C 148702.2For referen
15、ced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West C
16、onshohocken, PA 19428-2959, United States.5.3 Based on the outcome of the evaluation, various rem-edies may be indicated. The potential remedies include, de-pending on the pervasiveness and the nature of the problem,the following:5.3.1 Isolated repairs (such as the replacement of an indi-vidual lite
17、 of glass) can be performed by a competent glaziertrained in the proper installation of SSG. If the original SSGwas properly performed, then such minor repairs can beeffected by careful duplication of the original procedures.5.3.2 In-situ remedial work is necessary where pervasiveproblems exist in a
18、n SSG application, such as due to poordesign or workmanship during original construction.5.3.3 Complete reglazing may be necessary in extremecases or at the end of the useful service life, in accordance withthe principles for new SSG. For example, if the existing jointconfiguration does not allow ad
19、equate cleaning to replace astructural joint, it may be necessary to reglaze, becauseadhesion is critical to the performance of SSG and cleaning iscritical to adhesion.5.4 The remainder of this guide particularly addresses thetype of in-situ remedial SSG projects as described in 5.3.2,tocorrect a pe
20、rvasive problem without comprehensive reglazing.6. Remedial Design6.1 If it is determined that a large-scale remedial program isnecessary, then a remedial design should be developed by aqualified person.6.2 Depending on the cause of the problem(s) with theexisting installation, it may not be prudent
21、 to rely on theoriginal SSG design.6.3 The remedial design should include the following:6.3.1 Calculations of the structural sealant stress so that thefinal installation will comply with the SSG industry guidelines(see Guide C 1401) and applicable codes. In some jurisdic-tions, glass replacement tri
22、ggers the requirement to complywith the current building code for glass strength and structuralsealant joint capacity, rather than the code under which thebuilding was originally constructed.6.3.2 Sealant product selection to be compatible with allexisting materials that it will contact.6.3.3 Access
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC148720022007STANDARDGUIDEFORREMEDYINGSTRUCTURALSILICONEGLAZING 修理 结构性 玻璃 门窗 标准 指南 PDF

链接地址:http://www.mydoc123.com/p-464836.html