ASTM A972 A972M-2000(2015) Standard Specification for Fusion Bonded Epoxy-Coated Pipe Piles《熔结环氧树脂涂层钢管桩的标准规格》.pdf
《ASTM A972 A972M-2000(2015) Standard Specification for Fusion Bonded Epoxy-Coated Pipe Piles《熔结环氧树脂涂层钢管桩的标准规格》.pdf》由会员分享,可在线阅读,更多相关《ASTM A972 A972M-2000(2015) Standard Specification for Fusion Bonded Epoxy-Coated Pipe Piles《熔结环氧树脂涂层钢管桩的标准规格》.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: A972/A972M 00 (Reapproved 2015)Standard Specification forFusion Bonded Epoxy-Coated Pipe Piles1This standard is issued under the fixed designation A972/A972M; the number immediately following the designation indicates the yearof original adoption or, in the case of revision, the year of
2、 last revision. A number in parentheses indicates the year of last reapproval.A superscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This specification covers pipe piles with protectivefusion-bonded epoxy powder coating applied by the electro-static
3、spray, flocking, or fluidized bed process.NOTE 1The coating applicator is identified throughout this specifica-tion as the manufacturer.1.2 Other organic coatings may be used provided they meetthe requirements of this specification.1.3 Requirements for the powder coating are contained inAnnex A1.1.4
4、 This specification is applicable for orders in either SIunits (as Specification A972M) or inch-pound units as Speci-fication A972. The values stated in either SI or inch-poundunits are to be regarded as standard. Within the text, theinch-pound units are shown in brackets.1.5 The following precautio
5、nary statement refers to the testmethod portion only, Section 8, of this standard: This standarddoes not purport to address all of the safety concerns, if any,associated with its use. It is the responsibility of the user of thisstandard to establish appropriate safety and health practicesand determi
6、ne the applicability of regulatory limitations priorto use.2. Referenced Documents2.1 ASTM Standards:2A252 Specification for Welded and Seamless Steel PipePilesB117 Practice for Operating Salt Spray (Fog) ApparatusD4060 Test Method for Abrasion Resistance of OrganicCoatings by the Taber AbraserG8 Te
7、st Methods for Cathodic Disbonding of Pipeline Coat-ingsG12 Test Method for Nondestructive Measurement of FilmThickness of Pipeline Coatings on Steel (Withdrawn2013)3G14 Test Method for Impact Resistance of Pipeline Coatings(Falling Weight Test)G20 Test Method for Chemical Resistance of Pipeline Coa
8、t-ings2.2 American Petroleum Institute Specification:4API RP 5L7 Recommended Practice for Internal Fusion-Bonded Epoxy Coating of Line Pipe2.3 National Association of Corrosion Engineers Stan-dards:5TM0175 Visual Standard for Surfaces of New Steel Cen-trifugally Blast Cleaned with Steel Shot or Stee
9、l Grit(NACE No. 2)RP0490 Holiday Detection of Fusion-Bonded Epoxy Exter-nal Pipeline Coatings of 250 to 750 m (10 to 30 mils)2.4 Steel Structures Painting Council Standards:6SSPC VIS 1 Visual StandardsSSPC-SP1 Surface Preparation Specification No. 1: SolventCleaningSSPC-SP10 Near White Blast Cleanin
10、g3. Ordering Information3.1 Orders for pipe piles under this specification mayinclude the following information:3.1.1 Specification for designation and year of issue,3.1.2 Size (pipe pile outside diameter and nominal wallthickness),3.1.3 Quantity.3.1.4 Length,3.1.5 Portions to be coated (full length
11、 or distance fromend),3.1.6 Requirements for certifications (see 4.1 and 12.1),3.1.7 Requirements for material samples (see 4.3),3.1.8 Requirements for patching material (see 4.4),1This specification is under the jurisdiction of ASTM Committee A01 on Steel,Stainless Steel and Related Alloys and is u
12、nder the direct responsibility ofSubcommittee A01.09 on Carbon Steel Tubular Products.Current edition approved Sept. 1, 2015. Published September 2015. Originallyapproved in 1997. Last previous edition approved in 2010 as A972/A972M00(2010). DOI: 10.1520/A0972_A0972M-00R15.2For referenced ASTM stand
13、ards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3The last approved version of this historical standard is referenced onwww.astm.org.4Av
14、ailable from American Petroleum Institute (API), 1220 L. St., NW,Washington, DC 20005-4070, http:/www.api.org.5Available from NACE International (NACE), 1440 South Creek Dr., Houston,TX 77084-4906, http:/www.nace.org.6Available from Society for Protective Coatings (SSPC), 40 24th St., 6th Floor,Pitt
15、sburgh, PA 15222-4656, http:/www.sspc.org.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States13.1.9 Requirements for visual standards for surface cleaningcomparison (see 5.1),3.1.10 Requirements for test frequency (see 8.1, 8.2), and3.1.1
16、1 Requirements for inspections at the manufacturingplant (see 10.1).4. Materials and Manufacture4.1 Steel pipe piles to be coated shall meet the requirementsof Specification A252 as ordered.NOTE 2Surface conditions such as slivers, gouges, laminations, pits,and sharp edges may cause coating applicat
17、ion difficulties and effortshould be made to hold these conditions to a minimum.4.2 The powder coating shall meet the requirements listed inAnnex A1 and shall be approved by the purchaser.4.2.1 If specified in the order, a written certification shall befurnished to the purchaser that properly identi
18、fies the suppliedpowder coating, batch designation of each batch used in theorder, quantity represented, date of manufacture, name andaddress of manufacturer, and states that the powder coating,meets the requirements of Annex A1.4.3 If specified in the order, a representative 0.2 kg 8 ozsample from
19、each batch of the powder coating shall be suppliedto the purchaser. The sample shall be packaged in an airtightcontainer and identified by batch designation.4.4 Patching material shall be compatible with the powdercoating and recommended by the manufacturer of the powdercoating. If specified in the
20、order, patching material shall besupplied to the purchaser.5. Surface Preparation5.1 Prior to blast cleaning, the surfaces of steel pipe piles tobe coated shall be precleaned, as required, in accordance withSSPC-SP1. Steel surfaces shall be cleaned by abrasive blastcleaning to near-white metal in ac
21、cordance with SSPC-SP10.The cleaning media used shall produce an anchor patternprofile of 38 to 100 m 1.5 to 4.0 mils. Either of the followingvisual standards of comparison shall be used to define the finalsurface condition: SSPC VIS 1 or NACE TM0175. Expendedblasting media debris and dust shall be
22、removed from blastedsurfaces prior to applying the powder coating.5.2 Prior to application of the fusion-bonded epoxy powdercoating, raised slivers, scabs, laps, sharp edges, or seams shallbe removed using abrasive grinders. No individual area ofgrinding shall exceed 230 cm236 in.2. The total area o
23、fgrinding shall not exceed 1 % of the total surface area.NOTE 3Pipe piles with excessive grinding should be reblasted prior tocoating to establish a suitable anchor pattern in the ground area.6. Coating Application6.1 The powder coating shall be applied to the cleaned steelsurfaces before visible ox
24、idation occurs, but not exceeding 3 hafter cleaning.6.2 To achieve the required coating thickness (see 7.1), thesteel shall be preheated prior to applying the powder coating inaccordance with the powder coating manufacturers writtenrecommendations. The heat source shall not leave a residue orcontami
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMA972A972M20002015STANDARDSPECIFICATIONFORFUSIONBONDEDEPOXYCOATEDPIPEPILES 环氧树脂 涂层 钢管 标准 规格 PDF

链接地址:http://www.mydoc123.com/p-460195.html