ARMY UFGS-04 01 00 91-2012 RESTORATION AND CLEANING OF MASONRY IN HISTORIC STRUCTURES.pdf
《ARMY UFGS-04 01 00 91-2012 RESTORATION AND CLEANING OF MASONRY IN HISTORIC STRUCTURES.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-04 01 00 91-2012 RESTORATION AND CLEANING OF MASONRY IN HISTORIC STRUCTURES.pdf(37页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-04 01 00.91 (May 2012)-Preparing Activity: USACE SupersedingUFGS-04 01 40 (November 2009)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2012*SECTION TABLE OF CONTENTSDIVISION 04 - MASONRYSECTION 04 01 00.91RESTORATION AND
2、 CLEANING OF MASONRY IN HISTORIC STRUCTURES05/12PART 1 GENERAL1.1 GENERAL REQUIREMENTS1.2 REFERENCES1.3 DEFINITIONS1.3.1 Aggregates1.3.2 Biocides1.3.3 Binder1.3.4 Dispersed Lime Crack Injection1.3.5 Consolidant1.3.6 Dutchman1.3.7 Insitu1.3.8 Joint Sealant1.3.9 Lead Flashing1.3.10 Lime Wash1.3.11 Moc
3、kup1.3.12 Mortar1.3.13 New Elements1.3.14 Patch1.3.15 Remediate1.3.16 Remove1.3.17 Replace1.3.18 Repoint1.3.19 Retool1.3.20 Stucco1.3.21 Surface Treatment1.3.22 Test Panel1.3.23 Tuckpointing1.3.24 Water repellent1.3.25 Wall System1.3.26 Masonry Treatment Requirement (MTR)1.3.27 Saturated Surface Dry
4、 (SSD)1.4 PRE-CONSTRUCTION CONFERENCE1.5 SUBMITTALS1.6 QUALITY CONTROL1.6.1 Quality Control PlanSECTION 04 01 00.91 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.6.2 Qualifications1.6.2.1 Historic Masonry Consultant1.6.2.2 Masonry Firm1.6.2
5、.3 Field Supervision1.6.2.4 Masonry Applicator1.6.3 Project Training Definition and Use1.6.4 Documentation1.6.5 Cleaning and Restoration Mock-ups1.6.5.1 Cleaning and Restoration Methods1.6.5.2 Cleaning Products and Procedures1.6.6 Masonry Mock-ups1.6.6.1 Repointing1.6.6.2 Retooling Stone Masonry Ins
6、itu1.6.6.3 Masonry Removal and Replacement1.6.6.4 Substitute Repair Material1.6.6.5 Crack Repair1.6.6.6 Surface Treatments1.6.6.7 New Masonry Elements1.7 DELIVERY, STORAGE, AND HANDLING1.8 FIELD CONDITIONS1.8.1 General Ambient Conditions1.8.2 Masonry Installation Conditions1.9 WARRANTIES1.9.1 Cleani
7、ng Warranty1.9.2 Repair WarrantyPART 2 PRODUCTS2.1 CLEANING MATERIALS2.1.1 Paint Removers2.1.2 Chemical Cleaners2.1.3 Biocides2.1.4 Liquid Strippable Masking Agent2.1.5 Cleaning Implements2.1.6 Water2.2 REPAIR MATERIALS2.2.1 Mortar and Stucco2.2.1.1 Matching2.2.1.2 Binder Content of Historic Mortar2
8、.2.1.3 Crack Injection2.2.2 Replacement Masonry Materials2.2.2.1 Replacement Brick2.2.2.2 Replacement Stone2.2.2.3 Replacement Terra Cotta2.2.2.4 Replacement Architectural Precast Stone2.2.3 Masonry Elements2.2.3.1 Epoxy Anchor Adhesives2.2.3.2 Metal attachments2.2.3.3 Lead Flashing2.2.4 Surface Tre
9、atments2.2.4.1 Consolidants2.2.4.2 Water Repellents2.3 EQUIPMENT2.3.1 Cleaning Equipment2.3.1.1 Sandblasting2.3.1.2 Water Blasting2.3.2 Spray Equipment2.3.3 Alternative Blasting Methods2.3.4 Drilling EquipmentSECTION 04 01 00.91 Page 2Provided by IHSNot for ResaleNo reproduction or networking permit
10、ted without license from IHS-,-,-2.3.5 Compressed Air SuppliesPART 3 EXECUTION3.1 EVALUATION AND ANALYSIS3.1.1 Mortar Analysis3.1.2 Field (Insitu) Mortar Analysis3.1.3 Taking and Preparation of Samples3.1.3.1 Laboratory Mortar Analysis Equipment3.1.3.2 Laboratory Masonry Unit Evaluation Equipment3.1
11、.4 Binder Analysis3.1.5 Aggregate Analysis3.2 PREPARATION3.2.1 Material Handling and Associated Equipment3.2.1.1 Mixing, Transporting, and Placing Job Materials3.2.1.2 Associated Equipment3.2.2 Protection3.2.2.1 Interior Protection3.2.2.2 Worker Exposures3.3 EQUIPMENT AND TECHNIQUES DEMONSTRATION3.4
12、 MASONRY CLEANING3.4.1 Chemical Cleaners3.4.2 Test Patches3.4.3 Paint Removal3.4.4 Water Cleaning3.4.4.1 Pressure Spraying3.4.4.2 Hand Scrubbing3.4.4.3 Rinsing3.4.5 Chemical Cleaning3.4.5.1 Surface Prewetting3.4.5.2 Acidic Chemical Cleaning3.4.5.3 Alkaline Chemical Cleaning - Prewash Phase3.4.5.4 Al
13、kaline Chemical Cleaning - Afterwash Phase3.4.5.5 pH Testing3.5 MASONRY REPAIR3.5.1 Deterioration Investitgation3.5.2 Repointing Masonry3.5.2.1 Wall Preparation3.5.2.2 Mixing and Installation3.5.3 Presoaking Masonry / Mortar Consistency / Lifts3.5.4 Compression / Joint Finish / Curing3.5.5 Protectio
14、n3.5.6 Retooling Stone Masonry Insitu3.5.7 Masonry Removal and Replacement3.5.8 Substitute Material Repair3.5.8.1 Areas To Be Removed3.5.8.2 Application of Substitute Repair Materials3.5.8.3 Masonry and Substitute Material Repair Finishes and Color3.5.8.4 Patch Anchors3.5.8.5 Holes3.5.8.6 Anchor Ins
15、tallation3.5.8.7 Cleanup3.5.8.8 Dutchman Repairs3.5.9 Crack Injection3.5.9.1 Application of Dispersed Hydrated Lime (DHL)3.5.9.2 Tools and Equipment3.5.10 Surface Treatments3.5.10.1 Stucco3.5.10.2 LimewashesSECTION 04 01 00.91 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitte
16、d without license from IHS-,-,-3.5.10.3 Water Infiltration3.5.10.4 Stone Consolidants3.6 NEW ELEMENTS3.6.1 Structural Upgrades3.6.2 Joint Sealant and Lead Flashing3.7 FINAL CLEANING3.8 PROTECTION OF WORK3.9 DEFECTIVE WORK3.10 FINAL INSPECTION- End of Section Table of Contents -SECTION 04 01 00.91 Pa
17、ge 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-04 01 00.91 (May 2012)-Preparing Activity: USACE SupersedingUFGS-04 01 40 (November 2009)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with
18、UMRL dated April 2012*SECTION 04 01 00.91RESTORATION AND CLEANING OF MASONRY IN HISTORIC STRUCTURES05/12*NOTE: This guide specification covers the requirements for restoration and cleaning of masonry in historic structures.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format
19、Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information
20、and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: Where the words “as indicated“ are used, en
21、sure that sizes, positions and other designated information are indicated on the design drawings.The following publications, from the United States Department of the Interior - National Park Service, provide useful guidance in the restoration of historic masonry and may be included as addenda to the
22、 specifications.The Secretary of the Interiors Standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring, and Reconstructing Historic Buildings (1995).SECTION 04 01 00.91 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted wit
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS040100912012RESTORATIONANDCLEANINGOFMASONRYINHISTORICSTRUCTURESPDF

链接地址:http://www.mydoc123.com/p-449555.html