1、*USACE / NAVFAC / AFCESA / NASA UFGS-03 70 00 (February 2010)-Preparing Activity: USACE (CW) SupersedingUFGS-03 70 00 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION TABLE OF CONTENTSDIVISION 03 - CONCRETESECTION 03 70 00MASS CONCRETE
2、02/10PART 1 GENERAL1.1 UNIT PRICES1.1.1 Concrete for _1.1.1.1 Payment1.1.1.2 Measurement1.1.1.3 Unit of Measure1.1.2 Concrete in Blockouts1.1.2.1 Payment1.1.2.2 Measurement1.1.2.3 Unit of Measure1.1.3 Portland Cement1.1.3.1 Payment1.1.3.2 Measurement1.1.3.3 Unit of Measure1.1.4 Pozzolan (Except Sili
3、ca Fume)1.1.4.1 Payment1.1.4.2 Measurement1.1.4.3 Unit of Measure1.1.5 Ground Granulated Blast-Furnace Slag1.1.5.1 Payment1.1.5.2 Measurement1.1.5.3 Unit of Measure1.1.6 Water-Reducing Admixture (WRA)1.1.6.1 Payment1.1.6.2 Measurement1.1.6.3 Unit of Measure1.1.7 High-Range Water-Reducing Admixture (
4、HRWR)1.1.7.1 Payment1.1.7.2 Measurement1.1.7.3 Unit of Measure1.1.8 Silica Fume, Dry1.1.8.1 Payment1.1.8.2 Measurement1.1.8.3 Unit of Measure1.1.9 Silica Fume, SlurrySECTION 03 70 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.1.9.1 Payme
5、nt1.1.9.2 Measurement1.1.9.3 Unit of Measure1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.3.1 Proportioning Responsibility1.3.2 Design Requirements1.3.3 Air Content1.3.4 Slump1.3.5 Construction Tolerances1.3.6 Tabulations and Definitions1.4 SUBMITTALS1.5 QUALITY ASSURANCE1.5.1 Government Preconstruction Tes
6、ting1.5.1.1 Aggregate Sources1.5.1.2 Cementitious Materials, Admixtures, and Curing Materials1.5.1.3 Materials for Mixture-Proportioning Studies1.5.2 Construction Testing by the Government1.5.2.1 General1.5.2.2 Testing Aggregates1.5.2.3 Cementitious Materials1.5.2.4 Cement from Prequalified Sources1
7、.5.2.5 Pozzolan from Prequalified Sources1.5.2.6 Cement from Nonprequalified Sources1.5.2.7 Pozzolan from Nonprequalified Sources1.5.2.8 Ground Granulated Blast-Furnace Slag1.5.2.9 Chemical Admixtures1.6 DELIVERY, STORAGE, AND HANDLING1.6.1 Cementitious Materials1.6.1.1 Transportation1.6.1.2 Storage
8、1.6.1.3 Separation of Materials1.6.2 Aggregates StoragePART 2 PRODUCTS2.1 MATERIALS2.1.1 Cementitious Materials2.1.1.1 Portland Cement2.1.1.2 Pozzolan Other than Silica Fume2.1.1.3 Ground Granulated Blast-Furnace Slag2.1.1.4 Silica Fume2.1.1.5 Temperature of Cementitious Materials2.1.2 Admixtures2.1
9、.2.1 Air-Entraining Admixtures2.1.2.2 Accelerating Admixture2.1.2.3 Retarding Admixture2.1.2.4 Water-Reducing Admixture2.1.2.5 High-Range Water-Reducing Admixture (HRWRA)2.1.2.6 Expansive Admixture2.1.3 Curing Materials2.1.3.1 Sheet Materials2.1.3.2 Membrane-Forming Curing Compound2.1.3.3 Burlap2.1.
10、4 Water2.1.5 Aggregates2.1.5.1 Aggregate Composition2.1.5.2 Quality of Aggregates2.1.5.3 GradingSECTION 03 70 00 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.1.5.4 Particle Shape2.1.5.5 Nominal Maximum-Size of Aggregate2.1.5.6 Moisture Con
11、tent2.1.5.7 Commercial Concrete Aggregate Sources2.1.5.8 Government Furnished Concrete Aggregate Source2.1.6 Nonshrink Grout2.1.7 Packaged Dry Repair Materials2.1.8 Bonding Agents2.1.8.1 Latex Bonding Agent2.1.8.2 Epoxy Resin2.1.9 Surface Retarder2.2 PLANT AND EQUIPMENT2.2.1 Batch Plant2.2.2 Locatio
12、n2.2.3 Bins and Silos2.2.4 Batching Equipment2.2.5 Laboratory Areas2.2.6 Plant Layout Drawings2.2.7 Mixers2.2.7.1 Stationary Mixer Uniformity Requirements2.2.7.2 Truck Mixers2.2.8 Sampling Facilities2.2.9 Coarse Aggregate2.2.10 Transporting Equipment2.2.10.1 Buckets2.2.10.2 Trucks2.2.10.3 Chutes2.2.
13、10.4 Belt Conveyors2.2.10.5 Pump PlacementPART 3 EXECUTION3.1 PREPARATION FOR PLACING3.1.1 Vibrators3.1.2 Embedded Items3.1.3 Concrete on Earth Foundations3.1.4 Concrete on Rock Foundations3.1.5 Construction Joint Treatment3.1.5.1 Joint Preparation3.1.5.2 Air-Water Cutting3.1.5.3 High-Pressure Water
14、 Jet3.1.5.4 Wet Sandblasting3.1.5.5 Waste Water Disposal3.2 TRANSPORTING AND PLACING3.2.1 Transporting3.2.1.1 Transporting by Bucket3.2.1.2 Transporting by Pump3.2.1.3 Transporting by Belt Conveyor3.2.2 Placing3.2.2.1 Time Interval Between Mixing and Placing3.2.2.2 Hot-Weather Placing3.2.2.3 Cold We
15、ather Placing3.2.2.4 Special Temperature-Controlled Concrete3.2.2.5 Concrete Lifts3.2.2.6 Consolidation3.2.2.7 Placing Concrete in Unformed Curved Sections3.2.2.8 Placing Concrete Underwater3.3 FINISHING3.3.1 Unformed SurfacesSECTION 03 70 00 Page 3Provided by IHSNot for ResaleNo reproduction or net
16、working permitted without license from IHS-,-,-3.3.1.1 Float Finish3.3.1.2 Trowel Finish3.3.1.3 Broom Finish3.3.1.4 Abrasive Aggregate Finish3.3.1.5 High Velocity Finishes3.3.2 Formed Surface Repair3.3.2.1 Classes A, A-HV, providing admixtures such as HRWR admixtures that are a component of the slur
17、ry; and furnishing storage, batching, and recording equipment for silica fume, slurry, used in the concrete bid items. Payment for silica fume, slurry, will be made at the contract price per hundredweight of dry silica fume for:a. “Bid Item _a., first _ kilograms hundredweight.“SECTION 03 70 00 Page
18、 9Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-b. “Bid Item _b., all over _ kilograms hundredweight.1.1.9.2 MeasurementSilica fume, slurry, will be measured for payment based upon the number of kilograms hundredweight of silica fume used in the co
19、ncrete, excluding the amount wasted or used for the convenience of the Contractor. The quantity to be paid for will be determined by multiplying the weight in kilograms pounds of silica fume per cubic meter yard by the number of cubic meters yards of silica fume concrete placed within the pay lines
20、of the structure as determined in accordance with the concrete bid items , divided by 100. The dry weight will be determined by suppliers certificate.1.1.9.3 Unit of MeasureUnit of measure: kilograms hundredweight (100 pounds).1.2 REFERENCES*NOTE: This paragraph is used to list the publications cite
21、d in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article t
22、o automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the p
23、ublish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.ACI INTERNATIONAL (ACI)ACI 117 (2006) Specifications for Tolerances for Concrete Construction and Materials a
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS0370002010MASSCONCRETE 大块 混凝土 PDF