ARMY MIL-T-63443-1982 TELESCOPE ELBOW ASSEMBLY 8211640《8211640曲折望远镜组装》.pdf
《ARMY MIL-T-63443-1982 TELESCOPE ELBOW ASSEMBLY 8211640《8211640曲折望远镜组装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-T-63443-1982 TELESCOPE ELBOW ASSEMBLY 8211640《8211640曲折望远镜组装》.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-T-63443 (AR) 22 March 1982 MILITARY SPECIFICATION TELESCOPE, ELBOW ASSEMBLY: 8211640 This specification is approved for use by all Departments and Agencies of the Depa r tmen t of Defense. 1. SCOPE 1.1 This specification covers the Telescope, Elbow Assembly, 8211640, part of Aiming Circle M2 and
2、 M2A2. 2 APPLICABLE DOCUMENTS 2.1 The following documents, of the issue. in effect on date of invitation for bids or this specification to SPEC I FI CATIONS MILITARY MIL-L-10470 MIL-O- 13 8 3 O MIL-F-13 926 MIL-P-14232 MIL-1-45607 STANDARDS MILITARY MIL-STD-105 request for proposal, form a part of e
3、xtent specified herein. Lights, Instrument: Fire Control Equ i pme n t Optical Components for Fire Control Instruments; General Specification Governing the Manufacture, Assembly, and Inspection of Fire Control Materiel: General Specification Governing the Manufacture and Inspection of Parts, Equipme
4、nt, and Tools for Ordnance Materiel,. Packaging of Inspection Equipment, Supply and Maintenance of Sampling Procedures and Tables for Inspection by Attributes Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improvin this document should be ad
5、dressed to: Commander, US Army Armament desearch and Develo ment Command, Attn. DRDAR-QA, Dover, New Jersey 07801 by using tie self-addressed Standardization Document Improvement Proposal /DD Form 1428) appearing at the end of this document or by letter. FSC 1290 THIS DOCUMENT CONTAINS /o PAGES. Pro
6、vided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-b3V,V3 12 9797906 0350592 8 * MIL-T-63443 (AR) MIL-STD- 109 - Quality Assurance Terms and MIL-STD-8 10 - Environmental Test Methods Definitions DRAWINGS US ARMY ARMAMENT RESEARCH AND DEVELOPMENT COMM
7、AND (ARRADCOM) F8211640 - Telescope, Elbow Assembly PACKAGING DATA SHEET MIL-P-l4232/P5800554 - Packaging of Aiming Circle: M2 W/E MIL-P-l4232/P5911272 - Packaging of Aiming Circle: M2A2 W/E (Copies of specifications, standards, drawings, and packaging data sheets required by suppliers in connection
8、 with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer.) 3 REQUIREmNTS 3.1 Fabrication. The Telescope shall be manufactured in accordance with all drawings applicable to the Telescope speci- fied in the contract or order and draw
9、ings pertaining thereto. 3.1.1 First Article Testing. Requirements for the sub- mission of first article samples by the contractor for testing shall be specified in the contract. 3.2 General Specifications. The contractor shall be responsible for adherence to, and compliance with, the following requ
10、irements of specifications: MIL-F- 139 26 a. Order of precedence b. Dimensions and tolerances c. Inorganic protective surface finishes d. Comm.ercia1 quality e. Part identification and marking f. Wor kma nsh ip 3.3 Environmental Service Conditions. 2 Provided by IHSNot for ResaleNo reproduction or n
11、etworking permitted without license from IHS-,-,-MIL-T-63443 (AR) 3.3.1 Storage Temperature. The Telescope shall show no evidence of failure, such as cement separation, glass breakage, or other physical failure, after having been exposed to and thermally stabilized at ambient temperatures of -8OO an
12、d +1600 Fahrenheit (F) . Subsequently, the Telescope shall meet the requirements of 3.3.2 through 3.4.7 inclusive . 3.3.2 Vibration. The Telescope shall withstand a vibration of 30 + 5 cycles per second (CPS) frequency with an amplitude of 1/16 inch (1/8 inch maximum excursion) for a period of 5 min
13、utes - + 15 seconds. Subsequent to vibration, there shall be no visible damage, cement separation, or loosening of assembled paKts, and the Telescope shall meet the requirements of 3.4.1 through 3.4.7 inclusive . 3.4 Perf ormance. 3.4.1 Cleanliness. Subsequent to vibration, the Telescope shall meet
14、the cleanliness requirement of MIL-0-13830, and there shall be no more than 2 particles of dirt visible on the surfaces of the reticle. Each particle shall.not be in excess of an area equivalent to a size of 1/2 linewidth of the center line of the reticle. There shall be no dirt on other surfaces wh
15、ich interferes with observation or adversely affects image quality. 3.4.2 Sealing. The Telescope shall show no evidence of leakage in excess of 0.2 psig when subjected to an internal pressure of 5.0 + 0.1 psig for a period of 2 hours using dry nitrogen having dew point at least as low as -25OF. 3.4.
16、3 Resolution. The resolving power on the Telescope Optical Axis shall be 14 seconds of arc or less. 3.4.4 Ey epiece Focus. The Eyepiece Focus for the Telescope shall be fixed between the limits of -0.75 and -1.0 diopter. 3.4.5 Open Sight. The line of sight of the Open Sight shall be parallel to the
17、line of sight of the Telescope within 10 mils. 3.4.6 Parallax in Telescope. Parallax between reticle and target image shall be nominally zero at 50 yards and shall not exceed 0.30 mil over a range of 30 to 150 yards. 3 4.7 Illumi na ti on. The Telescope sha 11 meet the “Illuminated Reticles“ require
18、ment of MIL-0-13830. With the Telescope reticle illuminated, the reticle markings shall appear clearly defined when observed in a darkened area. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-T-b34q3 12 U 797770b 0350574 1 MIL-T-63443 (AR) 4.
19、 OUALITY ASSURANCE PROVISIONS 4.1 Responsibility for Inspection. Unless otherwise specified in the contract or purchase order, the supplier is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the supplier may utilize his own facilitie
20、s or any commercial laboratory acceptable to the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4 . 1.1 Genera 1 Prov isions
21、 . The component and subassembly inspection requirements of MIL-F-13926 form a part of the Quality Assurance Provisions of this specification. Definitions of inspection terms shall be as listed in MIL-STD-109. 4.2 First Article (initial production) Approval. The requirement for first article approva
22、l and the responsibility (Government or Contractor) for first article testing shall be as specified in the contract. The sample for first article approval tests shall consist of (2) Aiming Circles plus (3) each of all items covered by SQAP. The sample shall be manufactured in the same manner, using
23、the same materials, equipment, processes, and procedures, as used in regular production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as used in regular production. 4.2.2 Contractor Testing. When the contractor is responsible for conducti
24、ng First Article Approval Tests, the sample shall be inspected-by the contractor- for all the. require- ments of the contract. The sample and a record of this inspec- tion, including certificates of conformance for materials, shall be submitted to the Government for approval. The Government reserves
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILT634431982TELESCOPEELBOWASSEMBLY82116408211640 曲折 望远镜 组装 PDF

链接地址:http://www.mydoc123.com/p-448927.html