ARMY MIL-P-70675-1988 POWER SUPPLY ASSEMBLY FOR MINES M718A1 M741 SYSTEM《M718A1 M741式地雷系统用电源组件》.pdf
《ARMY MIL-P-70675-1988 POWER SUPPLY ASSEMBLY FOR MINES M718A1 M741 SYSTEM《M718A1 M741式地雷系统用电源组件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-70675-1988 POWER SUPPLY ASSEMBLY FOR MINES M718A1 M741 SYSTEM《M718A1 M741式地雷系统用电源组件》.pdf(18页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-P-70675(AR) 23 JULY 1988 MILITARY SPECIFICATION PONER SUPPLY ASSEMBLY, FOR MINES, M718Al/M7 4l.A1, SYSTEM This specification is approved for use within U.S. Army Armament, Munitions and Chemical Command, and is available for use by all Departments and Agencies of the Department of Defense. 1. SC
2、OPE 1.1 Scope. This specification contains requirements and provides Quality Assurance provisions for the fabrication of parts, assembly and packing of Power Supply Assembly used in the M718Al/M74lAl Mines, Electronic Assembly. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specification an
3、d standards. The following documents of the issue in effect on date of invitation for bids or request for proposals, from a part of this specification to the extent specified herein. Unless otherwise specified, the issues of these documents shall be those listed in the issue of the Department of Def
4、ense Index of specifications and Standards (DoDiSS) and supplement thereto, listed in the solicitation. SPECIFICATIONS MILITARY MIL-S-45743 - Soldering, Manual Type, High Reliability MIL-A-48078 - Ammunition, Standard Quality Assurance Electrical and Electronic Equipment. Provisions, General. Specif
5、ications For. STANDARDS MIL-STD-105 - Sampling Procedures and Tables For Inspection By Attributes. Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in Impraving this document should be addressed to: Commander, U.S. Army Arrnament,Munitions and Ch
6、emical Command, Attn. AMSMC-QA. Picatinny Arsenal, New Jersey 07806-5000 by using the self-addressed Standardiza- tion Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. 1 1 OF 18 A?SC N/A FSC 1345 DISTRIBUTION STATEMENT A. Approved for public release; d
7、istribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I t MIL-P-70675 13 W 777770b 035bb71 7 W MIL-P-70675 (AR) MIL-STD-202 - Test Methods for Electronic and Electrical MIL-STD-1168 - Lot Numbering of Ammunition MIL-STD-1169 - Pac
8、kagingr Packing and Marking For Shipment Component Parts. Of Inert Ammunition Components. 2.1.2 Other Government documents, drawings, - and publications. 1-1_ The following other Government documents, drawings and publications form a part of this specification to the extent specified herein. Unless
9、otherwise specified, the issues shall be those in effect on the date of the solicitation. -.-.- DRAWINGS US ARMY ARMAMENT RESEARCH, DEVELOPMENT AND ENGINEERING CENTER (ARDEC) 9287159 - Molding, Power Supply 9342580 - Power Supply Assembly (Copies of specifications, standards, drawings and publicatio
10、ns required by manufacturers in connection with specific acquisition functions should be obtained from the contracting activity or as directed by the Contracting Officer) . 2.2 - Order -_ .- . - of -L arecedence. I .- - -.- .-.-.- In the event of a conflict between the text of this specification and
11、 the references cited herein (except for associated detail specifications, specification sheets or MS standards), the text of this specification shall take precedence. Nothing in this specification, however, shall supersede applicable laws and regulations unless a specific exemption has been obtaine
12、d. 3. REQUIREMENTS 3.1 _l_l-.- Materials. - Materials shall be in accordance with the 3.2 Components _I_.-._II_ and assemblies. -I The components and assemblies applicable drawings and specifications. shall comply with all requirements specified on drawing 9342580 and 9287159 with al1 requirements s
13、pecified in applicable specifications and standards. 3.3 Electrical - requirement. 3.3.1 l-l_-ll- Non-activated voltage. Each battery cell shall be unactivated and measure less than O05 volts. 3.3.2 Shortingbar - -I.- resistance. The shorting bar and connector assembly shall have less than 0.8 ohm r
14、esistance measured between , the terminals. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- _ MIL-P-70675 13 m 7979906 035bb72 9 M MIL-P-70 67 5 (AR) 3.4 Battery lead weld sul1 test. The battery assembly lead welds shall not fail or show any evide
15、nce of tearing or breaking when the leads are subjected to a five (5) pound plus two (2) pounds pull. 3.5 Battery lead weld integritx. The battery assembly lead welds shall not show any evidence of fracture, crack or any damage to the battery case (hole in case). 3.6 Soldering. 3.6.1 - Shorting bar
16、and connector assembly solder -.-L. workmanshin Soldering of the shorting bar and connector assembly shall be in accordance with MIL-S-45743. . 3.6.2 Solderability. The power supply assemblies ribbon leads shall comply with solderability requirements of MIL-5-45743. 3.7 First article inspection. Whe
17、n specified in the contract or purchase order, a sample shall be subjected to first article inspection in accordance with technical provisions herein. (See 4.3) 3.8 Workmanship. All parts and assemblies shall be fabricated and finished in a thorough workmanlike manner and all manufacturing processin
18、g and assembly operations shall be correctly performed. All parts shall be free from chips, dirt, grease, corrosion products and other foreign matter. The cleaning method used shall not be injurious to any part nor shall the part be contaminated by the cleaning agents. All marking and stamping shall
19、 be neat and sharply defined. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the performance of a1 inspecstion requirements as specified herein. Except as otherwise specified in the co
20、ntract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification wher
21、e such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. Unless otherwise specified herein, or in the contract, the provisions of MIL-A-48078 shall apply, and are hereby made a part of this detail specification. 3 Provided by IHSNot for ResaleNo rep
22、roduction or networking permitted without license from IHS-,-,-MIL-P-70b75 13 m 77777Ob 035bb73 O m 0 a* MIL-P-70675 (AR) 4.1.1 Responsibility Cor compliance. All items must meet all requirementcof section 3 and 5. The inspection set forth in this specification shall become a part of the contractors
23、 overall inspection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of assuring that all products or supplies submitted to the Government for accestance comply with all requirements of the contract. Sam
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP706751988POWERSUPPLYASSEMBLYFORMINESM718A1M741SYSTEMM718A1M741 地雷 系统 用电 组件 PDF

链接地址:http://www.mydoc123.com/p-446934.html