ARMY MIL-P-60938-1968 PELLET SMOKE MARKER FOR CARTRIDGE 105MM APERS-T《105 mm曳光杀伤弹(APERS-T)用烟标颗粒》.pdf
《ARMY MIL-P-60938-1968 PELLET SMOKE MARKER FOR CARTRIDGE 105MM APERS-T《105 mm曳光杀伤弹(APERS-T)用烟标颗粒》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-60938-1968 PELLET SMOKE MARKER FOR CARTRIDGE 105MM APERS-T《105 mm曳光杀伤弹(APERS-T)用烟标颗粒》.pdf(13页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-P-60938 13 II 999306 03Li2292 O W- .JI 4.-2W)J( MIL-P-60938 (MU) 20 February 1968 MILITARY SPECIFICATION PELLET, SMOKE MARKER FOR CARTRIDGE, 105MM: APERS-T, XM546 1. SCOPE 1.1 This specification covers Pellet, Smoke Marker, 2. APPLICABLE DOCUMENTS 2.1 made for use in Cartridge, 105MM:. APERS-T,
2、XM546. The following documents of the issue in effect on date of invitation for bids or request for proposals, form a part of this specification to the extent specified herein. SPECIFICATIONS FEDERAL PPP-B-636 - Boxes, Fiber PPP-F-320 - Fiberboard; Corrugated and Solid, Sheet Stock (Container Grade)
3、, and Cut Shapes PPP-T-45 - Tape, Gummed, Paper, Reinforced UV-T-106 - Tape, Pressure-Sensitive Adhesive, Paper, Draft ing MILITARY MIL-B-117, - Bags, Interior Packaging .MIL-B-2427 - Boxes, Ammunition Packing; Wood, Nailed MIL-C-2439 - Container, Ammunition, Fiber, Spirally Wound MIL-A-2550 - Ammun
4、ition and Special Weapons, General Specification for MIL-1-45607- Inspection Equipment, Supply and Maintenance of STANDARDS MILITARY MIL-STD-105 - Sampling Pr0cedure.s and Tables for MIL-STD-109 - Quality Assurance Terms and Definitions MIL-STD-1168 - Lot Numbering of Ammunition MIL-STD-1235 - Singl
5、e and Multilevel Continuous Inspection by Attributes (ABC-STD-105) Sampling Procedures and Tables for Inspect ion by Attribut es FSC: i315 THIS DOCUMENT CONTAINS /2 PAGES. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-60738 13 7777706 03L1227
6、3 2 MIL-P-60938 (MU) DRAWINGS ARMY 8796522 - Marking Diagram and Sealing for Wood 9230453 - Pellet, Smoke Marker Packing Boxes PUBLICATIONS ARMY ET-9230453 - Equipment Tabulation (Copies of specifications, standards, drawings and publications required by suppliers in connection with specific procure
7、ment functions should be obtained from the procuring activity or as directed by the contracting officer.) 3 REQUIREMENTS 3.1 Material.-Material shall be in accordance with the applicable drawings and specifications. 3.2 Pellet.-The pellet shall comply with all requirements specified on Drawing (dwq.
8、) 9230453 and all requirements specified in the applicable drawings and specifications. specified shall be utilized and no ingredients shall be omitted. charge composition and the igniter charge composition shall not exceed the applicable drawing requirements when tested in accordance.with 4.4.1. 3*
9、3 Compositions.-No ingredients other than those 3.4 Moisture content.-The moisture content of the smoke 3.5 Static functioning 3.5.1 Delay.-The delay in functioning shall not exceed 0.25 seconds when tested in accordance with paragraph 4.4.2. 3.5.2 Duration.-The smoke emission shall be maintained fo
10、r a minimum of 2.0 seconds when tested as specified in paragraph 4.4.2. smoke within 80 feet of projectile first function and trail smoke for a distance of 1000 feet, minimum, when tested as specified in 4.2.3. workmanlike manner. The pellet shall be free of dirt, chips and other foreign matter and
11、shall not exhibit excessive cavitation or broken interfaces. All packing components shall be dry. 3.6 Ballistic functioning.-The pellet shall generate black 3.7 Workmanship.-The pellet shall be fabricated in a thorough 2 f Provided by IHSNot for ResaleNo reproduction or networking permitted without
12、license from IHS-,-,- -T MIL-P-bo738 13 W 7997706 0342274 4 m MIL-P-60938 (Mu) IV 3.8 First article.-This specification makes provisions for first article inspection. Requirements for the submission of first article samples by the contractor shall be as specified in the contract. 4. QUALITY ASSURANC
13、E PROVISIONS 4.1 General quality assurance provisions.-Unless otherwise specified in the contract or purchase order, the supplier is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the supplier may utilize his own facilities or any c
14、ommercial labqratory acceptable to the Government. The Government reserves the right. to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. Reference shall be made to Standard M
15、IL-STD-109 in order to define terms used herein. The provisions of Specification MIL-A-2.550 shall apply. of product is submitted to the Government for acceptance, the contractor shall supply the following information accompanied by a certificate which attests that the information provided is correc
16、t and applicable to the product being submitted: a. A statement that the lot complies with all of the quality assurance provisions specified within this specification. b. Number of units of product inspected. c. Results obtained, by defect code, for all inspections performed. d. Drawing, specificati
17、on number and date, together with an identification and date of changes. e. Certificates of conformance on all material purchased by the contractor when such material is controlled by Government or commercial specifications referenced in any of the contractual document s. The certificate shall be si
18、gned by a responsible agent of the certifying organization. The initial certificate submitted shall be substantiated by evidence of the agents authority to bind his principal. Substantiation of the agents authority will not be required with subsequent certificates unless, during the course of the co
19、ntract, this aukhority is vested in another agent of the certifying organization. 4.1.1 Submission of product.-At the time the completed lot f. Number of items in the lot. g. Date submitted. 4.2 Ftrst Article Inspection 4.2.1 Submission.-The contractor shall submit a first article sample as designat
20、ed by the contracting officer for 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-60738 13 O 777770b 0342275 b O MIL-P-60938 (MU) evaluation in accordance with the provisions of 4.2.2. The first article sanple shall consist of 40 pellets sepa
21、rately packaged in quantities of 10 units each which have been produced by the contractor or furnished by a supplier and r.:hich have been manufactured using the same prouction pro- cesses, procedures and eauipment which will be used in ful- fillirig the contract. All parts and materials, including
22、pack2ging and packing;, shall be obtaified from the same source -of suoply ii.s will be used iT rezular production. Prior to sukrr,fssicn, the contractor shall inspect the canple to the Gagnee fiecescary to assure that it conforms to the requirements of the contract and suhit a record of this inspec
23、tion with the sarr,?,le, incluing statements of findings for nnterials, processes n tests. A sanple containina known defects will not be sub- mitted .ur.lcss specifically athorized, k:y the contracting Officsr. A first article sengle, or portion thereof, as dir2cted by the contractinr officer, shall
24、 also be submitted Whezever there is a lapse in production for a period in excess of 90 days or wkenever a change occurs in manufacturing pocess, naterial used, drawing or specification such as to significantly affect product uniformity as determined by the Government . 4.2.2 Inspections to be perfo
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP609381968PELLETSMOKEMARKERFORCARTRIDGE105MMAPERST105MM 曳光 杀伤 APERST 烟标 颗粒 PDF

链接地址:http://www.mydoc123.com/p-446703.html