ARMY MIL-P-48231-1973 PROPELLANT M6 FOR USE IN CARTRIDGE 105MM APERS-T M494《M494式105毫米曳光杀伤弹(APERS-T)用M6发射药》.pdf
《ARMY MIL-P-48231-1973 PROPELLANT M6 FOR USE IN CARTRIDGE 105MM APERS-T M494《M494式105毫米曳光杀伤弹(APERS-T)用M6发射药》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-48231-1973 PROPELLANT M6 FOR USE IN CARTRIDGE 105MM APERS-T M494《M494式105毫米曳光杀伤弹(APERS-T)用M6发射药》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-P-48231 (MU) 2 August i973 SUPERSEDING See Section 6.9 MILITARY SPECIFICATION PROPELLANT M6 FOR USE IN CARTRIDGE, 105MM APERS-T, M494 1. SCOPE 1.1 This specification covers M6 Propellant for use in the M494 Cartridge employed with the 105MM, M68 Gun. 2. APPLICABLE DOCUMENTS 2.1 The following doc
2、uments of the issue in effect on date of invitation for bids, or request for proposal, form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-A-2550 - Ammunition and Special Weapons; General Specification for STANDARDS MILITARY MIL-STD-109 MIL-STD-652 MIL-STD-1
3、168 - Lot Numbering of Ammunition MIL-STD-1171 - Acceptance and Description Sheets for MIL-STD-414 - Quality Assurance Terms and Definitions - Propellants Solid for Cannons Require- ments and Packing Propellants and Explosives Inspection by Variables for Percent Defective - Sampling Procedures and T
4、ables for A Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-48231 13 = 779990h 03176115 3 MIL-P-48231 (MU) a chamber pressure greater than 47,000
5、psi at any operating temperature (-5OOF to 4-145OF) when fired in a standard weapon. 3.3 Workmanship. The best commercial practices shall be used in the formulation of propellant furnished under this specification, and all other applicable documents. The propellant and its standard ingredients shall
6、 be protected from the action of direct sunlight and acid fumes. No reground propellant or nitrocellulose shall be used in the manufacturer of propellant procured under this specification unless otherwise specified. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise
7、specified in the contract or purchase order, the supplier is responsible for the performance of all inpsection requirements as specified herein. Except as otherwise specified in the contract or order, the supplier may use his own or any other facilities suitable for the performance of the inspection
8、 requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the fnspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. Reference shall be
9、made to MIL-STD-109, in order to define terms used herein. The provisions of MIL-A-2550 shall apply. 4.1.1 Submission of product. At the time the completed lot of product is submitted to the Government for acceptance, the contractor shall supply the following information accompanied by a certificate
10、 which attests that the information provided is correct and applicable to the product being submitted : the quality assurance provisions specified within this specification. made available upon request by the contracting officer). inspections performed (shall be made available upon request by the co
11、ntracting officer). with an identification and date of changes. a. A statement that the lot complies with all of b. Number of batches of product inspected (shall be c. Results obtained, by defect code, for all d. Drawing, specification number, and date, together 3 .- -, . - .- - -. . Provided by IHS
12、Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIbP-4.8231 (MU) e. Certificates of conformance on all material purchased by the contractor when such material is controlled by Government or commercial specifications referenced in any of the contracting documents (s
13、hall be made available upon request by the contracting officer). f. Number of items in the lot. g. Date submitted. h. Eight copies of propellant description sheet SMU Form 1060 containing the applicable data (see 6.8) 4.1.2 The certificate shall be signed by a responsible agent of the certifying org
14、anization, submitted shall be substantiated by evidence of the agents authority to bind his principal. authority will not be required with subsequent certificates unless, during the course of the contract, this authority is vested in another agent of the certifying organization. The initial certific
15、ate Substantiation of the agents 4.2 Inspection provisions 4.2.1 Lot formation. The term as used throughout, this specification, refers to an inspection lot, which is defined as an essentially homogeneous quantity of propellant from which the sample was drawn and shall not be construed to represent
16、any prior or subsequent quantities presented for inspection. A lot shall consist of one or more sub-lots or one or more batches of M6 propellant produced by one manufacturer, in accordance with the same specification and same specification revision, under one continuous set of operating conditions.
17、Each lot shall consist of that quantity of M6 propellant which has been subjected to the same unit chemical or physical process intended to make the final product homogeneous. 42.2 Testing 4.2.2.1 Materials (see 3.1). Each lot of propellant shall be sampled and tested for composition, form, dimensio
18、ns and chemical-physical properties in accordance with MIL-STD-652. 4.2.2.2 Proving ground (see 3.2). Each lot of propellant shall be sampled for proving ground tests in accordance with MIL-STD-652. 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-4
19、.2.2.2.1 Assessment (see 3.2.1). Major defect, Code No. 01001 (see 6.4). The lot shall be rejected if the assessed charge weight of propellant has an expected pressure greater than 39,000 psi. 4.2.2.2.2 Velocity uniformity. (TOOF) (See 3.2.2) Major defect, Code No. 0200l. If the product of the facto
20、r (see 6.5) times the velocity standard deviation of the rounds tested in accordance with 4.3.3 exceeds the applicable requirement the lot shall be rejected. For initial production lots a ten round sample shall be tested (see 6.6) 4.2.2.2.3 Individual pressure (see 3.2.3) 4.2.2.2.3.1 Initial product
21、ion 4.2.2.2.3.1.1 Permissible individual maximum pressure. If any individual pressure observed during uniformity firings at any operating temperature (-50F to ti45OF) after correction for difference between as fired and recommended service charge weight exceeds 47,000 psi, the lot shall be rejected.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP482311973PROPELLANTM6FORUSEINCARTRIDGE105MMAPERSTM494M494 105 毫米 曳光 杀伤 APERST M6 发射 PDF

链接地址:http://www.mydoc123.com/p-446363.html