ARMY MIL-DTL-398 D-1996 RDX (CYCLOTRIMETHYLENETRINITRAMINE)《旋风炸药(超临界二氧化碳)》.pdf
《ARMY MIL-DTL-398 D-1996 RDX (CYCLOTRIMETHYLENETRINITRAMINE)《旋风炸药(超临界二氧化碳)》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-DTL-398 D-1996 RDX (CYCLOTRIMETHYLENETRINITRAMINE)《旋风炸药(超临界二氧化碳)》.pdf(35页珍藏版)》请在麦多课文档分享上搜索。
1、INCH-POUNDMIL-DTL-398D12 December 1996SUPERSEDINGMIL-R-398C22 August 1962DETAIL SPECIFICATIONRDX(CYCLOTRIMETHYLENETRINITRAMINE)This specification is approved for use by all Departments andAgencies of the Department of Defense.1. SCOPE1.1 Scope. This specification covers the requirements,examinations
2、 and tests for two types of RDX for use in explosivecompositions as follows: (see 6.1).Type I - RDX made by the nitric acid process (see 6.8).Type II - RDX made by the acetic anhydride process (see 6.8).2. APPLICABLE DOCUMENTS2.1 General. The documents listed in this section areneeded to meet the re
3、quirements specified in sections 3, 4 and 5of this specification. This section does not include documentsin other sections of this specification or recommended foradditional information or as examples. While every effort hasbeen made to ensure the completeness of this list, document usersare caution
4、ed that they must meet all requirements documentscited in sections 3, 4 and 5 of this specification, whether ornot they are listed.Beneficial comments (recommendations, additions, deletions) and anypertinent data which may be of use in improving this document, should beaddressed to: Commander, U.S.
5、Army ARDEC, ATTN: AMSTA-AR-EDE-S, PicatinnyArsenal, NJ 07806-5000 by using the Standardization Document ImprovementProposal (DD Form 1426) appearing at the end of this document or by letter.AMSMC N/A FSC 1376Distribution Statement A. Approved for public release;distribution is unlimited.Provided by
6、IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-398D22.2 Government documents.2.2.1 Specifications, standards and handbooks. Thefollowing specifications, standards and handbooks form a part ofthis document to the extent specified herein. Unless otherwise
7、specified, the issues of these documents are those listed in theissue of the Department of Defense Index of Specifications andStandards (DODISS) and supplement thereto, cited in thesolicitation (see 6.2).SPECIFICATIONSFEDERALRR-S-366 - Sieves, Standard for Testing PurposesSTANDARDSDEPARTMENT OF DEFE
8、NSEMIL-STD-1168 - Lot Numbering of AmmunitionMIL-STD-1235 - Single and Multilevel ContinuousSampling Procedures and Tables forInspection by AttributesMIL-STD-1751 - Safety and Performance Tests forQualification of ExplosivesDOD-STD-2101 - Classification of Characteristics(Unless otherwise indicated,
9、 copies of the above specifications,standards and handbooks are available from DODSSP - CustomerService, Standardization Documents Order Desk, 700 RobbinsAvenue, Bldg. 4D, Philadelphia, PA 19111-5094).2.2.2 Other Government documents, drawings and publications.The following other Government document
10、s, drawings andpublications form a part of this document to the extent specifiedherein. Unless otherwise specified, the issues are those citedin the solicitation.DRAWINGSHolston Defense Corp. Engineering Drawing No. 7651-1028.48, 7651-1028.49 asterisks(*) indicate one hundred percent inspection. If
11、sample sizeexceeds lot size, perform one hundred percent inspection. Accepton zero and reject on one or more for all inspection levels.b. Alternative conformance inspection provisions. Unlessotherwise specified herein or provided for in the contract,alternative conformance inspection procedures, met
12、hods orequipment, such as statistical process control, tool control,variables sampling or other types of sampling plans, etc., may beused by the contractor when they provide, as a minimum, the levelof verification required by the provisions specified herein.Prior to applying such alternative procedu
13、res, methods, orequipment, the contractor shall describe them in a writtenproposal submitted to the Government for evaluation (see 6.14).When required, the contractor shall demonstrate that theeffectiveness of each proposed alternative is equal to or betterthan the specified conformance inspection p
14、rovision(s) herein.In cases of dispute as to whether the contractors proposedalternative(s) provides equivalent assurance, the provisions ofthis specification shall apply. All approved alternativeprovisions shall be specifically incorporated into thecontractors quality program or detailed inspection
15、 system, asapplicable.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-398D104.5.2.1 RDX (cyclotrimethylenetrinitramine). (Classification ofCharacteristics)Conformance Requirement InspectionCriteria Paragraph MethodReferenceCritical None defin
16、edMajor101 Melting point determination 4.6.1 3.2 4.7.1102 Insoluble particles 4.6.1 3.2 4.7.2103 Acetone insoluble material 4.6.1 3.2 4.7.3104 Inorganic insoluble material 4.6.1 3.2 4.7.4105 Acidity determination 4.6.1 3.2 4.7.5106 Granulation determination 4.6.1 3.3 4.7.6107 HMX content 4.6.1 3.2 4
17、.7.7108 Impact sensitivity 4.6.1 3.2 4.7.8Minor201 Workmanship 4.6.1 3.5 4.7.94.6 Sampling and inspection equipment.Hazard NoticeThe materials described herein are flammable or explosive orboth. Consequently, they present hazards in manufacture,handling, storage and shipment. The contractor should r
18、ecognizethese hazards and take appropriate measures to guard and protectagainst fire, explosion, adverse environment, corrosiveatmosphere, rough handling and electrically-induced incidents.4.6.1 Sampling. The tests depicted in paragraphs 4.7.1through 4.7.9 shall be performed on an approximate twelve
19、 (12)ounce sample representative of the batch and taken in accordancewith ASTM Procedure E300-70 for solids. The selection of batchesfor inspection sampling and testing shall be in accordance withMIL-STD-1235, CSP-1, Plan, Sample Frequency Code Letter B, AQL6.5%. If any sample fails to meet any test
20、 requirement, thebatch represented by the sample shall be rejected. All batchesproduced between the time that the last batch was tested andaccepted and the batch which failed shall be tested in accordancewith the applicable methods given in paragraph 4.7. If any ofthese batches fail to meet any of t
21、he test requirements, thatbatch shall also be rejected. In addition, after any failure ofa batch the contractor will return to 100% inspection until “i”successive batches are accepted as required by MIL-STD-1235. Theclassification shall be as given in Table 4.5.2.1.Provided by IHSNot for ResaleNo re
22、production or networking permitted without license from IHS-,-,-MIL-DTL-398D114.6.2 Inspection equipment. Commercially availableinspection equipment shall be used for all examinations and testsspecified in 4.5 and 4.7. The contractor is responsible to havethe necessary equipment available, use it co
23、rrectly and to assurethat proper calibration procedures are followed. The designationof an instrument of a particular make or model number is notintended to preclude the use of an equivalent make or model whichis capable of performing the required test. Government approvalof all inspection equipment
24、 is required prior to its use foracceptance purposes. Inspection equipment designs shall besubmitted to the Technical Agency (see 6.12).4.7 Methods of inspection. The following tests shall beperformed using prescribed analytical procedures for replicatedetermination given in standard and analytical
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILDTL398D1996RDXCYCLOTRIMETHYLENETRINITRAMINE 旋风 炸药 临界 二氧化碳 PDF

链接地址:http://www.mydoc123.com/p-444204.html