ARMY MIL-C-50243-1971 CARTRIDGE 40MM HE M383 LOADING ASSEMBLING AND PACKING《M383型40MM高爆炮弹 金属零件的主体组件 装卸 组装和包装》.pdf
《ARMY MIL-C-50243-1971 CARTRIDGE 40MM HE M383 LOADING ASSEMBLING AND PACKING《M383型40MM高爆炮弹 金属零件的主体组件 装卸 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-50243-1971 CARTRIDGE 40MM HE M383 LOADING ASSEMBLING AND PACKING《M383型40MM高爆炮弹 金属零件的主体组件 装卸 组装和包装》.pdf(25页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-C-50243 (MU)/ 4 August 1971 (See 6.11) MILITARY SPECIFICATION CARTRIDGE, 40MM, HE, M383 LOADING, ASSEMBLING AND PACKING 1. SCOPE 1.1 This specifications covers the loading, assembling and packing for one type of cartridge designated as Cartridge, 40MM, HE, M383. . 2. APPLICABLF: DOCUMENTS SPECIF
2、ICATIONS 1Ct LI TARY MIL-P-116 MIL-A-2550 MIL-1-4 5607 MIL-P-60942 STANDARDS MILITARY 2.1 The following documents of the issue in effect on date of invitation for bids or request for proposal, form a part of this specification to the extent specifie,d herein: Preservation, Method of Ammunition and S
3、pecial Weapons, General Specification for - Inspection Equipment, Acquisition, Maintenance and Disposition of Primer Percussion for 4OMM - - . hurtunition -: 1310 P Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-50213 13 999990b 0325808 L . MI
4、L-C-50243 (MU) MIL-STD-109 - Quality Assurance Terms and Definitions MIL-STD-331 - Fuze and Fuze Components, Environmental and Performance Tests for MIL-STD-1168 - Lot Number of Ammunition MIL-STD-1235 - Single and Multilevel Continuous Sampling Procedures and Tables for Inspection by Attributes DRA
5、WINGS US ARMY MUNITIONS COMMAND 9241371 - Cartridge, OMM, HE, M383 .PUBLICATIONS ARMY ET-9241371 - Equipment Tabulation (Copies of specifications, standards, drawings and publications required by suppliers in connection with specific procurement functions should be obtained from the procuring activi
6、ty or as directed by the Contracting Officer.) Other publications.-The following documents form a part of thls specification to the extent specified herein. Un- less otherwise indicated, the issue in effect on the date of invitation for bids or request for proposal shall apply. 2.2 CODE OF FEDERAL R
7、EGULATIONS Title 49 Transportation, Parts 0-190 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- - MIL-C-502q3 13 999790b 0325809 3 MIL-C-50243 (MU) (The Code of Federal Regulations is available from the Superintendent of Documents, U.S. Government
8、 Printing Office, Washington, D.C. 20402. Orders should specify 49 CFR 0-190 (latest revision) . 1 3. REQUIREMENTS 3.1 Material.-Materials shall be in accordance with the applicable drawings and specifications. 3.2 Cartridge.-The cartridge shall comply with all requirements specified on Drawing (dwg
9、.) 9241371, all associated drawings and with all requirements specified in applicable specifications. 3.3 Air pressure.-The cartridge shall withstand an air pressure of three (3) pounds per square inch (psi) for five (5) seconds, minimum (min.) without a drop in pressure when tested as specified in
10、4.4.12. 3.4 X-Ray examination of fuze assemblies prior to assembling to body assembly.-The fuze assembly shall be x-rayed for improper- ly assembled, missing parts, armed or partially armed (as evidenced by the detonator moving aq degree from the safe position or pre- sence of the setback pin seated
11、 against bottom surface of the rotor plate (Dwg. 8876197) counterbore) when tested as specified in 4.4.8. 3.5 X-ray examination of ballistic samples.-Prior to for- warding the cartridges to the proving ground for ballistic test- ing, as specified in 4.3.3.15 and 4.3.3.17, they shall be subjected to
12、x-ray examination when tested as specified in 4.4.7. 3.6 Transportation Vibration.-The.cartridge shall be safe and operable after test specified in 4.4.9. 3.7 Functioning 3.7.1 Cartrid e.-The cartridge shall function satisfactorily and the project1 _rie e shall have a mean velocity of 795 + 20.0 fee
13、t per second (fps) and a standard deviation not exceeding 15.0 fps when tested as specified in 4.4.13. The action time of the cart- ridge when tested as specified in 4.4.13 shall be 4.0 milliseconds, maximum. 3 1 Provided by IHSNot for ResaleNo reproduction or networking permitted without license fr
14、om IHS-,-,-MIL-C-5 02 4 3 (MU) 3.7.2 Safet .-There shall be no premature burst (See 6.7) or evidence 7.-y- t ereof in any of the test firings when teste6 as specified in 4.4.13. 3.8 Workmanship.-All parts and assemblies shall be fab- ricated, loaded and assembled in a thorouqh, workmanlike manner. T
15、hey shall be free of burrs, sharp edges,-cracks, dirt, grease, rust and other foreign matte:. The cleaning method used shall not be injurious to any part, nor shall the parts be contaminated by the cleaning agents. Exterior surface coat.ings shall be continuous except for a few light scratches not e
16、xposing base material. All required markings shall be neat and sharply defined. 3.9 Submission of results of contractor-conducted examinations and tests.-The contractor shall forward copies of the results of any of this examinations or tests to the design- ated address as required by the contract, t
17、he specification, or as requested by the Contracting Officer. (see 6.10) 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection.-Unless otherwise specified in the contract or purchase order, the supplier is responsible for the performance of all inspection requirements as specified herein
18、. Except as otherwise specified in the contract or order, the supplier may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set f
19、orth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. Reference shall be made to MIL-STD-109 to define terms used . herein. The provisions of MIL-A-2550 shall apply. 4.1.1 Submssion of product.-At the time the comple
20、ted lot of items deliverable under the contract is submitted to the Gaverment for acceptance, the contractor shall supply the following information accompanied by a certificate which attests that the information provided is correct and applicable to the product being submitted: assurance provisions
21、specified in this specification. a. A statement that the lot complies with ali the quality 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-C-50243 33 777770b 0325833 L MIL-C-50243 (KU) b, Drawing and specification number and date, together wit
22、h identification and date of changes thereto. C. A statement that all material purchased by the contractor meets requirements, when such material is controlled by Government or commercial specifications referenced in any of the contractual dacuments, and that certificates of conformance are on file
23、and available for review. d. Number of items in the lot. e. Date submitted. . The certificate shall be signed by a responsible agent of the certifying organization. The initial certificate submitted shall be substantiated by evidence of the agents authority to bind his principal. be required with su
24、bsequent certificates unless, during the course of the contract, this authority is vested in another agent of the certifying organization. Substantiation of the agents authority will not 4.2 First article inspection.-Not applicable. 4.3 Inspection provisions 4.3.1 Lot formation.-The term inspection
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC502431971CARTRIDGE40MMHEM383LOADINGASSEMBLINGANDPACKINGM383 40 MM 炮弹 金属 零件 主体 组件 装卸 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-441698.html