ARMY MIL-C-10049 A-1964 CANNON 76MM GUN M32《 M32型76MM的CANNON枪》.pdf
《ARMY MIL-C-10049 A-1964 CANNON 76MM GUN M32《 M32型76MM的CANNON枪》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-10049 A-1964 CANNON 76MM GUN M32《 M32型76MM的CANNON枪》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、flIL-C-LOOLI7A LO 9797706 0272788 i j Septeniber 1964- S UPFA5EDING 28 NOVZKER 1949 MILE10049 (GTd) . MILITARY SPECIFICATION CANNON, 76MM GnI: BI32 1. SCOPE 1.1 2. APPLICABLF: DOCUMENTS 2.1 The following documents of the issue in effect on date of invitation This specification covers one type of gun
2、 cannon. for bids or request for proposal form a part of the specification to the extent specified herein. SPECIFICATIONS Mili t q MIL-C-13931 - Cannons, Mortars, Recoilless Rifles and Guns, General Specification for NIGM-.+72 - Magnetic Particle Inspection Process for Ferromagnetic Material DRAWING
3、S U. S. Amy Weapons Command EPL 73092a - Engineering Parts List for Cannon, 76MM Gun: M32 PUBLICATIONS U. S. Am. Weapons Command ISQAP 73092W - List of Supplementam QualitrAssurance Rovisions for -. . Cannon, 76h Gun: M32- PDS p730924I. - Packaging Data Sheet for Cannon, 76m Gun: UDS 7309241 - List
4、of Packaging Data Sheets for Cannon, 76MM Gun: (Copies of specifications, standards, drawings and publications required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer.) M32 W2 I 4 Provided by IHS
5、Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-3. REQUIrnlENTs 3.1 Materiais and construction. Cannons and parts thereof shall conform to this specification, the drawings and specifications listed in EPL 7309W and MIL-(3-13931. 3.1.1 Bore and chamber surfaces. The
6、 bore and chamber surfaces.shaU be free from material defects such as cracks, laps, pipes, nonmetsllic inclusions, slag pockets and machining defects such as tool gouges, tears, bums, and chatter marks. 3.1.2 Recoil surface. The recoil surface of the tube shall be chrome plated in accordance with th
7、e requirements of MIM-33931 for chrome plating of the chamber and bore. 3.2 Breech mechanism. The breech mechanism shall operate without evidence of interference, erratic movement or malfunction. crank during counter-kecoil or manipulation of the operating-handle to open the breech shaU rotate the b
8、reechblock-crank rearward and downward thereby dropping the breechblock to open the breech. The extractors shail operate in unison to eject the empty case and shall latch the breechblock in the open position. breech operating mechanism shall return the breechblock to the.closed position when the ext
9、ractors are tripped or when the breech is closed manually. clockwise rotation of the adjustor shall increase the preload on the closing spring. 3.3 Firinn mechanism group. The cocking, percussion and trigger mechanisms shall function without binding, evidence of interference or erratic movement. Dur
10、ing descent of the breechblock, the cocking-lever forced by a camming surface on the breech-ring,shell engage the retractor which In tuni shall force the guide and firing-pin rearward, compressing the firing-spring and allowing the sear to iatch the guide and firing-pin in the cocked position. Rearu
11、ard movement of the trigger plunger shall pivot the trigger, allowing-the sear to rotate and release the percussion mechanism. The compressed firing-spring shall force the firing- pin to protrude beyond the face of the breechblock and thereby compress the retracta ing spring which SU then withdraw t
12、he firing pin behhd the front face of the breechblock. The firing pin protrusion, measured from the Carmning of the operating- The Counter- 3.3.1 Firinn f in motnision. front face of the breechblock, shall be not less than 8.10 nor more than 0.16 2 . - - . . .- - . - Provided by IHSNot for ResaleNo
13、reproduction or networking permitted without license from IHS-,-,-WIGC-10049A (WC) - 3.4 Proof testinq. 3.4.1 Fir& of production. 1 The first cannon and the firat repair tube manufactured under a contract ahall be subjected to the production engineering testa specified y the responsible commodity ar
14、senal and the firing testa specified in 4.3. 3.4.2 RenuLar P roduction. The cannons and repair tuba after the first of production shall be capable-of withstanding the proof firing teats specified in 4.3. fm cracka, fractures, tears, and other injurious defects as evidenced by visual examination and
15、magnetic particle or liquid penetrant testing. shall not exceed the -(mi,imUm) basic diameter specified on the applicable drawings by more than the amounts shown in Table I. 3.4.3 Matenal soundness. After the firing tests, Su pa2-t 8- be free 3.4.4 Bore enlar ement. Bore diameters across Lands after
16、 proof fihg Table I Allowable bore enlargement Distance forward of commencement of 2 cals. to rifling 0.1 Inch 1.0 Inch 1 cal. Muzzle Amount (Inch) O .O06 O .o06 o .o05 O .o04 NOTE: Interpolate to determine the allowable bore enlargement at distances other than the distances listed. 4. QUALIT ASSRAN
17、cE PRVISIONS 4.1 Responsibility for inspection. Unless otheruise Specified in the contract or purchase order, the supplier is responsible for the performance of ail inspection requirements as specified herein. the supplier mag utilize his own facilities or any conmercial laboratory acceptable to the
18、 Government. any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and senrices conform to prescribed requirements. 13931 except as otherwise modified or specified herein. Except as otherwise specified, The Government reserves the right
19、to perform 4.2 Inspection. Inspection shall be performed QI accordance with MIM- 4.2.1 AQL values. The acceptable quality levels are set forth in the SQAPS listed in ISQAP 73092w. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-10047A LO M 77
20、77706 0272773 - MIL-C-10049A (WC) 4.2.2 Recoil surfaces. 4.2.2.1 Before plating. Visually and dimensionally inspect the recoil 4.2.2.2 After plating. Visually and dimensionally inspect the recoil 4.2.3 Functioning of breech mechanism. Manually operate-all parts of the breech mechanism of each assemb
21、led cannon a minimum of two complete cycles. Any evidence of binding, scraping, rubbing, looseness or other malfunction of any component or failure to completely eject an empty case shall be cause for rejection. surface of each tube. :. surface after plating and the post-plating thermal treatment of
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC10049A1964CANNON76MMGUNM32M32 76 MM CANNON PDF

链接地址:http://www.mydoc123.com/p-441073.html