ARMY MIL-B-12673-1953 BRAZING OXYACETYLENE OF BUILT-UP METAL STRUCTURES《金属结构建造氧乙炔钎焊》.pdf
《ARMY MIL-B-12673-1953 BRAZING OXYACETYLENE OF BUILT-UP METAL STRUCTURES《金属结构建造氧乙炔钎焊》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-B-12673-1953 BRAZING OXYACETYLENE OF BUILT-UP METAL STRUCTURES《金属结构建造氧乙炔钎焊》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、MILITARY SPECIFICATION 57-208-1 I 23 November 1949 L 3 BRAZING, OXYACETYLEff E: OF BU I LT-UP METAL STRUCTURES 1. SCOPE 1.1 This specification applies to the oxyacetylene brazing of built-up mtai structures fabricated either fron ferrous or nonferrous base netal or conbina tion thereof as accomplish
2、ed by the use of suitably qualified flu WU filler meta. 2. 2.1 The following specifications and standards, of the issue in effect on APPLICABLE SPECIFICATIONS, STANDARDS, DRAWINGS AND CEHEXl PUBLICATIONS the date of invitation for bids, form a part of this specification. SPECIFICATIONS QQ-M-151, Met
3、als; General Specification for Inspection of MILITARY JM-STD-19 - Welding; Symbols MIL-STD-20, Welhing; Tem and Definitions (Copies or specifications and standards required by contractors in connection with specific procurement functions should be ob- tained from the procuring agency or as directed
4、by the contrac- ting officer. should be stipulated when regues tlng copies. ) Both the title and identifying number or symbol r r -. !C . I Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIGB-1267.i ORD ) 3. REQUIREMENTS 3.1 Contractor Is recordedi
5、mocediuie for brazinp joint. (See 6.3 and APP. Ad 3.1.1 General rttch o$ the structure show- ing the location of each joint to be brazed, and shall establish the brazing procedure required to cover di brazing to be performed under this specification. 3.1.2 Form and contents.- Zach contractors record
6、ed brazing proce- dure shall contain a reference to the location o$ the joint as shown in the drawing, a detailehross-section sketch of the joint, the factors listed in table I for the type of brazing being performed, and. shell be in accordance with a form appoved by the chief of the supply service
7、 involved. 3.1.3 Review.- Before starting qualification of procedures and bra- Zers for the brazing of joints under this specification, recorded brazing procedures and drawings (see 3.1.1 and 3.1.2) shall be submitted in dupli- cate for review though the contracting officer to the chief of the suppl
8、y service involved. 3.2 Procedure cwalification.U brazing performed on structures shall be in accordance with the brazing procedure which has been quali- fied by the contractor as specified in 4.2. made in any factor included in the qualified brazing procedure, the pro- cedure shaU be requalified as
9、 indicated in table I. When a major change has been 3.3 Brazer qua1ikication.- nly brazers qualified by the contrac- tor in accordance with the requirements of 4.2.2 of this specification shall be permitted to braze on structures being fabricated under this spec- ification. Then a major change has b
10、een mad0 in any factor included in the qualification brazing procedure, the brazer shall be requalified as indi- cated in table I. I 3.4 R-ocedure control.- 3.4.1 Gas ress su re.- Each gas line serving each torch shall be SO fitted with a direct-reading pressure gage that the pressure on each line m
11、y be determined at any time. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-E-12673 TH 77777b 0453575 3 TABLE I FOR ,REQUALIFICATION I Procedure Factor When Factor is Changed, Brazing Procedure to be Revised and Requalif ied a8 Indicated -_-_-
12、4-c- 1. composition of Yes: For change of basic base netal, type of base metal, i.e. Ferrous to Nonferrous of Vice Versa 2. Thickness of Yes: For change outside base metaJ., 3. ype of joint pes: For any change in (including dinensions joint type. and tolerances there- 4.Filler metal Yes: For change
13、of class the range of thickness for which qualified of *) - (class or type) I or type. 5. Filler-metal I Yes: For change of form - fom (wire, rod, strip, granuar) . b. Flux (brand or Yes: For change of brand trie) or type or for addition 1 or elimination of use of flux 7. Holding fixtures, I Yes: Fo
14、r any change in the type of fixtures used to hold parts in place during brazing operation which pro- duces a difference in cl8nq)- ing either in direction or I force applied. 8. Size of torch tip. i Yes: For channe in tiD (Torch style, model No. or mfr.) size exceeding one siLe 1 a8 manufactured by
15、the I same manufacturer. 9. Nunber offlame tips Yes: For changes in the I number of tips being used I from that qualified. I Yes: With each tip size 10. Gas pressure qualified, when the pressure used varies .more than plus or minus i$ from the average used for each I diameter qualified. I Yes: For a
16、ny chme of 11; Typ e of Flane I - (neutral, oxidizing flame type. or reducing). 12. Method of cleaning joint surfaces. Yes: When nethod is changed from that used when qualified Wnen Factor is Changed, Brazer to be Requali- fied as Indicated - - - - - Yes: For change requir- ing procedure requali- f
17、ication. NO Yes: For change requiring procedure sequalif ication, Yes: For change of type. NO. NO NO NO mo. Yes: For any change requiring procedure requalif ication. NO Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.5 Dlmensions,-!Phe contractor s
18、hall furnish structures which will finish 3.6 Base-metal preparation.-AU. metal surfaces that are to be brazed shall to the dime nsions shownin the drawings within the tolerances shown thereon without further straightening. be smooth and free from grease, oil, dirt, or any other material which might
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILB126731953BRAZINGOXYACETYLENEOFBUILTUPMETALSTRUCTURES 金属结构 建造 乙炔 钎焊 PDF

链接地址:http://www.mydoc123.com/p-440786.html