AIAA S-102.2.18-2009 Performance-Based Fault Tree Analysis Requirements《基于性能的故障树分析要求》.pdf
《AIAA S-102.2.18-2009 Performance-Based Fault Tree Analysis Requirements《基于性能的故障树分析要求》.pdf》由会员分享,可在线阅读,更多相关《AIAA S-102.2.18-2009 Performance-Based Fault Tree Analysis Requirements《基于性能的故障树分析要求》.pdf(36页珍藏版)》请在麦多课文档分享上搜索。
1、 Standard ANSI/AIAA S-102.2.18-2009 Performance-Based Fault Tree Analysis Requirements AIAA standards are copyrighted by the American Institute of Aeronautics and Astronautics (AIAA), 1801 Alexander Bell Drive, Reston, VA 20191-4344 USA. All rights reserved. AIAA grants you a license as follows: The
2、 right to download an electronic file of this AIAA standard for storage on one computer for purposes of viewing, and/or printing one copy of the AIAA standard for individual use. Neither the electronic file nor the hard copy print may be reproduced in any way. In addition, the electronic file may no
3、t be distributed elsewhere over computer networks or otherwise. The hard copy print may only be distributed to other employees for their internal use within your organization. ANSI/AIAA S-102.2.18-2009 American National Standard Performance-Based Fault Tree Analysis Requirements Sponsored by America
4、n Institute of Aeronautics and Astronautics Approved 17 November 2008 American National Standards Institute Abstract This standard provides the basis for developing the performance-based fault tree analysis (FTA) to review and analytically examine a system or equipment in such a way as to emphasize
5、the lower-level fault occurrences that directly or indirectly contribute to the system-level fault or undesired event. The requirements for contractors, planning and reporting needs, and analytical tools are established. The linkage of this standard to the other standards in the new family of perfor
6、mance-based reliability and maintainability (R limit of fault tree resolution capability level measure of the ability of an R b) the FTA requirements as needed to support the project, including milestones for developing the fault trees or modifying existing fault trees; b) scope, level of resolution
7、, and ground rules of the FTA; c) detailed procedures for selecting the set of system-level faults of concern; d) detailed procedures for establishing the component-level to which each system-level fault is examined; e) detailed FTA process flow diagrams and samples of fault trees; f) detailed proce
8、dures for constructing the fault tree, such as the approach for determining the immediate causes for each fault at progressively lower levels until a component-level fault is reached; g) detailed procedures for documenting and reporting the FTA data/results in a timely manner; and h) definitions of
9、FTA data attributes, i.e., data characteristics and format, that accommodate the needs of other project functions, including those of the FMECA, event tree analysis (ETA), system reliability modeling, system safety, maintainability, and risk management. The minimum tasks that shall be prescribed in
10、the FTA plan shall be based on the required capability level, as defined in Annex B. The description of the specified capability level shall include, at a minimum, all activities described for that capability level and all lower capability levels in this standard. The contractor shall consider the a
11、pplicability of capability level growth over the life cycle of a project when planning the FTA process. ANSI/AIAA S-102.2.18-2009 7 4.3 FTA Report The contractor shall document the results of the FTA in a timely manner and shall provide the most current version of the documentation to the acquisitio
12、n activity upon request. The FTA report shall include a complete FT dataset for each top event and sufficient information to allow independent verification of the analysis results within the ground rules established for the project. The FTA shall be kept updated at all times with an appropriate revi
13、sion number assigned. 5 Detailed Requirements The following detailed requirements pertain to the performance-based FTA tasks defined in Annex B. 5.1 System Design Data Collection Prior to beginning the evaluation of the undesired event causes, the contractor shall collect sufficient system design in
14、formation to identify all possible functional and physical dependencies in the system, within analytical ground rules to be specified by the contractor. The system design information shall include all system levels, mission phases, and environments, and all normal, degraded, and contingency system m
15、odes that are applicable to each mission phase. If a Capability Level 3 or higher FTA is required, this information shall be entered into the FTA database to allow cross-referencing of identified failure causes against official design drawings. 5.2 FTA Procedures The contractor shall perform the FTA
16、 in an orderly fashion with the following steps incorporated as appropriate: Define the objective of the FTA. Identify the top event of the fault tree (FT). Define the scope of the analysis. Define the FTA resolution (the failure causes level of detail). Define the ground rules for the FTA. Construc
17、t the FT. Evaluate the FT qualitatively. If a Capability Level 3 FTA is required, evaluate the FT quantitatively. Interpret and present the results. 5.2.1 Define Objectives of the FTA The contractor shall define the objective of the FTA in terms of functionality of the system to be analyzed, definit
18、ions of system or mission failure, highest number of events in a cut set, precision of probability estimates, etc. 5.2.2 Identify Top Event of the FT The contractor shall identify the top event for which the failure causes will be analyzed and resolved. 5.2.3 Define Scope of the Analysis The contrac
19、tor shall define the FTA scope in terms of 1) which particular system design version and mission time period(s) will be analyzed; and 2) which of the system failure events and contributors will be included and which will not be included. ANSI/AIAA S-102.2.18-2009 8 5.2.4 Define FTA Resolution The co
20、ntractor shall typically resolve each failure event, i.e., the top event, to the major components in the system. If quantification is required, the FT shall be developed to a level of detail where the best failure probability data are available. 5.2.5 Define FTA Ground Rules The contractor shall def
21、ine the FTA ground rules that include: 1) selecting the FT data sources and data processing methods4; 2) describing how consistency will be achieved among independently constructed FT; 3) defining the procedures and nomenclature by which events and gates are named in the FT; and 4) describing how ex
22、ternal system interfaces and influences, e.g., human errors, operating environments, etc. are going to be modeled. 4This is a process-validation activity when it includes evaluation of the appropriateness of the FTA process prior to its use. ANSI/AIAA S-102.2.18-2009 9 5.2.6 Construct FT The contrac
23、tor shall construct the FT based on the system element relationships and functional logic derived from the system schematics and functional descriptions. The symbols that are used in the FT shall represent the relationships between events. The contractor shall choose from the typical logical symbols
24、 used as the building blocks to construct the FT, e.g.: If a Capability Level 2 FTA is required, the fault tree shall include human error modes. If a Capability Level 3 FTA is required, the fault tree shall include software components, functional loops/feedback, phase and time dependent failure, and
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AIAAS1022182009PERFORMANCEBASEDFAULTTREEANALYSISREQUIREMENTS 基于 性能 故障 分析 要求 PDF

链接地址:http://www.mydoc123.com/p-426716.html