ABS 6-2017 RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2017.pdf
《ABS 6-2017 RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2017.pdf》由会员分享,可在线阅读,更多相关《ABS 6-2017 RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2017.pdf(708页珍藏版)》请在麦多课文档分享上搜索。
1、 Notices and General Information RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2017 NOTICES AND GENERAL INFORMATION American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 2016 American Bureau of Shipping. All rights reserved. ABS Plaza 16855 Nor
2、thchase Drive Houston, TX 77060 USA Table of Contents part Notices and General Information CONTENTS Introduction . 1 TABLE 1 Applicable Editions of Booklets Comprising 2017 Rules 2 TABLE 2 Division and Numbering of Rules 2 Rule Change Notice (2017) . 3 TABLE 3 Summary of Changes from the 2016 Rules
3、3 ii ABSRULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS .2017 Notices and General Information Introduction 1. The year 2017 edition of the Rules for Building and Classing Mobile Offshore Drilling Units consists of the nine (9) booklets as shown in Table 1. The purpose of the generic t
4、itle ABS Rules for Conditions of Classification Offshore Units and Structures (Part 1) is to reflect the expanded contents of PART 1, as a result of including consolidated requirements for “Classification” applicable to all types of offshore units, pipelines, risers, and other offshore structures, a
5、s specified in the Foreword to Part 1. With regard to Part 2, the purpose of the generic title ABS Rules for Materials and Welding is to emphasize the common applicability of the requirements to ABS-classed vessels, other marine structures and their associated machinery, and thereby make PART 2 more
6、 readily a common “PART” of various ABS Rules and Guides, as appropriate. 2. The numbering system applied in the Rules is shown in Table 2. 3. The primary changes from the 2016 edition of the Rules are identified and listed in Table 3. The effective date of the indicated Rule Changes is 1 January 20
7、17, unless specifically indicated otherwise. 4. The effective date of each technical change since 1993 is shown in parenthesis at the end of the subsection/paragraph titles within the text of each Part. Unless a particular date and month are shown, the years in parentheses refer to the following eff
8、ective dates: (2000) and after 1 January 2000 (and subsequent years) (1996) 9 May 1996 (1999) 12 May 1999 (1995) 15 May 1995 (1998) 13 May 1998 (1994) 9 May 1994 (1997) 19 May 1997 (1993) 11 May 1993 For certain changes that have a major impact on shipyards, designers and vendors, ABS has instituted
9、 a two-year Rule cycle to give the industry more time to prepare for these changes. The text of these changes will appear in a box along with the effective date just under the existing Rule requirement. 5. Until the next edition of the Rules for Building and Classing Mobile Offshore Drilling Units i
10、s published, Rule Change Notices and/or Corrigenda, as necessary, will be published on the ABS website www. eagle.org only, and will be available free for downloading. It is not intended to publish hard copies of future Rule Change Notices and/or Corrigenda to existing Rules or Guides. The consolida
11、ted edition of the Rules for Building and Classing Mobile Offshore Drilling Units, which includes Rule Change Notices and/or Corrigenda using different colors for easy recognition will be published on the ABS website only when RCN and/or Corrigenda are issued. 6. The listing of CLASSIFICATION SYMBOL
12、S AND NOTATIONS is available from the ABS website www.eagle.org for download. ABSRULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS .2017 1 Notices and General Information TABLE 1 Applicable Editions of Booklets Comprising 2017 Rules Notices and General Information 2017 Part 1: Rules for
13、 Conditions of Classification Offshore Units and Structures (1)2017 (2)Part 1: Conditions of Classification (Supplement to the ABS Rules for Conditions of Classification Offshore Units and Structures) (1)2017 Part 2: Rules for Materials and Welding 2017 (2)Part 3: Hull Construction and Equipment 201
14、7 Part 4: Machinery and Systems 2017 Part 5: Fire and Safety Measures and Features 2017 Part 6: Rules for Equipment and Machinery Certification 2017 Part 7: Surveys 2017 Notes: 1 The requirements for conditions of classification are contained in the separate, generic ABS Rules for Conditions of Clas
15、sification Offshore Units and Structures (Part 1). Additional specific requirements are contained in Part 1 of these Rules. 2 The latest edition of these Rules is to be referred to. These Rules may be downloaded from the ABS website at www.eagle.org, Rules and Guides, Downloads or may be ordered sep
16、arately from the ABS Publications online catalog at www.eagle.org, Rules and Guides, Catalog. TABLE 2 Division and Numbering of Rules Division Number Part Part 1 Chapter Part 1, Chapter 1 Section Section 1-1-1 Subsection (see Note 1) 1-1-1/1 Paragraph (see Note 1) 1-1-1/1.1 Subparagraph 1-1-1/1.1.1
17、Item 1-1-1/1.1.1(a) Subitem 1-1-1/1.1.1(a)i) Appendix Appendix 1-1-A1 or Appendix 1-A1-1 Note: 1 An odd number (1, 3, 5, etc.) numbering system is used for the Rules. The purpose is to permit future insertions of even-numbered paragraphs (2, 4, 6, etc.) of text and to avoid the necessity of having t
18、o renumber the existing text and associated cross-references, as applicable, within the Rules and associated process instructions, check sheets, etc. 2 ABSRULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS .2017 Notices and General Information Rule Change Notice (2017) TABLE 3 Summary of
19、 Changes from the 2016 Rules EFFECTIVE DATE 1 July 2016 shown as (1 July 2016) Part/Para. No. Title/Subject Status/Remarks PART 1 Rules for Conditions of Classification Offshore Units and Structures 1-1-A2/5.5 Product Quality Assurance Certification (PQA) Tier 4 (IACS UR Z26 Alternative Certificatio
20、n Scheme) To incorporate IACS UR Z26, which replaces UR M5 refrigerating, stabilizing, ventilation and air conditioning machinery; and trunk to such spaces, provided they are not handling or using flammable liquids) are not considered to be high fire risk areas. (Incorporates Notice No. 1) ABSRULES
21、FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS .2017 3 Notices and General Information Part/Para. No. Title/Subject Status/Remarks 4-3-5/1.1.3(d) Creepage Distances To align the requirements with the updated IACS UR E11, which aligns with IEC 60502-1 (2009) and IEC 60502-2 (2005) with resp
22、ect to testing. (Incorporates Notice No. 1) 4-3-5/1.1.3(e) (Renumbered) Creepage Distances To align the requirements with the updated IACS UR E11, which aligns with IEC 60502-1 (2009) and IEC 60502-2 (2005) with respect to testing. (Incorporates Notice No. 1) 4-3-5/1.1.3(f) (Deleted) Non-standardize
23、d Parts To align the requirements with the updated IACS UR E11, which aligns with IEC 60502-1 (2009) and IEC 60502-2 (2005) with respect to testing. (Incorporates Notice No. 1) 4-3-5/1.9.2(b) Warning Plate To align the requirements with the updated IACS UR E11, which aligns with IEC 60502-1 (2009) a
24、nd IEC 60502-2 (2005) with respect to testing. (Incorporates Notice No. 1) 4-3-5/1.9.3(h) Test after Installation To align the requirements with the updated IACS UR E11, which aligns with IEC 60502-1 (2009) and IEC 60502-2 (2005) with respect to testing. (Incorporates Notice No. 1) 4-3-5/1.13.4 Acce
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ABS62017RULESFORBUILDINGANDCLASSINGMOBILEOFFSHOREDRILLINGUNITS2017PDF

链接地址:http://www.mydoc123.com/p-400915.html