ABS 6 NOTICE 1-2017 RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2017.pdf
《ABS 6 NOTICE 1-2017 RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2017.pdf》由会员分享,可在线阅读,更多相关《ABS 6 NOTICE 1-2017 RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2017.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、 RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2017 NOTICE NO. 1 JULY 2017 The following Rule Changes were approved by the ABS Rules Committee on 30 May 2017 and become EFFECTIVE AS OF 1 JULY 2017. (See http:/www.eagle.org for the consolidated version of the Rules for Building and C
2、lassing Mobile Offshore Drilling Units 2017, with all Notices and Corrigenda incorporated.) Notes - The date in the parentheses means the date that the Rule becomes effective for new construction based on the contract date for construction. (See 1-1-4/3.3 of the ABS Rules for Conditions of Classific
3、ation Offshore Units and Structures (Part 1).) PART 3 HULL CONSTRUCTION AND EQUIPMENT CHAPTER 2 HULL STRUCTURES AND ARRANGEMENTS SECTION 1 STRUCTURAL ANALYSIS 1 Structural Analysis (Add new first paragraph in Subsection 3-2-1/1, as follows:) (1 July 2017) The structural design criteria specified in
4、this Chapter is presented in the Working Stress Design (WSD) format, also known as the Allowable Stress (or Strength) Design (ASD) format. Alternative structural design criteria for self-elevating drilling units and column-stabilized drilling units in a Load and Resistance Factor Design (LRFD) forma
5、t are provided in the ABS Guide for Load and Resistance Factor Design (LRFD) Criteria for Offshore Structures. In general, WSD and LRFD criteria are not to be mixed within the analysis. PART 4 MACHINERY AND SYSTEMS CHAPTER 2 PUMPS AND PIPING SYSTEMS SECTION 1 GENERAL 11 General Installation Details
6、11.29 Flexible Hoses (1 July 2017) Flexible hoses are to comply with the requirements of 4-6-2/5.7 of the Steel Vessel Rules. Hose connections utilized in cooling systems for engines with cylinder bores equal to or less than 300 mm (12 in.) will be subject to special consideration. ABSRULES FOR BUIL
7、DING AND CLASSING MOBILE OFFSHORE DRILLING UNITS .2017 1 Notice No. 1 July 2017 PART 4 MACHINERY AND SYSTEMS CHAPTER 3 ELECTRICAL INSTALLATIONS SECTION 2 ELECTRICAL SYSTEMS 7 Distribution System (Revise Paragraph 4-3-2/7.9, as follows:) 7.9 Harmonics (1 July 2017) The total harmonic distortion (THD)
8、 in the voltage waveform in the distribution systems is not to exceed 8% and any single order harmonics not to exceed 5%. Other higher values may be accepted provided the distribution equipment and consumers are designed to operate at the higher limits. This relaxation on THD limits is to be documen
9、ted (harmonic distortion calculation report) and made available on board as a reference for the Surveyor at each periodical survey. Where higher values of harmonic distortion are expected, any other possible effects, such as additional heat losses in machines, network resonances, errors in control a
10、nd monitoring systems are to be considered. See also 4-3-2/9.18 and 4-3-2/9.19. 9 Circuit Protection System (Add new Paragraph 4-3-2/9.18, as follows:) 9.18 Harmonic Distortion for Unit Electrical Distribution System including Harmonic Filters (1 July 2017) 9.18.1 Monitoring Where the electrical dis
11、tribution system on board a unit includes harmonic filters, such units are to be fitted with facilities to continuously monitor the levels of harmonic distortion experienced on the main bus bar as well as alert the crew should the level of harmonic distortion exceed the acceptable limits. Where the
12、engine room is provided with automation systems, this reading is to be logged electronically, otherwise it is to be recorded in the engine log book for future inspection by the Surveyor. However, harmonic filters installed for single application frequency drives such as pump motors may be excluded f
13、rom the requirements of this section. 9.18.2 Measurement As a minimum, harmonic distortion levels of main bus bar on board such existing ships are to be measured annually under seagoing conditions as close to the periodical machinery survey as possible so as to give a clear representation of the con
14、dition of the entire plant to the Surveyor. Harmonic distortion readings are to be carried out when the greatest amount of distortion is indicated by the measuring equipment. An entry showing which equipment was running and/or filters in service is to be recorded in the log so this can be replicated
15、 for the next periodical survey. Harmonic distortion levels are also to be measured following any modification to the ships electrical distribution system or associated consumers by suitably trained ships personnel or from a qualified outside source. Records of all the above measurements are to be m
16、ade available to the surveyor at each periodical survey in accordance with Part 7 of the Rules. 9.18.3 Validation of Calculated Harmonic Where the electrical distribution system on board a unit includes harmonic filters, the system integrator of the distribution system is to show, by calculation, th
17、e effect of a failure of a harmonic filter on the level of harmonic distortion experienced. The system integrator of the distribution system is to provide the unit owner with guidance documenting permitted modes of operation of the electrical distribution system while maintaining harmonic distortion
18、 levels within acceptable limits during normal operation as well as following the failure of any combination of harmonic filters. 2 ABSRULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS .2017 Notice No. 1 July 2017 The calculation results and validity of the guidance provided are to be v
19、erified by the Surveyor during sea trials. 9.18.4 Filter Protection Alarm Arrangements are to be provided to alert the crew in the event of activation of the protection of a harmonic filter circuit. A harmonic filter is to be arranged as a three-phase unit with individual protection of each phase. T
20、he activation of the protection arrangement in a single phase is to result in automatic disconnection of the complete filter. Additionally, there is to be installed a current unbalance detection system independent of the overcurrent protection alerting the crew in case of current unbalance. Consider
21、ation is to be given to additional protection for the individual capacitor element as (e.g., relief valve or overpressure disconnector) in order to protect against damage from rupturing. This consideration is to take into account the type of capacitors used. (Revise first paragraph of Paragraph 4-3-
22、2/9.19, as follows:) 9.19 Protection of Harmonic Filter Circuits (1 July 2017) Notwithstanding the requirements of 4-3-2/9.18 above, harmonic filters circuits shall be protected against overload and short-circuit. An alarm is to be initiated in a continuously manned location in the event of an activ
23、ation of overload or short-circuit protection. (Following text remains unchanged.) PART 4 MACHINERY AND SYSTEMS CHAPTER 3 ELECTRICAL INSTALLATIONS SECTION 3 ONBOARD INSTALLATION 7 Cables and Wires 7.1 Cable Construction (Revise Subparagraph 4-3-3/7.1.1, as follows:) 7.1.1 General (1 July 2017) Elect
24、ric cables are to have conductors, insulation and moisture-resistant jackets in accordance with IEC Publication 60092-350, 60092-352, 60092-353, 60092-354, 60092-360, 60092-370, 60092-376, IEEE Std-45. Other recognized marine standards of an equivalent or higher safety level, will also be considered
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ABS6NOTICE12017RULESFORBUILDINGANDCLASSINGMOBILEOFFSHOREDRILLINGUNITS2017PDF

链接地址:http://www.mydoc123.com/p-400913.html