1、PMP 资格认证考试-项目整合管理(一)及答案解析(总分:-20.00,做题时间:90 分钟)一、单项选择题(总题数:20,分数:-20.00)1.Which of the followings is far from Integrated Change Control?A) Influencing the factors that create change to ensure that changes are agreed upon.B) Determining that a change has occurred.C) Ensuring the integrated performanc
2、e baseline doesnt change.D) Managing the actual changes when and as they occur.(分数:-1.00)A.B.C.D.2.While the project is being completed, management requests a change. What isthe FIRST thing the project manager should do?A) Comply with the request if possible.B) Obtain a complete understanding of the
3、 scope of the change.C) Teel the customer that a change will be coming.D) Ask the team to accept the change.(分数:-1.00)A.B.C.D.3.You are a project manager who was just assigned to take over a project from another project manager who is leaving the company. The old project manager tells you that the p
4、roject is on schedule only because he has had to constantly push the team to perform. What is the FIRST thing you should do as the new project manager?A) Check risk status.B) Check cost performance.C) Determine a management strategy.D) Tell the team your objectives.(分数:-1.00)A.B.C.D.4.All of the fol
5、lowing is true for a project baseline EXCEPT _.A) it is the original approved planB) it includes approved scope changesC) it is useful in detecting project variancesD) it is useful in preparing the WBS(分数:-1.00)A.B.C.D.5.When should a project baseline be changed?A) When a major delay occurs.B) When
6、an official change is made.C) When a cost increase occurs.D) Changes should never be made in the baseline.(分数:-1.00)A.B.C.D.6.What is a project management information system?A) Computerized status tracking system.B) Manual status tracking system.C) Method to determine and archive how the project is
7、doing.D) Method to gather, integrate, and disseminate what and how the project is doing.(分数:-1.00)A.B.C.D.7.The project is not going well and many changes are being made. Which of the following should you do FIRST to gain control of the project?A) Review the scope of work with the stakeholders.B) Cr
8、eate a new change form.C) Remind everyone of the change procedures.D) Ask management for help.(分数:-1.00)A.B.C.D.8.All of the following are part of an effective change control system EXCEPTA) proceduresB) standards for reportsC) meetingsD) lessons learned(分数:-1.00)A.B.C.D.9.Your companys project revi
9、ew committee (PRC) meets quarterly to review any project with a budget exceeding $2 million. You recently were promoted to senior project manager and were assigned one of these largest projects, the development of a next-generation, computer-aided manufacturing process. The PRC asked you to present
10、the projects objectives, work content, and deliverables at its next meeting. Accordingly, you need to prepare which one of the following documents?A) project charter.B) product description.C) scope statement.D) WBS.(分数:-1.00)A.B.C.D.10.Close procurements is a process that involvesA) customer satisfa
11、ction analysis and final paymentB) administrative closure and archiving recordsC) final contractor payment and lessons learnedD) product verification and administrative closure(分数:-1.00)A.B.C.D.11.Your project has a number of different work results. You are collecting information about these work re
12、sults such as what costs have been incurred or committed and which deliverables have been completed and which remain outstanding. You will use this information in which of the following processes?A) Direct and manage project execution.B) Perform integrated change control.C) Reprot performance.D) Ver
13、ify scope.(分数:-1.00)A.B.C.D.12.The competitive, complex project management environment has increased pressure for on-line performance Schedule control is one important way of avoiding schedule delay. Time management corrective action often involves expediting certain activities to ensure that they a
14、re completed in a timely manner or to ensure that they are completed with the least possible.delay. To plan and execute schedule recovery, corrective action frequently requires _.A) making unpopular decisionB) immediately re-baselineC) root cause analysisD) resource leveling(分数:-1.00)A.B.C.D.13.An i
15、mportant task of project managers is to identify the relevant goals of each project. An approach that can help managers set up and achieve those goals is management by objectives (MBO). MBO specifically addresses all the following EXCEPT _.A) establishing unambiguous and realistic objectivesB) perio
16、dically evaluating whether project objectives have been achievedC) promoting participation, team building, and commitment to the projectD) analyzing and reducing risk and determining how to handle it when it occurs(分数:-1.00)A.B.C.D.14.Close procurements is similar to close project in that they both
17、involve:A) Product verification.B) Kick off meetings.C) Quality assurance activities.D) Creation of the scope verification plan.(分数:-1.00)A.B.C.D.15.At the end of each project, the project team should prepare a lessons learned summary that focuses on all the following EXCEPTA) sharing best practices
18、 with other project teams in the organizationB) warning others of potential problemsC) suggesting methods to mitigate risks effectively to ensure successD) sharing only positive aspects of the project for future replication elsewhere in the organization(分数:-1.00)A.B.C.D.16.Administrative closure sho
19、uld not be delayed until project completion becauseA) useful information may be lostB) the project manager may be reassignedC) project team members may be reassigned by that timeD) sellers are anxious for payments(分数:-1.00)A.B.C.D.17.In which project life cycle phase are the risks associated with pr
20、oject integration usually the smallest?A) Project initiation and approval.B) Project planning.C) Project execution.D) Project closeout.(分数:-1.00)A.B.C.D.18.Which two process groups provide potentially cyclical inputs to each other?A) Executing processes and controlling processes.B) Planning processe
21、s and executing processes.C) Planning processes and controlling processes.D) Controlling processes and closing processes.(分数:-1.00)A.B.C.D.19.A project planning methodology is any structured approach used to guide the project team during development of the project plan. What is an example of this me
22、thodology?A) Standard forms or templates.B) Upper management involvement.C) Functional work authorizations.D) Stakeholders skills.(分数:-1.00)A.B.C.D.20.The close project or phase process is essential to overall project planning. What is considered one of the most important steps in closing project or
23、 phase?A) Insuring that plans are produced to implement the project by phases.B) Issuing work orders so that financial data can be collected.C) Transition the lease of equipment to the owner.D) Satisfying the contractual obligations.(分数:-1.00)A.B.C.D.PMP 资格认证考试-项目整合管理(一)答案解析(总分:-20.00,做题时间:90 分钟)一、单
24、项选择题(总题数:20,分数:-20.00)1.Which of the followings is far from Integrated Change Control?A) Influencing the factors that create change to ensure that changes are agreed upon.B) Determining that a change has occurred.C) Ensuring the integrated performance baseline doesnt change.D) Managing the actual ch
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 计算机 职业资格 PMP 资格 认证 考试 项目 整合 管理 答案 解析 DOC