1、05-11 23 52 33 - 1 SECTION 23 52 33 WATER-TUBE BOILERS SPEC WRITER NOTES: 1. Delete between / - / if not applicable to project. Also delete any other item or paragraph not applicable in the Section. Deleted paragraphs should be labeled as “Omitted”. 2. References to pressure in this section are gage
2、 pressure unless otherwise noted. 3. Two types of water tube boilers are specified, flex tube and D-type. 4. Flex tube boilers: 1) Primarily for non-critical service firing gas fuel and with stable steam demands. Expected life is 15 20 years. 2) In addition to natural gas, only No.2 fuel oil should
3、be fired and in limited quantity because of the difficulty of cleaning soot from the tubes. 3) Because of the relatively small diameter of the steam drum, steam quality may be unsatisfactory and carryover may occur if there are rapid and substantial fluctuations in steam demands. Three-element water
4、 level control is advisable. 4) Mechanical cleaning of the tube interiors is not possible. Chemical cleaning is necessary. 5) Acceptable manufacturers are Bryan and Unilux. Maximum boiler horsepower of Bryan boilers is 527. Unilux has larger boilers. 5. D-type two pass water tube boilers: 1) D-type
5、boilers are recommended for critical industrial and institutional service where longevity and reliability are essential. Expected life is 40 years. 2) Various fuels, including heavy oil, can be burned satisfactorily. 3) Applications are typically for steam loads approximately 25,000 lb/hr and above.
6、 This type is available for lower loads, but it is much more expensive and less efficient than the fire tube type which should be utilized for the lower steam demands. 4) The pressure vessel interior and furnace are relatively easy to inspect. Tubes can be cleaned mechanically. Provided by IHSNot fo
7、r ResaleNo reproduction or networking permitted without license from IHS-,-,-05-11 23 52 33 - 2 6. Contract drawings must include (as applicable) the VA National CAD Standards listed below: SD235233-01 Water Tube Boiler SD235233-02 Access Platform Arrangement For Water Tube Boiler SD232111-07 Boiler
8、 Feedwater Pumps Flow Diagram SD232111-08 Boiler Flow Diagram PART 1 - GENERAL 1.1 DESCRIPTION: This section specifies packaged water tube boiler with trim (accessories), dual fuel (natural gas and fuel oil) burner, fuel trains /, and flue gas economizer/. 1.2 RELATED WORK: A. Section 09 91 00, PAIN
9、TING. /B. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS./ C. Section 23 05 11, COMMON WORK RESULTS FOR HVAC and STEAM GENERATION. D. Section 23 05 51, NOISE and VIBRATION CONTROL FOR BOILER PLANT. E. Section 23 21 11, BOILER PLANT PIPING SYSTEMS: Valves for boiler tr
10、im, non-return stop-check valve, piping for fuel and feedwater trains. F. Section 23 51 00, BREECHINGS, CHIMNEYS, and STACKS: Boiler outlet damper systems, breechings, stacks, flue gas recirculation (FGR) ductwork. G. Section 23 09 11, INSTRUMENTATION and CONTROL FOR BOILER PLANT: Burner controls, c
11、ombustion control system, boiler water level control, pressure gages, thermometers. H. Section 23 08 11, DEMONSTRATIONS and TESTS FOR BOILER PLANT. I. Section 23 08 00 COMMISSIONING OF HVAC SYSTEMS: Requirements for commissioning, systems readiness checklists, and training. 1.3 QUALITY ASSURANCE: A.
12、 Coordinate all new and existing equipment and conditions. This includes, but is not limited to: boiler, boiler trim, burner, fuel trains, gas pressure regulators and available gas pressure, fuel oil header back pressure regulator on house oil pump set and available fuel oil pressure, burner control
13、 system, combustion control system, economizer (if provided), breeching and stacks. B. Provide written certification that the entire assembly has been coordinated to achieve the required performance and to provide the required features. C. The model and size of the proposed burner shall have been pr
14、eviously applied to at least three boilers that are similar in size, proportion, Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-05-11 23 52 33 - 3 and arrangement to the proposed boiler. In each of the three installations, burner performance shall h
15、ave conformed to requirements listed in Part 2, BURNER and FUEL TRAINS. Provide list of these installations, and name, address and telephone number of person familiar with each project who will serve as a reference source. D. Regardless of fuel input rating, the equipment, installation and operation
16、 shall conform to NFPA 85. Where conflicts exist between NFPA 85 and this specification, this specification will govern. 1.4 SUBMITTALS: A. Before executing any work, submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES. B. Boiler: 1. Complete catalog information and
17、outline drawing of boiler and accessories with dimensions. 2. Arrangement and description of construction of pressure parts, casings, drum internals, drum handhole covers and yokes, and support frame. 3. Drum piping connection sizes, locations, construction. 4. Technical data including temperature r
18、atings and arrangement of refractory and insulation. 5. Steam nozzle construction. Capability of steam nozzle and attachment to steam drum to withstand forces and moments imposed by connecting piping. Refer to table of forces and moments on the drawings. 6. Amount of heating surface, combustion volu
19、me. 7. Weight of boiler and burner assembly, empty and flooded. 8. Design pressures and temperatures. 9. Loading diagram of support frame. Evidence that boiler support requirements have been coordinated with foundation design. 10. Recommended anchorage of boiler support frame to foundation. 11. Furn
20、ace viewport construction, locations. 12. Dimensioned location of normal water line, lowest and highest permissible water level, set points of water level alarms and cutoffs. 13. Predicted surface temperature at front, rear and sides of boiler. SPEC WRITER NOTE: Delete the following subparagraph if
21、not required. 14. Seismic design data on boiler and anchorage of boiler to foundation. Refer to Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-05-11 23 52 33 - 4 C. Boil
22、er Trim: Includes bottom blowoff valves, water column with conductivity probe assembly, water level gage with illuminator, auxiliary low water cutoff, piping, all valves and fittings furnished by boiler manufacturer, feedwater control valve, safety valves, steam pressure gage, steam pressure switche
23、s. 1. Design, construction, arrangement on the boiler. 2. Pressure and temperature limitations. 3. ASTM numbers and schedule numbers of piping. 4. Type and pressure ratings of pipe fittings. 5. Flow and pressure drop data on feedwater control valve. 6. Scale ranges of gages, thermometers, and pressu
24、re switches. 7. Location of water level sensing and indicating devices in relation to normal water line of boiler and highest and lowest permissible water lines of boiler. 8. Set pressure and capacity of safety valves. D. Burner and Fuel Trains: 1. Catalog data and drawings showing construction of b
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA2352332011WATERTUBEBOILERSPDF