VA 23 52 25-2010 LOW-PRESSURE WATER HEATING BOILERS.pdf
《VA 23 52 25-2010 LOW-PRESSURE WATER HEATING BOILERS.pdf》由会员分享,可在线阅读,更多相关《VA 23 52 25-2010 LOW-PRESSURE WATER HEATING BOILERS.pdf(31页珍藏版)》请在麦多课文档分享上搜索。
1、05-10 23 52 25 - 1 SECTION 23 52 25 LOW-PRESSURE WATER HEATING BOILERS SPEC WRITER NOTES: 1. Delete between /-/ if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraph. Deleted paragraphs should be labeled “omitted”. 2. Reference
2、s to pressure are gage pressure unless otherwise noted. PART 1 GENERAL SPEC WRITER NOTES: Provide dual-fuel arrangement when natural gas is used as the prime fuel. The back-up fuel shall be either Propane Gas or No. 2 Oil, both stored at site. 1.1 DESCRIPTION: This section specifies packaged hot wat
3、er boilers with trim (accessories), /dual fuel/ natural gas and /No. 2 oil/propane/burner, fuel valve and piping trains and other accessories. 1.2 RELATED WORK: A. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS. B. Section 22 05 23, GENERAL-DUTY VALVES FOR PLUMBING PI
4、PING. C. Section 23 05 11, COMMON WORK RESULTS FOR HVAC and STEAM GENERATION. D. Section 23 05 41, NOISE and VIBRATION CONTROL FOR HVAC PIPING and EQUIPMENT. E. Section 23 07 11, HVAC, PLUMBING, and BOILER PLANT INSULATION. F. Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC. G. Section 23 1
5、0 00, FACILITY FUEL SYSTEMS. H. Section 23 11 23, FACILITY NATURAL GAS PIPING I. Section 23 21 13, HYDRONIC PIPING. J. Section 23 21 23, HYDRONIC PUMPS. K. Section 23 51 00, BREECHING, CHIMEYS and STACKS. L. Section 23 05 93, TESTING, ADJUSTING, and BALANCING. 1.3 QUALITY ASSURANCE: A. Coordinate wo
6、rk of this section with all /existing /equipment and conditions. This includes, but is not limited to: boiler, boiler trim, burner, fuel valve and piping trains, gas pressure regulators and available gas pressure, /required fuel oil train pressures,/control systems,/combustion air piping,/and ventin
7、g. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-05-10 23 52 25 - 2 B. Provide a list of at least 5 installations, similar in size and scope as the proposed boilers. Include the name, address, and telephone number of a person familiar with each pro
8、ject as a reference source. C. Boiler shall be pressure tested at the factory and bear the ASME stamp. 1.4 SUBMITTALS: A. Before executing any work, submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES. B. Boiler: 1. Complete catalog information and outline drawings o
9、f boiler, burner, and accessories with dimensions including required service clearances and access space. 2. Catalog cuts showing arrangement and construction of pressure parts, casing, internals, and support frame. 3. Piping connection sizes, locations, types (threaded or flanged). 4. Technical dat
10、a including temperature rating and arrangement of refractory and insulation. 5. Design pressures and temperatures. /6. Seismic design data on boiler and anchorage of boiler to foundation. Refer to Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS. / C. Boiler Trim: Inclu
11、des water level alarm and cutoff devices, low water cutoffs, piping, all valves and fittings furnished by boiler manufacturer /and stack thermometer/. 1. Design, construction, arrangement on the boiler. 2. Pressure and temperature limitations. 3. ASTM numbers and schedule numbers of piping. 4. Type
12、and pressure ratings of pipe fittings. 5. Scale ranges of gages, thermometers and pressure switches. 6. Set pressure and capacity of relief valves. D. Burner and Fuel Valve and Piping Trains: 1. Catalog data and drawings showing burner assembly and fuel train arrangement. 2. Drawings and catalog dat
13、a on all equipment in fuel trains. 3. ASTM numbers and schedule numbers on all piping. 4. Type and pressure ratings of pipe fittings. 5. Burner flow and pressure data E. Burner Management (Flame Safeguard) System: 1. Catalog data and drawings showing burner management system assembly and arrangement
14、 2. Refer to Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-05-10 23 52 25 - 3 F. Provide a ladder-type electrical diagram for boiler showing interlock requirements and clear division between
15、 the factory wiring and field wiring. G. Submit water treatment test report to determine if selected boilers will be applicable to the facility. 1.5 DEFINITIONS: A. High Efficiency Condensing Boiler: A boiler designed to recover energy normally discharged to the atmosphere through the vent. The vent
16、 gasses will condense in the boiler and vent during normal operation. The boiler shall be constructed to withstand the presence of condensation. The vent shall be constructed of corrosion resistant materials. The minimum efficiency shall be 94% on low-fire with a return water temperature of 38 degre
17、es C (100 degrees F). B. High Efficiency Non-Condensing Boiler: A boiler designed to recover a portion of the energy normally discharged to the atmosphere through the vent. The vent gasses may condense in the boiler and vent during normal operation. The boiler shall be constructed to withstand the t
18、ransient presence of condensation. The vent shall be constructed of corrosion resistant materials. The minimum efficiency shall be 86% with a return water temperature of 49 degrees C (120 degrees F): C. Standard Efficiency Non-Condensing Boiler: A conventional boiler with a standard vent. The vent g
19、asses will not condense in the boiler or vent during normal operation. The minimum efficiency shall be 80% with a return water temperature of 60 degrees C (140 degrees F). 1.6 FUEL REQUIREMENTS A. Fuels to be Fired: /Natural gas and /No. 2 fuel oil/Propane/. B. Natural Gas: High heating value is rep
20、orted as _MJ per cubic meter (_Btu per cubic foot) at gas company base pressure and temperature. Pressure provided to the inlet of the boiler-mounted regulators will be _kPa (_ inches WC) gage as maintained by main regulator station. /C. Fuel Oil: Fuel oil furnished directly to the Government by a l
21、ocal supplier. Provide burner-mounted pump and relief valve as required./ /D. LP Gas: Propane furnished directly to the Government by a local supplier. Regulators at tank area will be set at 35 kPa (5 psi) gage./ SPEC WRITER NOTE: Make material requirements agree with applicable requirements specifi
22、ed in the referenced Applicable Publications. Update and specify only that which applies to the project. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-05-10 23 52 25 - 4 1.7 APPLICABLE PUBLICATIONS A. The publications listed below form a part of th
23、is specification to the extent referenced. The publications are referenced in the text by basic designation only. B. ASTM International (ASTM): A106/A106M-08 Seamless Carbon Steel Pipe for High Temperature Service. A178/178M-02(2007) . Electric Resistance Welded Carbon Steel and Carbon-Manganese Ste
24、el Boiler and Superheater Tubes A269-08 Seamless and Austenitic Welded Stainless Steel Tubing for General Service C612-09 Mineral Fiber Block and Board Thermal Insulation D396-09a . Fuel Oils C. American Society of Mechanical Engineers (ASME): Boiler and Pressure Vessel Code - 2007 Edition with Amen
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA2352252010LOWPRESSUREWATERHEATINGBOILERSPDF

链接地址:http://www.mydoc123.com/p-1074925.html