UL SUBJECT 1321-2013 OUTLINE OF INVESTIGATION FOR POLYTETRAFLUOROETHYLENE PLASTIC SEAL MATERIALS (Issue 6)《聚四氟乙烯塑料带密封材料调研纲要》.pdf
《UL SUBJECT 1321-2013 OUTLINE OF INVESTIGATION FOR POLYTETRAFLUOROETHYLENE PLASTIC SEAL MATERIALS (Issue 6)《聚四氟乙烯塑料带密封材料调研纲要》.pdf》由会员分享,可在线阅读,更多相关《UL SUBJECT 1321-2013 OUTLINE OF INVESTIGATION FOR POLYTETRAFLUOROETHYLENE PLASTIC SEAL MATERIALS (Issue 6)《聚四氟乙烯塑料带密封材料调研纲要》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULJanuary 17, 20131UL 1321OUTLINE OF INVESTIGATIONFORPOLYTETRAFLUOROETHYLENE PLASTIC SEAL MATERIALSIssue Number: 6JANUARY 17, 2013Summary of TopicsThis new issue of UL 1321 is being issued to:a) Re
2、vise the time required to pressurize the assembly to 5minutes to verify an initial seal in paragraph 7.2.5, andb) Clarify the intent of paragraph 7.5.3 to reflect that for a leakingassembly the 336 hours begins once an attempt is made to sealthe joint by retightening.COPYRIGHT 2013 UNDERWRITERS LABO
3、RATORIES INC.UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULJANUARY 17, 2013UL 13212No Text on This PageUL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULCONTENTSINTRODUCTION1 Scope .4CON
4、STRUCTION2 General 43 Application Instructions 44 Units of Measurement .45 Undated References 5PERFORMANCE6 General 57 Assembly Construction and Initial Pressure Testing .57.1 Test assemblies 57.2 Construction of assemblies 57.3 Tests for liquid fuel applications 87.4 Test for propane applications 9
5、7.5 Test for 300 psig (2070 kPa) natural gas applications .98 Sprinkler System and Water Spray System Tests RESERVED 109 Electrical Resistance at Joints .10MARKING10 General 10SUPPLEMENT SA E25A AND E85A TEST FLUIDSSA1 Details .SA1SUPPLEMENT SB B20 and B99.9/B100 Test FluidsSB1 Details .SB1JANUARY 1
6、7, 2013 UL 1321 3UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULINTRODUCTION1 Scope1.1 These requirements are for use in the investigation of polytetrafluoroethylene plastic in the form oftape with a minimum width of 1/2 inch (12.7 mm), or in
7、 the form of cord, where the product is intended tomake threaded metal pipe joints tight against leakage. These products are evaluated when applied inaccordance with the manufacturers instructions, to male threads of metal pipe assemblies. The productsare rated for use in equipment intended to handl
8、e gasoline, gasoline/ethanol blends, diesel fuel,biodiesel/diesel fuel, biodiesel, naphtha, benzene, kerosene, petroleum oils, natural gas, propane, orbutane as specified by the manufacturer.1.2 This outline of investigation does not cover the classification of the product in regard to itsflammabili
9、ty, the toxicity of the product or its vapors due to flammability, or the effect of normalatmospheric conditions on the product while in storage or in use.1.3 If requested, tape narrower than 1/2 inch (12.7 mm) or the sealing of threaded joints in pipe sizeslarger than 1-1/2 inches may be investigat
10、ed using appropriate adaptation of tests described in Sections7 9. Tests for uses other than those indicated are not within the scope of these requirements.CONSTRUCTION2 General2.1 The thickness and density range of the material shall be specified by the manufacturer.3 Application Instructions3.1 A
11、copy or draft of the application instructions intended to accompany each product as produced is tobe used as a guide in the examination and testing of the product.3.2 The instructions shall include such directions and information deemed to be adequate for obtainingproper use of the product.4 Units o
12、f Measurement4.1 Values stated without parentheses are the requirement. Values in parentheses are explanatory orapproximate information.JANUARY 17, 2013UL 13214UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM UL5 Undated References5.1 Any undated
13、 reference to a code or standard appearing in the requirements of this outline ofinvestigation shall be interpreted as referring to the latest edition of that code or standard.PERFORMANCE6 General6.1 Sealed pipe assemblies required for the following tests shall be made using tape or cord applied ina
14、ccordance with the manufacturers printed instructions.7 Assembly Construction and Initial Pressure Testing7.1 Test assemblies7.1.1 Pipe assemblies are to be constructed in accordance with 7.1.2 7.1.4, from commercial gradeSchedule 40, minimum, malleable iron pipe and fittings (ANSI B16.3).7.1.2 The
15、fittings used are to be threaded with tapered pipe threads cut in accordance with ASMEB1.20.1 NPT tapered pipe thread.7.1.3 The mating male and female thread patterns are to be checked for evidence of damage to threadsand with regard to tolerance with ring and plug gauges manufactured in accordance
16、with ASME B1.20.1.Only pipe and fittings that show no significant evidence of thread damage and that comply with ASMEB1.20.1 tolerances shall be used to construct assemblies.7.1.4 Prior to assembly, thread patterns are to be cleaned thoroughly with a suitable degreasing solventto the extent that all
17、 traces of oil, grease, dirt, or rust are removed. Then the assembly shall be allowedto air dry at room temperature.7.2 Construction of assemblies7.2.1 The test assemblies are to be constructed for each end-use application using one tee of the largestpipe size required for testing, a reducing bushin
18、g, pipe nipple, bell reducer to -inch pipe size, -inch pipenipple, -inch tee and -inch pipe nipple, with all open fittings closed with a plug as illustrated in Figure7.1.This is generated text for figtxt.JANUARY 17, 2013 UL 1321 5UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDIST
19、RIBUTION WITHOUT PERMISSION FROM ULFigure 7.1Pipe assembly diagramJANUARY 17, 2013UL 13216UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM UL7.2.2 For an assembly intended to be used for evaluation of the product for 300 psig (2070 kPa) naturalga
20、s applications, the ” plug in the ” tee shall be replaced with a ” nipple approximately 8 “ long.7.2.3 The product under test is to be applied to the male threads of the joints in accordance with themanufacturers instructions using the minimum number of wraps specified by the manufacturer. Themaximu
21、m number of wraps to be used to evaluate a product supplied in the form of tape is 5.7.2.4 The assembly joints are to be tightened to the torque specified in Table 7.1.Table 7.1Torque requirements for pipe thread (NPT) connectionsNominal pipe size,aTorque,inches pounds-inches / foot-pounds (Nm)1/8 1
22、50 /12.5 (16.9)1/4 250 / 21 (28.3)3/8 450 / 38 (51.9)1/2 800 / 67 (90.4)3/4 1000 / 83 (113.0)1 1200 / 100 (135.5)1-1/4 1450 / 121 (163.8)1-1/2 1550 / 129 (175.1)2 1650 / 138 (186.4)aANSI/ASME B1.20.17.2.5 Each assembly shall be checked to verify an initial seal by pressurizing the assembly for 5 min
23、uteswith air in a room temperature water bath to 300 psig (2070 kPa) or the maximum pressure to which it willbe subjected when charged with the test medium, whichever is greater. If leakage is noted that cannot bestopped by retightening the joint to the torque specified above, the joint shall be dis
24、assembled andinspected. If defects in the threads, pipe or fittings are evident, the test shall be considered invalid andshall be repeated with an assembly constructed of new pipe and fittings. If no defects in the threads arenoted, the product shall be removed from both male and female threads and
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ULSUBJECT13212013OUTLINEOFINVESTIGATIONFORPOLYTETRAFLUOROETHYLENEPLASTICSEALMATERIALSISSUE6 聚四氟乙烯 塑料

链接地址:http://www.mydoc123.com/p-1069149.html