《SSPC QP 1-1998 Standard Procedure for Evaluating Painting Contractors (Field Application to Complex Industrial Structures)《评估涂料承包商的标准程序(复杂工业结构的现场应用) 编辑修订2004年11月1日》.pdf》由会员分享,可在线阅读,更多相关《SSPC QP 1-1998 Standard Procedure for Evaluating Painting Contractors (Field Application to Complex Industrial Structures)《评估涂料承包商的标准程序(复杂工业结构的现场应用) 编辑修订2004年11月1日》.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、8-5SSPC-QP 1August 1, 1998Editorial Revisions November 1, 20041. Scope1.1 This procedure describes a method for evaluating the qualifi cations of industrial fi eld painting contractors and defi nes a minimum standard for qualifi cation.1.2 The objective of this procedure is to determine if a paintin
2、g contractor has the personnel, organization, qualifi ca-tions, procedures, knowledge, and capability to perform surface preparation and coating application of the required quality under the conditions and restrictions specifi ed by the owner for complex structures.1.3 The procedure encompasses the
3、fi eld application of coatings in the industrial market. Specialty applications, such as lining materials, bituminous products, galvanizing, etc., are not covered by the requirements of this standard procedure. 1.4 The procedure does not include surface preparation and coating application conducted
4、exclusively at the contractors facility (i.e., shop painting). Shop painting is covered by the latest revision of SSPC-QP 3, “Standard Procedure for Evaluating the Qualifi cations of Shop Painting Contractors.” Also see Section 6.1 of this standard procedure.2. Description2.1 DEFINITIONS:Contractor:
5、 An individual or fi rm whose primary business is providing surface preparation and coating application services in the industrial, marine, and heavy commercial markets.Auditor: 1) The person or persons performing audits on behalf of the auditing agency or qualifying agency. 2) The body possessing t
6、he necessary technical competence to review contractor submittals, conduct on-site audits of applicants, and report results to the qualifying agency in compliance with the requirements of this procedure and the written requirements of the formal audit program.Qualifying Agency: The body responsible
7、for develop-ment, maintenance, sponsorship and operation of a program to ensure uniform compliance with the provisions of this standard procedure.Complex Structure: Complex structures are those constructed of steel or concrete, such as metal producing and rolling mills, bridges, and processing facil
8、ities, including chemical and petrochemical processing plants, pulp and paper mills, power plants and substations, and food and beverage plants and terminals. Qualifi cation: The procedure by which written assurance is given that an applicant conforms to the prescribed set of conditions or requireme
9、nts of this standard procedure.Procedure: The sequence of steps taken to carry out a particular course of action.2.2 TYPES OF STRUCTURES: Complex structures encompass a wide range of structural types and confi gura-tions. Although the required evaluation functions are similar for all complex structu
10、res, the specifi c skills (e.g., rigging or pollution controls) may be quite different for painting a bridge and painting a process facility.This procedure does not in any way differentiate between contractors engaged in work in different industries and on different structures. Owners may wish to se
11、lect contractors with the specifi c skills and experience required for the par-ticular job at hand. Some industrial subcategories with which specifi c skills may be associated are listed below: Marine/splash zone: These include structures proxi-mate to and remote from both coastal and inland shoreli
12、nes Proximate includes waterfront structures, locks, dams, ship hulls, bulkheads, piers, etc. Remote includes offshore platforms and struc-tures, etc. Bridges and towers. Metal and manufacturing facilities. Chemical and processing facilities: These include chemical and petrochemical plants, pulp and
13、 paper mills, food and beverage plants, and water and waste facilities. Power generation facilities and distribution structures.2.3 FUNCTIONS TO BE EVALUATED: The procedure identifi es four functional areas to be evaluated: Management Procedures, Technical Capabilities, Quality Control, and Safety a
14、nd Health. General requirements for each of these function areas are presented in Section 3.2.4 EVALUATION PLANNING: The qualifying agency must develop criteria and/or rating plans to evaluate each contractor against this standard. The qualifying agency shall also determine which of the specifi c, c
15、ritical items within the four function areas are to be evaluated for subsequent fol-low-up or evaluations, ensuring the items evaluated are the SSPC: The Society for Protective CoatingsQUALIFICATION PROCEDURE NO. 1Standard Procedure for Evaluating Painting Contractors(Field Application to Complex In
16、dustrial Structures)8-6SSPC-QP 1August 1, 1998Editorial Revisions November 1, 2004same for all contractors. The sequence of steps for conduct-ing an evaluation within a certifi cation program is outlined in Section 4. The evaluation, in each instance, will be performed by the auditor.3. General Qual
17、ifi cation Requirements3.1 MANAGEMENT PROCEDURES: The applicant must demonstrate adequate procedures for disseminating company policy and for personnel, administrative and fi nancial manage-ment as follows:3.1.1 Contractor Policy: The contractor shall have:a. Written policies on quality, safety, and
18、 health.b. Written procedures for disseminating company policies within the organization. The contractor shall demonstrate that procedures are followed.3.1.2 Organization and Personnel: The contractor shall have:a. Organizational chart showing division of responsibility within the contractors compan
19、y.b. List of names, titles, duties, and job descriptions for key personnel (management, technical, quality control, safety). The job description shall state the experience, licenses, certifi cations and training and refresher courses required for each position.3.1.3 Administrative and Management Pro
20、cedures: The contractor shall provide:a. A brief, written description of the contractors method of fi nancial record keeping.b. Procedures used for contract estimating and schedul-ing, and for cost accounting.c. Procedures used to review specifi cations and other bid documentation.d. Formal procedur
21、es for learning about and meeting current federal, state and local environmental, health, and safety regulations.3.2 TECHNICAL CAPABILITIES: The contractor must employ qualifi ed personnel; have adequate technical resources; have suitable job conversion procedures; and have appropri-ate equipment, f
22、acilities, and experience. The contractor shall provide the following:3.2.1 Personnel Qualifi cations:a. Records of training that is available to and utilized by qualifi ed workers, including training required to meet regulatory requirements.b. A method for monitoring profi ciency of workers per-for
23、ming surface preparation and coating application and relevant documentation.c. Qualifi ed site personnel, including surface preparation and coating application personnel. 3.2.2 Technical Resources:a. A list of technical societies, trade bodies, or other industry groups (universities, major manufactu
24、rers, consultants) with which the contractor is associated. Current membership certifi cates or correspondence shall be maintained to verify the association.b. Verifi cation that the company maintains a library of current technical standards appropriate for types of work performed. 3.2.3 Procedures:
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SSPCQP11998STANDARDPROCEDUREFOREVALUATINGPAINTINGCONTRACTORSFIELDAPPLICATIONTOCOMPLEXINDUSTRIALSTRUCTURES

链接地址:http://www.mydoc123.com/p-1054498.html