1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. ISBN 978-0-626-22244-4 SANS 1169:2008Edition 1.1Any reference to SABS 1169 is deemedto be a reference to this standard(Government Notice No. 1373 of 8 No
4、vember 2002)SOUTH AFRICAN NATIONAL STANDARD Temporary stands Published by SABS Standards Division 1 Dr Lategan Road Groenkloof Private Bag X191 Pretoria 0001Tel: +27 12 428 7911 Fax: +27 12 344 1568 www.sabs.co.za SABS SANS 1169:2008 Edition 1.1 Table of changes Change No. Date Scope Amdt 1 2008 Ame
5、nded to change the designation of SABS standards to SANS standards, with no technical changes. Foreword This South African standard was approved by National Committee SABS TC 214, Access equipment, in accordance with procedures of the SABS Standards Division, in compliance with annex 3 of the WTO/TB
6、T agreement. This document was published in December 2008. This document supersedes SABS 1169:1978 (first edition). SANS 1169:2008 Edition 1.1 1 Contents Page Foreword 1 Scope 3 2 Definitions . 3 3 Design . 4 3.1 General requirements 4 3.2 Load requirements . 8 4 Construction 9 4.1 Foundations . 9 4
7、.2 Standards 9 4.3 Ledgers . 9 4.4 Decking . 9 4.5 Guard rails . 9 4.6 Transoms . 9 4.7 Tubes and tube fittings 9 4.8 Bracing 10 4.9 Foot ties . 10 4.10 Workmanship . 10 Appendix A Applicable standards . 11 SANS 1169:2008 Edition 1.1 2 This page is intentionally left blank SANS 1169:2008 Edition 1.1
8、 3 Temporary stands 1 Scope 1.1 This specification covers the requirements for the design and erection of temporary stands that provide seating or standing accommodation for spectators. Requirements for access to and egress from the stands are also covered. NOTE The titles of standards referred to b
9、y number in the specification are given in appendix A. 2 Definitions For the purposes of this specification the following definitions shall apply: aisle a passage at right angles to and next to or between grouped seats and leading to an exit, a gangway, or a longitudinal walkway approved approved by
10、 the authority having jurisdiction over the enforcement or application of the requirements of the specification base-plate a plate used to distribute the load from a standard or raker bay the space defined by two adjacent transverse rows of standards brace a diagonal member of a stand that is so att
11、ached to other members as to afford stability (in a desired plane) to the stand coupler a fitting that so grips the external surfaces of two members as to secure them together exit a point of egress that opens directly into a safe dispersal area or an unobstructed lane foot tie a horizontal member d
12、esigned to restrain movement of the lower end of a standard guard rail a member incorporated in a stand to safeguard users from falling off SANS 1169:2008 Edition 1.1 4 hand rail a member incorporated in a stand to guide and assist the movement of people ledger a member that spans a stand horizontal
13、ly and ties it longitudinally, and that may also act as a support for putlogs or transoms lift the height from the ground or floor to the lowest ledger, or the vertical distance between adjacent ledgers, as relevant promoter the individual or organization that commissions the erection of the tempora
14、ry stand putlog coupler a non-load-bearing (positioning) coupler used to secure a putlog or transom to a ledger raker an inclined load-bearing member right-angle coupler a coupler (other than a putlog coupler) used for connecting structural members at right angles sole-plate a timber or other suppor
15、t of adequate size and strength, used between a base-plate and the ground to distribute the load standard a vertical supporting member temporary stand an assembly of prefabricated, or other components that are designed for ready and periodic erection, dismantling, and transport, and intended for the
16、 provision of temporary seating or standing accommodation for persons transom a member that spans a structure horizontally and ties it transversely, and that may also support decking 3 Design 3.1 General requirements 3.1.1 Approval of design No work in connection with the erection of a temporary sta
17、nd shall be commenced unless the plans and specifications have been approved. 3.1.2 Approval of construction The construction of a temporary stand shall be approved before its initial use; in addition, maintenance of compliance with the specification shall be checked within 36 h before each subseque
18、nt use by thorough visual examinations by an authorized inspector1). 1) The inspector should pay particular attention to compliance with the requirements for freedom from obstructions and fire hazards (see 3.1.11(b), and 3.1.15), the efficiency of lights and signs (see 3.1.14), the stability and ali
19、gnment of hand and guard rails, the condition of all components of the stand, and the workmanship (see 4.10). SANS 1169:2008 Edition 1.1 5 3.1.3 Accessibility All temporary stands shall be so sited that there is at all times ample and unrestricted access to open spaces2). 3.1.4 Location No temporary
20、 stand shall be erected on any other structure unless such a structure is of adequate strength (as determined by a professional engineer) to safely support the additional loads involved. 3.1.5 Capacity3)The maximum capacity of any temporary stand shall be based on the number of fixed seats, each of
21、at least 475 mm width, plus an allowance of one person for each 0,3 m2of floor area designated or intended as standing space. The floor area of stairways, ramps, aisles, walkways, and other spaces within structures or enclosures used for access or circulation shall not be considered in computing the
22、 capacity of a stand. 3.1.6 Seating a) The height of a seat above its footrest shall be at least 250 mm. b) In the case of seats without backrests, the horizontal centre-to-centre distance between consecutive rows shall be at least 675 mm. c) Seats with backrests shall have a depth of at least 350 m
23、m, measured along the horizontal surface of the seat, the horizontal centre-to-centre distance between consecutive rows shall be at least 750 mm, and the horizontal clearance between the backrests and the seats in consecutive rows shall be at least 300 mm. d) Individual seats and chairs shall be per
24、mitted only if firmly secured in rows in an approved manner, except that seats placed on a level floor in a railed-in enclosure or in a box need not be anchored, if they do not exceed 16 in number. 3.1.7 Decking Temporary stands shall be decked with timber boards or other approved material designed
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS11692008TEMPORARYSTANDS 临时 支架 PDF