SANS 10120-2 LG-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 2 Project specification Section LG Pip.pdf
《SANS 10120-2 LG-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 2 Project specification Section LG Pip.pdf》由会员分享,可在线阅读,更多相关《SANS 10120-2 LG-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 2 Project specification Section LG Pip.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. Clause StlBS 0120 : Part 2 Section LG-1933 Pipe jacking PART 2 : PROJECT SPECIFICATlON SECTION LG CONTENTS Page Number ESSENTIAL PROJECT SPECIFICATION CL
4、AUSES . 1 ESSENTIAL DATA 1 ADDITIONAL CLAUSES . 1 General 1 Normal Projccts l Pipe jacking under roads, railways, or other facilities cortrolled by third parties . 1 Jacking of pipelines under South African Transport Services tracks 1 Continuous jacking 2 Tolerances 2 June 1383 Approved by the COUNC
5、IL OF Till: SOUTll APIUCAN BUREAU OF STANDARDS 1 SABS 1200 LG : PIPE JACKING SABS 0120 : Part 2 Section LG-1983 pipe jacking NOTE a) Number PSLG clauses in Portion 2 of the project specification in the sequence in which the clauses to which they relate appear in SABS 1200 LG. b) The clause number(s)
6、 given at the beginning or after the heading of a clause is/are, unless otherwise stated, the number(s) of the relevant clause(s) of SABS 1200 LG. ESSENTIAL PROJECT SPECIFICATION CLAUSES Set out suitable clauses in Portion 2 of the project specification to provide essential information as follows :
7、a) (Subclause 5.1.1) Set out details of arrangements made with the controliing authority (see 3.2.1 and 3.2.2 below). b) (Subclause 5.6) 1) Where not given on the drawings, specify the extent and density of backfilling required. 2) Designate a disposal area for excavated material. c) (Subclauses 8.2
8、.4 and 8.2.5) Except where adequate data have been given in PS3 (Nature of ground and subsoil conditions) of Portion 1 of the project spccification, give a description of the materials through which the pipeline is to be jacked (see Subclause 1.1.2 of Section LG of Part 3 of the code). ESSENTIAL DAT
9、A The availability of certain essential data may affect the prices tendered. Except where such data have been given in the schedule or in the tender drawings, set out suitable clauses covering items such as the followirig in Portion 2 of the project specification: a) (Subclauses 5.1.3 and 5.8) State
10、 whether the contractor is to provide designs, etc. (See also (b) below. ) b) (Subclause 5.4.2) State whether provision must be made to deal with vibration arising from road or rail traffic or other sources. C) (Subclauses 6.1 and 6.2) State thc tolerances that wiil apply if other than those specifi
11、ed in SABS l200 LG (see 3.2.4 below) . cl) (Subclause 8.1.4) If applicable, identify lengths of pipeline over which “cut and cover“ construction will be accepted. ADDITIONAL CLAUSES GENERAL. Where it is necessary to amplify or otherwise to vary the terms of SABS 1200 LG to render them suitable for u
12、se in projects to be carried out in particular locations or under particular circumstances, include in Portion 2 of the project spccification clauses dealing with matters other than those covered by Clauses 1 and 2 above. (See also Subclause 1.3 of Section LG of Part 3 of the code.) NOTE: To meet re
13、quirements imposed by various norms of economic development, projects are classified as normal, prestige, subeconomic, and labour-based projects (see Clause 4 of Section 0 of Part 3 of the code) . Pipe Jacking under Roads, Railways, or ogher Facilities Controlled by Third Parties (subclauses 5.1.1 -
14、 and 5.2.3.2). In addition to a wayleave being arranged for any pipeline that is to pass across property .- - - owned by others, special authority-must be obtained for the jacking of the pipeline because of the need to investigate subsurface conditions, to locate other services buried in the area, a
15、nd to give notice of an unconventional method of construction that, while avoiding disruption of traffic and of the environ- mcnt, may involve a low risk. Some authorities require application to be made in a particular format but, regardless of the format, it is always necessary to request permissio
16、n and to give an outline (with drawings) of the proposed pipe jacking operation, and also to ask what requirements are to be met both before and during construction. As the details of such arrangements will have a considerable impact on the cost of the operation, it is necessary that those matters b
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS101202LG1983CODEOFPRACTICEFORUSEWITHSTANDARDIZEDSPECIFICATIONSFORCIVILENGINEERINGCONSTRUCTIONANDCONTRACTDOCUMENTSPART2PROJECTSPECIFICATIONSECTIONLGPIPPDF

链接地址:http://www.mydoc123.com/p-1028498.html