《SANS 10120-2 LF-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 2 Project specification Section LF Erf.pdf》由会员分享,可在线阅读,更多相关《SANS 10120-2 LF-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 2 Project specification Section LF Erf.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. Clause - SAUS 0120 : Part 2 Section LF-l983 Er connections (wat:crrI PART 2 : PROJECT SPECIFICATION SECTION LP CONTENTS ESSENTTAL PROJECT SPISCIFICATION
4、CLAUSES . l ESSENTIAL DATA . l AUDITIONAL CLAUSES 1 General . I Normd Projects 1 AC pipe and fittings 2 Range of volume registration by meters 2 Service connections 2 Documentation and design requirements 2 Prestiqe Projects 2 Subeconomic Projects . 2 Labour-based Projects 2 June 1983 Approved by th
5、e COUNCIL OF THE SOUTH AFRICAN BUREAIJ OF STANDARDS 1 SARS 0170 : Part 2 Section 1.P-1983 Erf connections (water) SARS 1200 LP : ERF CCNNECTTONS (WATER) NOTE a) Number PSLF clauses in Portion 2 of the project specification in the sequence in which the clauses t-o which they relate appear in SABS l20
6、0 LP. 1,) The clause nnml7er(s) given at the lx:ginn.ing or alter i.hc IexIing of a cloust? isjal-c, ulrlc:;:; 011;lwiw stated, the number(s) of the relevant clause(s) of SAW 1200 LE. I. ESSENTIAL PROJECT SPECIFICATION CLAUSES 1.1 Set oui suitable clauses in Portion 2 of the project specification to
7、 provide essential infor-mat.icm as follows: a) (Subclause 3.1.4) When relevant, state or schedule the type and class of polyethylcne pipes to he used for the service connection. b) (Subclause 3.1.5) When relevant, state the class of uPVC pipes. C) (riubclause 3.2.1) State the type of operating memb
8、er required for hand operation if a crutch 1s riot required for the stop taps. d) (Subclauses 3.2.2, 6.2, and 7.3.1) State the type, make, and the range of volumes of water that each meter must be capable of registering, the applicable working pressure, the maximum flow ratv of the water and, when r
9、elevant, the type and class of the pipes to which the meters are to be connected. (Sec also 3.2.2 below.) c) (Subclauses 3.6 and 5.4.1) Sei- out the requirements for markings or for marker posts, as apl-liall, and state how and where each marker post is to be set up. f) (Subclause 5.2.3.2) Where a p
10、lug-in type ferrule is acceptable for AC pipes, set out the rrquirements for the ferrule, the method of fitting it, and the extent to which the ferrule may project into the bore of tle pipe. g) (Subclause 5.2.3.4) Set out the procedures required to be observed by the contractor in making a connectio
11、n to a steel pipe that has a lining or a coating. h) (Subclause 5.5) Give details as to how the meter is to be installed i.f the details given on Drawing LP-3.1 of Section LP of Part 3 of the code are not acceptable. (See also Subclause 3.1.2 of Section LF of Part 5 of the code.) i) (Subclause 6.2)
12、See (d) above. 2. ESSENTIAL DATA 2.1 The availability of certain essential data may affect the prices tendered. Except where such data have been given in the schedule or in the tender drawings, set out suitable clauses covering items such as the following in Portion 2 of the project specification: a
13、) (Subclause 3.1) Where material more expensive than any of those specified in Subclause 3.1 ol SAW l200 LF (such as stainless steel) is to be used for a pipeline or fittings in corrosive soils or in certain industries, specify the requirements and schedu3e the items accordingly. (See also Subclause
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS101202LF1983CODEOFPRACTICEFORUSEWITHSTANDARDIZEDSPECIFICATIONSFORCIVILENGINEERINGCONSTRUCTIONANDCONTRACTDOCUMENTSPART2PROJECTSPECIFICATIONSECTIONLFERFPDF

链接地址:http://www.mydoc123.com/p-1028497.html