SANS 10120-2 LC-1981 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 2 Project specification Section LC Cab.pdf
《SANS 10120-2 LC-1981 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 2 Project specification Section LC Cab.pdf》由会员分享,可在线阅读,更多相关《SANS 10120-2 LC-1981 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 2 Project specification Section LC Cab.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. SARS 0120 : Par1 2 Section LC-1981 Cable ducts IJAIC 2 : PROJECT SIIFICATION, PoIrrIorj 2 SECTlON 1,C CONTENTS Clause Page Number I. ESSENILAI, PKO.JECT
4、SPECII“ICATIO# CIAUSES . . . . . . . . . . . . . . . . . . . . . . . . . . . . I 2. ESSENTIAL ntir . I 3. A1)DITLONAL CLAUSES . I 3.1 General 1 3.2 Normal Projects . 3.2. l Pillars or kiosks . 3.2.2 Crossings of telephone and electricity cable ducts 3.2.3 Co-ordination of work of contractors 2 .v 2
5、2 .S 2 lan GCC . . 2 3.2.4 Testing where contracts are governed by conditions of contract other t 3.2.5 Subcontracts fur laying cables . 3.3 Prestige Projects 3.4 Subecononic Projects . 4 DRAW l NGS Drawing LC-2.1 - Precast: Concrete Sl.abs for Cable Protection 5 Drawing LC-2.2 - Iolyethel ene Ldent
6、if ication Tape . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 Noven11,er 198 1 Approved by the COUNCIL OF TM13 SOUTll AFRICAN BUREAU OF STAN1)ARUS SARS 0120 : Part 2 Sect ion 1.C-1981 Cable ducts SARS 1200 ,C : CAR13 IIUCTS a) Number the PSLC clauses in
7、Portion 2 nT the proJact specification in the sequence in whlcli the clawes to whlch they relate appear ipl SARS 1200 LC. b) The clawe numter(s) given st the kc?ginning or after the hencling of a clause is/are, clnless otherwise stated, the number(s) of the relevant clnuse(s) of SARS 1200 LC. ESSENT
8、IAL PROJECT SPECLPLCAPLON CLAUSES Set out suitahle clauses in Portion 2 of the project specification to provide essential information. as follows: a) (Subclause 3.l(c) On projects involving ducts for ESC cahles, state the nominal size ad class of AC pipe reqrtrrd. e.g. I00 mm Class T with ruh1)er jo
9、int sleevrs , 150 mm Class 3s with sleeve type conplings, etc. Other autlorities may require Class D or Class 24 AC ducts. b) (Subclause 3.4) When relevant, state the requirements for cable markers. c) (Subclause 5.1 .l) Where it is impracticable to obtain the specified cover to cable ducts. specify
10、 details of any speclal treatment that is to be given to backfill material or give other special requirements for duct protection. d) (Subclause 5.1.2) Designate the parts of the trench where it is known that shoring will he required to protect structures or services contiguous to the trench route.
11、ESSENTIAL DATA The availability of certain essential data may aifect the prices tendered. Except where such data have been given in the schedule or in the tender drawings, set out suitable clauses covering item such as the following in Portlon 2 of the project specification: a) (Stbclause 3.1) State
12、 or scliedule the type(s) and class(es) (as relevant) of cable ducts to be prwided. b) (Subclause 5.4) Designate areas, if any, that warrant hackfill of a higher class than is required elsewhere and are to be backfilled in layers of 150 mm and compacted to densities higher than those required elsewh
13、ere. c) (Subclause 5.6) When cables are to be laid in the same trench as other services, schedule an additional item for the length of trench that is to carry other services, in addition to stating the applicable trench width if Subclause 8.2.4 of SARS 1200 llB is not applicable. d) (Subclause 5.7)
14、State the material to be wed for split sleeves. (See 3.2.2 and Subclause 1.3.3 of Sectlon LC of Part 3 of the code.) e) (Subclauses 5.6 and 5.7) State details of actton to be taken where a problem involving existing services in relation to the works Ls likely to occur but is not obvious. f) (Subclau
15、se 5.11) State which road crnssings, if any, are to he reinstated immediately after the trench has been backfilled. g) (Subclacme 8.2.2(a) Designate dlsposal areas for surplus material, if it may not be disposed of in the trench servitude within 0.5 km of source. 11) (Subclawe 8.2.2(b) Where excavat
16、ion is through boulder material. state the maximum size of stones allowed in hackf il l. i) (Subclause 8.2.6) If importation of bedding is scheduled, designate the source. (See also (b) above.) ADDITIONAL CLAllS KS GRNRRAI,. Where it ir necessary to amplify or otherwise to vary the terms of SABS 120
17、0 LC to render them suitable for use in projects to he carried out in particular locations or under particular circumstances, include in Portion 2 of the project specification clauses dealing with matters other than those cuvered by Clauses l and 2. Certain of the PS clauses given in Section DB may
18、he required. Ilepending on the nature of the contract PSDB or PSLC clauses may he used For variation5 to the requirements Eor trench excavations and for the main fill. Provide suitable PSLC clauses to deal with the matters covered by 3.2. SABS 01 20 : Part 2 Section LC-1981 Cable ducts NORMAL PROJEC
19、TS NOTE: To meet requirements imposed by varioits nonns of economic development, proJects are classLfied as normal, prestige. subeconomic, and labour-based projects (see Clause 4 of Section o of Part 2 of the code). Pillars or Kimks. Where roots of pillars or kiosks have to he placed by the civil co
20、ntrnctor, specify the work to be done and insert suitable menslrrement and payment clauses. Crnssings of Telephone and Electricity Cable Dua (Subclause 5.7). Except in the case of bitumen- coated cables, the electricity supply cable may be provided with an approved type of pitch-impregnated fibre sp
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS101202LC1981CODEOFPRACTICEFORUSEWITHSTANDARDIZEDSPECIFICATIONSFORCIVILENGINEERINGCONSTRUCTIONANDCONTRACTDOCUMENTSPART2PROJECTSPECIFICATIONSECTIONLCCABPDF

链接地址:http://www.mydoc123.com/p-1028495.html