REG NASA-STD-8719 24 ANX W CHG 2-2012 ANNEX TO NASA-STD 8719 24 NASA EXPENDABLE LAUNCH VEHICLE PAYLOAD SAFETY REQUIREMENTS REQUIREMENTS TABLE.pdf
《REG NASA-STD-8719 24 ANX W CHG 2-2012 ANNEX TO NASA-STD 8719 24 NASA EXPENDABLE LAUNCH VEHICLE PAYLOAD SAFETY REQUIREMENTS REQUIREMENTS TABLE.pdf》由会员分享,可在线阅读,更多相关《REG NASA-STD-8719 24 ANX W CHG 2-2012 ANNEX TO NASA-STD 8719 24 NASA EXPENDABLE LAUNCH VEHICLE PAYLOAD SAFETY REQUIREMENTS REQUIREMENTS TABLE.pdf(412页珍藏版)》请在麦多课文档分享上搜索。
1、 NASA TECHNICAL STANDARD ANNEX (with Change 2) to NASA-STD 8719.24 National Aeronautics and Space Administration Washington, DC 20546 Approved: 2011-08-26 Change 2 Approved: 2012-06-19 ANNEX TO NASA-STD 8719.24 NASA EXPENDABLE LAUNCH VEHICLE PAYLOAD SAFETY REQUIREMENTS: REQUIREMENTS TABLE Requests f
2、or relief from the requirements in this document are processed through the NASA Safety and Mission Assurance Technical Authority APPROVED FOR PUBLIC RELEASE DISTRIBUTION IS UNLIMITED Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Annex to NASA-STD-8
3、719.24- Initial Issue with Change 2 FOREWORD This Annex to NASA-STD 8719.24 is published by the National Aeronautics and Space Administration (NASA) as the template for developing project range safety programs after removal of this cover page. For background on the development of the requirements se
4、t below, see the base NASA-STD 8719.24. Comments and questions concerning the contents of this publication should be referred to the National Aeronautics and Space Administration, Director, Safety and Assurance Requirements Division, Office of Safety and Mission Assurance, Washington, DC 20546 or vi
5、a “Feedback” in the NASA Technical Standards System at http:/standards.nasa.gov. /s/ August 26, 2011 Bryan OConnor Approval Date Chief, Safety and Mission Assurance Change 1 approved: _Wilson B. Harkins_ dated: January 26, 2012Change 2 approved: _ dated: _ DOCUMENT HISTORY LOG Status Document Revisi
6、on Approval Date Description Baseline 2011-08-26 Initial Release (JWL4) Annex Change 1 2012-01-26 - Page 3: Corrected PSWG Chair signature block; - Pages 187 Vol 3, para13.1.1.1 and Vol 7, removed revision from ST/SG/AC.10.1; - Vol 7 page 404, bolded “hazardous materials” definition header (JWL4) An
7、nex Change 2 2012-06-19 Throughout document: Corrected 18 typographical errors (Administrative Change) (JWL4) This document is subject to reviews per Office of Management and Budget Circular A-119, Federal Participation in the Development and Use of Voluntary Standards (02/10/1998) and NPR 7120.10,
8、Technical Standards for NASA Programs and Projects. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-TAILORED REQUIREMENTS FOR PROJECT Name From: NASA-STD-8719.24 Ch 1 Annex Ch 2, June 19, 2012 Logo PROJECT NAME XXX XX Month 201X Revision: X PROJECT N
9、AME SAFETY REQUIREMENTS Prepared for: NASA Center Under contract: Contract Number COMPLIANCE WITH THIS PUBLICATION IS MANDATORY Prepared by: Companys Name Companys Address Companys Phone Number _ _ Prepared by (Name) Name Preparer Title Project Manager Organization NASA Center Date: _ Date: _ _ _ Na
10、me Name Project SMA Technical Authority Launch Services Program SMA Technical Authority NASA Center NASA Center Date: _ Date: _ _ _ Name Name Organization Payload Safety Working Group Chairperson Date: _ Date: _ Provided by IHSNot for ResaleNo reproduction or networking permitted without license fro
11、m IHS-,-,-TAILORED REQUIREMENTS FOR PROJECT Name Page 4 of 412 From: NASA-STD-8719.24 Ch 1 Annex Ch 2, June 19, 2012 FOREWORD The Original Text column of the following requirements matrix contains the NASA Expendable Launch Vehicle (ELV) payload safety requirements that are to be tailored for each N
12、ASA ELV payload project, as required by NPR 8715.7, “Expendable Launch Vehicle Payload Safety Program.” The NASA ELV payload safety requirements are the result of a joint effort by NASA and U.S. Air Force Range Safety representatives (30thand 45thSpace Wings) to establish an approved baseline from A
13、FSPCMAN 91-710, “Range Safety User Requirements,” and applicable NASA safety requirements and also address unique issues associated with NASA payload safety design and operations. The NASA ELV payload safety requirements apply to all NASA ELV payload projects launched from an Air Force, NASA, or oth
14、er range/launch site. The NASA ELV payload safety requirements supplement NPR 8715.7 and satisfy AFSPCMAN 91-710 when applied to NASA ELV launches from Air Force launch ranges. As such, they provide a streamlined starting point for the safety requirements tailoring process that is required for each
15、NASA ELV payload project per NPR 8715.7. The NASA ELV payload safety requirements (as tailored for each specific project) are mandatory for each NASA ELV payload project and are to be applied to associated contracts and/or agreements. Additional requirements may be imposed by other organizations, in
16、cluding other launch ranges, commercial payload processing facility operators, or launch vehicle contractors. This document does not alter or otherwise modify the authority or roles and responsibilities delineated by statute or policy applicable to the Air Force, NASA, or other organizations partici
17、pating in a NASA ELV payload project. As outlined in ASPCMAN 91-710, the Space Wing Commanders have overall launch authority and responsibility for public safety at Air Force ranges. The Director, NASA Wallops Flight Facility has similar authority and responsibility for launches originating from Wal
18、lops Flight Facility. AFSPCMAN 91-710 requirements not applicable to NASA ELV payloads were eliminated from the following NASA ELV payload safety requirements tailoring matrix. This results in irregular numbering of paragraphs where certain paragraph(s) may appear to be skipped or missing because th
19、ey were not applicable. Additionally, in some cases entire inapplicable volumes or chapters may be missing and are not included in the tailoring matrix. The absence of these requirements does not alter the Air Force Range Safety authority. The project may add back any AFSPCMAN 91-710 requirements th
20、at are pertinent to their project upon agreement by the projects Payload Safety Working Group (PSWG) and Range Safety representatives. Questions pertaining to the requirements in this document and applicable local safety requirements should be brought to the attention of the payload projects PSWG. P
21、er NPR 8715.7, Payload Project Offices will contact the NASA ELV Payload Safety Manager as early as practical in the projects Concept and Technology Development, Phase A, to establish the projects PSWG and initiate the payload safety review and approval process, which includes the requirements tailo
22、ring process. The NASA ELV Payload Safety Manager is responsible for maintaining and keeping the NASA ELV payload safety requirements current and coordinating all changes with the NASA ELV Payload Safety Agency Team and the Air Force Range Safety 30thand 45thSpace Wing Safety Offices. The NASA ELV P
23、ayload Safety Manager contact information and the NASA ELV payload safety requirements tailoring matrix are available on the NASA ELV Payload Safety Program website at: http:/kscsma.ksc.nasa.gov/ELVPayloadSafety/Default.html. Note: This Foreword provides background information that is applicable to
24、all NASA ELV payload projects. It is not to be tailored and shall remain as part of each final project-specific safety requirements document. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-TAILORED REQUIREMENTS FOR PROJECT Name Page 5 of 412 From: N
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASASTD871924ANXWCHG22012ANNEXTONASASTD871924NASAEXPENDABLELAUNCHVEHICLEPAYLOADSAFETYREQUIREMENTSREQUIREMENTSTABLEPDF

链接地址:http://www.mydoc123.com/p-1019573.html