1、Lessons Learned Entry: 1363Lesson Info:a71 Lesson Number: 1363a71 Lesson Date: 2003-01-01a71 Submitting Organization: ARCa71 Submitted by: Donald R. MendozaSubject: Risk Management (RM): The Use of Formal Versus Informal Methods Abstract: The “informal“ RM implemented by the project was efficient an
2、d effective because it was built into many of its day-to-day activities including: ongoing workshops, peer reviews, project meetings, and the use of Subject Matter Experts (SMEs) to assist with identification of risks and to plan their mitigation.Description of Driving Event: The Project was already
3、 in its implementation phase and had developed various methods and processes to identify and manage risks before the Agencys Continuous Risk Management (CRM) course was available. Additionally, based on its existing RM processes and experiences the Project felt that CRM was not suitable for their ac
4、tivities. In particular, it was felt the CRM “quantitative“ risk assessments (such as weighted risk factors and discrete risk values) would have been forced, misleading and therefore undermining to the existing albeit “qualitative“ process. Thus, while the Project did complete the CRM training, its
5、formal structure was not incorporated into its RM processes.Lesson(s) Learned: 1. The “informal“ RM adopted by the Project was efficient and effective because RM was built into many of its day-to-day activities including: ongoing workshops, peer reviews, Project meetings, and the use of Subject Matt
6、er Experts (SMEs) to assist with identification of risks and to plan their mitigation.2. 3. Performing an annual reevaluation of existing risks and identification of new risks helped strengthen the Projects risk awareness and its sensitivity to RM.Provided by IHSNot for ResaleNo reproduction or netw
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS13632003LESSONSLEARNEDRISKMANAGEMENTRMTHEUSEOFFORMALVERSUSINFORMALMETHODSPDF

链接地址:http://www.mydoc123.com/p-1019002.html