REG NASA-LLIS-1141--2000 Lessons Learned International Space Station (ISS) Program CRV Schedule Delay.pdf
《REG NASA-LLIS-1141--2000 Lessons Learned International Space Station (ISS) Program CRV Schedule Delay.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-1141--2000 Lessons Learned International Space Station (ISS) Program CRV Schedule Delay.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 1141Lesson Info:a71 Lesson Number: 1141a71 Lesson Date: 2000-02-01a71 Submitting Organization: HQa71 Submitted by: David M. LengyelSubject: International Space Station (ISS) Program/CRV/Schedule Delay Description of Driving Event: Crew Return Vehicle (CRV) Schedule Requirement
2、 for ISS Crew Greater Than 3Lesson(s) Learned: Acquisition of the ISS Crew Return Vehicle (CRV) has been lagging and appears to be facing further delay. The full-crew CRV is needed for long-term safe operation of the ISS with a crew larger than three astronauts.Recommendation(s): Take whatever steps
3、 are necessary to halt the delays to the CRV program without jeopardizing adequate demonstration of safety of design and certification of human-rating.Evidence of Recurrence Control Effectiveness: NASA concurs with the ASAP recommendation. Significant progress has been made in establishing the CRV p
4、roject in the last year due to commitment at all levels within NASA - from the Administrator, the Office of Space Flight, JSC, the ISS Program Office, and the X-38/CRV Project Office. The original Office of Management and Budget (OMB) decision and Congressional markup reduced the project funding in
5、FY 2000, which delayed the start of CRV Phase 1 (engineering development through critical design review). NASA Headquarters successfully argued for the necessity of starting Phase 1 in FY 2000 and obtained OMB concurrence to transfer funding to start this phase in late FY 2000.The request for propos
6、als for CRV Phase 1 has been released since the last ASAP review. Bids have Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-been received from three offerors and are currently being evaluated. The current evaluation schedule will allow a Phase 1 cont
7、ract award in the August-September 2000 timeframe, and the funding is in place.In support of this planned CRV Phase 1 start, the X-38 Project Office has worked with the Langley Research Center (LaRC), Independent Program Assessment Office, to close out all open actions from the LaRC independent asse
8、ssment (IA). Approximately 90 percent of the 110 “maturity gates“ identified by the IA team have been closed to date, and an acceptable status of all of the 110 items is expected prior to a final Headquarters Program Management Council presentation in July 2000. Progress on these items confirms a si
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS11412000LESSONSLEARNEDINTERNATIONALSPACESTATIONISSPROGRAMCRVSCHEDULEDELAYPDF

链接地址:http://www.mydoc123.com/p-1018780.html