REG NASA-LLIS-0499-1996 Lessons Learned - Pressure Verification During Pressure Systems Operations and Maintenance.pdf
《REG NASA-LLIS-0499-1996 Lessons Learned - Pressure Verification During Pressure Systems Operations and Maintenance.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-0499-1996 Lessons Learned - Pressure Verification During Pressure Systems Operations and Maintenance.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 0499Lesson Info:a71 Lesson Number: 0499a71 Lesson Date: 1996-12-09a71 Submitting Organization: JSCa71 Submitted by: L. UnderwoodSubject: Pressure Verification During Pressure Systems Operations and Maintenance Description of Driving Event: A maintenance team was removing a gat
2、e valve from a high pressure (5000 pounds per square inch) nitrogen trailer at the fill end of the trailer. After the valve bolts were removed and the employee tapped on the valve to loosen it, the valve flew off and hit one of the maintenance employees. The employee was thrown 15 feet through the a
3、ir and against an I-beam, resulting in a fatality. Preliminary information indicated that the system was not under pressure and the valve gauge reading was zero pressure.This event occurred during work external to NASA but includes information that is pertinent to NASA operations.Lesson(s) Learned:
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS04991996LESSONSLEARNEDPRESSUREVERIFICATIONDURINGPRESSURESYSTEMSOPERATIONSANDMAINTENANCEPDF

链接地址:http://www.mydoc123.com/p-1018146.html