1、 Requirements for the Use of Rework Materials in Manufacturing of Polyethylene Gas Pipe TN-30/2013 105 Decker Court, Suite 825, Irving, TX 75062P: 469-499-1044F: 469-499-1063www.plasticpipe.org FOREWORD This technical note was developed and published with the technical help and financial support of
2、the members of the PPI (Plastics Pipe Institute, Inc.). The members have shown their interest in quality products by assisting independent standards-making and user organizations in the development of standards, and also by developing reports on an industry-wide basis to help engineers, code officia
3、ls, specifying groups, and users. This note has been prepared by PPI as a service of the industry. The information in this report is offered in good faith and believed to be accurate at the time of its preparation, but is offered “as is” without any express or implied warranty, including WARRANTIES
4、OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. Any reference to or testing of a particular proprietary product shall not be construed as an endorsement by PPI, which does not endorse the proprietary products or processes of any manufacturer. Industry members offer the information in this n
5、ote for consideration in fulfilling their own compliance responsibilities. PPI assumes no responsibility for compliance with applicable laws and regulations. PPI intends to revise this note from time to time, in response to comments and suggestions from users of the note. Please send suggestions of
6、improvements to the address below. Information on other publications can be obtained by contacting PPI directly or visiting the web site. The Plastics Pipe Institute http:/www.plasticpipe.org This Technical Note, TN-30, was first issued in January 2006 and was revised and republished in September 20
7、13. 105 Decker Court, Suite 825, Irving, TX 75062P: 469-499-1044F: 469-499-1063www.plasticpipe.org TN-30 Requirements for the use of Rework Materials in Polyethylene Gas Pipe 1.0 SCOPE AND PURPOSE This technical note offers guidance and requirements for polyethylene gas pipe manufacturers and provid
8、es criteria for evaluation of manufacturers by purchasers of polyethylene gas pipe, with respect to the use of rework of polyethylene materials in the manufacture of ASTM D 2513 polyethylene gas pipe. These requirements address the cleanliness of rework polyethylene materials used in the manufacture
9、 of ASTM D 2513 polyethylene gas pipe to ensure that the use of rework does not compromise pipe quality. The user should consult Title 49CFR Part 192 for the current referenced edition of ASTM D 2513. 2.0 INTRODUCTION The requirements in this technical note are designed to ensure the responsible use
10、 of rework materials and to ensure compliance with ASTM D 2513. In general, the requirements contained in this document reflect good rework inventory controls, good housekeeping, good manufacturing practices and good record keeping procedures. This technical note addresses only the extrusion process
11、 for pipe or tubing from polyethylene materials that are identified in ASTM D 2513, Annex A1. It does not address rework for other piping materials that are identified in ASTM D 2513. These requirements shall be used to determine if polyethylene gas pipe is produced in facilities that have appropria
12、te procedures for controlling the use of rework materials. A manufacturer shall be evaluated with respect to whether they comply with the rework material requirements of this technical note, ASTM D 2513, product quality, and customer expectations. 3.0 REQUIREMENTS FOR REWORK MATERIALS In meeting AST
13、M D 2513 requirements, rework, sometimes called regrind, shall have specific characteristics: 3.1 Rework shall be clean A manufacturer shall have a documented procedure governing the use of rework materials. At a minimum, there shall be written procedures and instructions for the responsible use of
14、rework in a manufacturers production process. Rework processes and procedures shall be designed to maintain virgin and rework material cleanliness, to avoid introducing contamination, and to remove inadvertently introduced contamination. 3.2 Rework shall be equal to or better than the material desig
15、nation of the virgin material with which it is used Rework processes and procedures, shall ensure that the source of rework material is from material with the same or higher PPI listed Hydrostatic Design Stress (HDS) at 73F and have the same or higher elevated temperature HDB at 140F, as the virgin
16、material with which it is used (e.g. PE4710 can be used with PE4708, but PE4708 cannot be used with PE4710). 3.3 Rework shall be generated in the manufacturers own production Rework materials must originate in the manufacturers own pipe1production facilities. A manufacturer may transfer rework among
17、 its own facilities provided it is managed in accordance with these requirements and is properly labeled and documented. Materials from other outside sources are prohibited. 3.4 Pipe that is not suitable for use as rework In addition to the above, rework pipes having any of the following conditions
18、should not be used: Unknown thermal history Prolonged barrel residence time Excessive melt temperature that may cause degradation contamination be identified Non-black polyethylene pipe stored outdoors for over two years from date of manufacture is not suitable for use as a rework Rework pipe that c
19、annot be cleaned is not suitable for use as rework Processed rework materials that becomes contaminated and cannot be adequately cleaned shall not be used 4.0 SOURCES OF REWORK During the manufacturing process, there are several circumstances that result in the generation of pipe that is not directl
20、y saleable but is otherwise suitable for use as rework. Examples include: Startup Samples for quality control and quality assurance Production changeovers Service interruptions Unintentional errors and cosmetically damaged goods 1Some pipe manufacturers may have production operations for polyethylen
21、e piping products such as molded or fabricated fittings or feedstock for piping fabrications. The term “pipe” as used herein is inclusive of pipe and these piping product operations. 5.0 THE REWORK PROCESS The documented rework procedure shall be designed to assure that contamination is not introduc
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- PPITN302013REQUIREMENTSFORTHEUSEOFREWORKMATERIALSINMANUFACTURINGOFPOLYETHYLENEGASPIPEPDF

链接地址:http://www.mydoc123.com/p-1016781.html