1、*USACE / NAVFAC / AFCESA / NASA UFGS-07 51 13 (May 2012)-Preparing Activity: NAVFAC SupersedingUFGS-07 51 13 (February 2012)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2012SECTION TABLE OF CONTENTSDIVISION 07 - THERMAL AND MOISTURE PROTECTIONSECTION 07 51
2、 13BUILT-UP ASPHALT ROOFING05/12PART 1 GENERAL1.1 REFERENCES1.2 DESCRIPTION OF ROOF MEMBRANE SYSTEMS1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1 Qualifications of Applicator1.4.2 Qualifications of Photovoltaics (PV) Rooftop Applicator1.4.3 Fire Resistance1.4.4 Wind Uplift Resistance1.4.5 Preroofing Conf
3、erence1.5 DELIVERY, STORAGE, AND HANDLING1.5.1 Delivery1.5.2 Storage1.5.3 Handling1.6 ENVIRONMENTAL CONDITIONS1.7 SEQUENCING1.8 WARRANTY1.8.1 Roof Membrane Manufacturer Warranty1.8.2 Roofing System Installer Warranty1.8.3 Continuance of Warranty1.9 CONFORMANCE AND COMPATIBILITY1.10 ELIMINATION, PREV
4、ENTION OR CONTROL OF FALL HAZARDS1.10.1 Fall Protection1.11 COOL ROOFS1.12 SUSTAINABILITY REQUIREMENTS1.12.1 Recycled Materials1.12.2 Local/Regional MaterialsPART 2 PRODUCTS2.1 GENERAL2.2 FIBERGLASS FELT MATERIALS2.3 BASE FLASHING MEMBRANE2.4 ASPHALT2.5 SURFACING MATERIAL2.5.1 Aggregate for Surfacin
5、g Built-up RoofingSECTION 07 51 13 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS2.5.2 Granule Surface Modified Bitumen Cap Sheet2.6 PRIMER2.7 ASPHALT ROOF CEMENT2.8 CANT STRIPS2.9 UNSATURATED FELT OR ROSIN-SIZED BUILDING PAPER2.10 FASTENERS AND P
6、LATES2.10.1 Wood Substrates and Nailers2.10.2 Masonry or Concrete Walls and Vertical Surfaces2.10.3 Metal Plates2.11 PRE-MANUFACTURED ACCESSORIES2.11.1 Pre-fabricated Curbs2.11.2 Photovoltaic (PV) Systems - Rack Mounted Systems2.12 WALKPADS2.12.1 ROOF WALKWAYS2.13 PAVER BLOCKS2.14 ROOF INSULATION BE
7、LOW MEMBRANE SYSTEM2.15 MEMBRANE LINERPART 3 EXECUTION3.1 VERIFICATION OF CONDITIONS3.1.1 Summary Of Minimum Material Weights (Per 10 sq meter 100 sq ft)3.2 PREPARATION3.2.1 Protection of Property3.2.1.1 Protective Coverings3.2.1.2 Bitumen Stops3.2.2 Equipment3.2.2.1 Mechanical Application Devices3.
8、2.2.2 Flame-Heated Equipment3.2.2.3 Open Flame Application Equipment3.2.3 Priming of Surfaces3.2.3.1 Priming of Concrete and Masonry Surfaces3.2.3.2 Priming of Metal Surfaces3.2.4 Covering of Wood Substrate3.2.5 Heating of Asphalt3.2.5.1 Temperature Limitations for Asphalt3.3 APPLICATION3.3.1 Phased
9、 Membrane Construction3.3.2 Temporary Roofing and Flashing3.3.2.1 Removal3.3.3 Base Sheet Application - General3.3.3.1 Ventilating Base Sheets3.3.4 Ply Felts3.3.4.1 Hot-Mopping of Ply Felts3.3.4.2 Backnailing of Ply Felts3.3.4.3 Valleys and Ridges3.3.5 Membrane Flashing3.3.5.1 Strip Flashing3.3.5.2
10、Membrane Flashing at Roof Drain3.3.5.3 Pre-fabricated Curbs3.3.5.4 Set-On Accessories3.3.5.5 Lightning Protection3.3.6 Roof Walkpads3.3.7 Elevated Metal Walkways and Platforms3.3.8 Paver Blocks3.3.9 Aggregate Surfacing3.3.10 Granule-Surfaced Modified Bitumen Cap Sheet3.3.10.1 Backnailing of Cap Shee
11、t Membrane3.3.11 Correction of DeficienciesSECTION 07 51 13 Page 2Provided by IHSNot for Resale-,-,-3.3.12 Clean Up3.4 PROTECTION OF APPLIED ROOFING3.4.1 Protection Against Moisture Absorption3.4.2 Water Cutoffs3.4.3 Temporary Flashing for Permanent Roofing3.4.4 Temporary Walkways, Runways, and Plat
12、forms3.4.5 Glaze Coat3.5 FIELD QUALITY CONTROL3.5.1 Test for Surface Dryness3.5.2 Construction Monitoring3.5.2.1 Manufacturers Inspection3.5.3 Samples of Built-Up Roofing3.5.3.1 Number of Cut Tests3.5.3.2 Sample Cutting Device3.5.3.3 Patching Cut-Out Area3.5.4 Roof Drain Test3.6 INFRARED INSPECTION3
13、.7 INFORMATION CARD- End of Section Table of Contents -SECTION 07 51 13 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS*USACE / NAVFAC / AFCESA / NASA UFGS-07 51 13 (May 2012)-Preparing Activity: NAVFAC SupersedingUFGS-07 51 13 (February 2012)UNIFI
14、ED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2012SECTION 07 51 13BUILT-UP ASPHALT ROOFING05/12*NOTE: This guide specification covers the requirements for aggregate surfaced bituminous built-up roofing, and built-up roofing with granule-surfaced modified bitumen
15、 cap sheet for existing and new roof systems on slopes from 6 mm to 76 mm 1/4 inch to 3 inches per foot.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specifi
16、cation for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and reco
17、mmended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*NOTE: The requirements for hot-mopped, four-ply, aggregate surfaced, built-up bituminous roofing systems and built-up bituminous roof systems consisting of three-ply felts and granule
18、-surfaced modified bitumen cap sheet are included in this guide specification. This guide specification does not include the structural roof deck, insulation, or sheet metal fascias, gravel stops, and flashings.Coordinate this section with other roof system components specifications such as rough ca
19、rpentry, insulation and sheet metal flashing. Also coordinate this section with the criteria contained in UFC 3-110-03 “Roofing“, as it relates to the specific project and Service Exceptions indicated therein.SECTION 07 51 13 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted
20、 without license from IHSNOTE: In most cases, aggregate surfacing or granule surfaced modified bitumen cap sheet surfacing should be used in lieu of smooth surfaced built-up roofs. Generally, when properly applied and maintained, aggregate surfaced roofing will have greater life expectancy. Granulat
21、ed cap sheet surfacing should be considered where:1. There is danger of aggregate being drawn into air intakes of jet aircraft.2. There is danger of wind blown aggregate jeopardizing property and life safety.*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in
22、 the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to au
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS0751132012BUILTUPASPHALTROOFING 组合 沥青 屋面 PDF

链接地址:http://www.mydoc123.com/p-984727.html