NAVY UFGS-07 24 00-2011 EXTERIOR INSULATION AND FINISH SYSTEMS《外部绝缘和外绝缘系统》.pdf
《NAVY UFGS-07 24 00-2011 EXTERIOR INSULATION AND FINISH SYSTEMS《外部绝缘和外绝缘系统》.pdf》由会员分享,可在线阅读,更多相关《NAVY UFGS-07 24 00-2011 EXTERIOR INSULATION AND FINISH SYSTEMS《外部绝缘和外绝缘系统》.pdf(27页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA UFGS-07 24 00 (May 2011)-Preparing Activity: NAVFAC SupersedingUFGS-07 24 00 (August 2008)UFGS-07 24 00 (July 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONReferences are in agreement with UMRL dated April 2011*SECTION TABLE OF CONTENTSDIVISION 07 - THERMAL AND MOISTURE PROTEC
2、TIONSECTION 07 24 00EXTERIOR INSULATION AND FINISH SYSTEMS05/11PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION AND REQUIREMENTS1.2.1 System Requirements and Tests1.2.1.1 Water Penetration1.2.1.2 Wind Load1.2.1.3 Full scale or intermediate scale fire test1.2.1.4 Mock-Up Installation of EIFS1.2.2 C
3、omponent Requirements and Tests1.2.2.1 Surface Burning Characteristics1.2.2.2 Radiant Heat1.2.2.3 Impact Resistance1.2.3 Sub-Component Requirements and Tests1.2.3.1 Abrasion Resistance1.2.3.2 Accelerated Weathering1.2.3.3 Mildew Resistance1.2.3.4 Salt Spray Resistance1.2.3.5 Water Resistance1.2.3.6
4、Absorption-Freeze/Thaw1.2.3.7 Sample Boards1.2.4 Moisture Analysis1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1 Qualifications of EIFS Manufacturer1.4.2 Qualification of EIFS Installer1.4.3 Qualification of Sealant Applicator1.4.4 Qualifications of Third Party Inspector1.4.5 Insulation Board-1.4.6 Pre-In
5、stallation Conference1.5 DELIVERY AND STORAGE1.6 ENVIRONMENTAL CONDITIONS1.7 WARRANTYPART 2 PRODUCTSSECTION 07 24 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.1 COMPATIBILITY2.2 SHEATHING BOARD2.2.1 Fiber Reinforced Cement Sheathing Boa
6、rd2.2.2 Glass Mat Gypsum Sheathing Board2.3 ADHESIVE2.4 LATHING AND FURRING2.5 MECHANICAL FASTENERS2.6 THERMAL INSULATION2.6.1 Manufacturers Recommendations2.6.2 Insulation Board2.7 BASE COAT2.8 PORTLAND CEMENT2.9 REINFORCING FABRIC2.10 FINISH COAT2.11 SEALANT PRIMER2.12 ACCESSORIES2.13 JOINT SEALAN
7、T2.14 BOND BREAKER2.15 BACKER RODPART 3 EXECUTION3.1 EXAMINATION3.2 SURFACE PREPARATION3.3 INSTALLATION3.3.1 Sheathing Board3.3.2 Insulation Board3.3.2.1 Mechanically Fastened Insulation Boards3.3.2.2 Adhesively Fastened Insulation Boards3.3.3 Base Coat and Reinforcing Fabric Mesh,3.3.3.1 Class PB S
8、ystems3.3.3.2 Class PM Systems3.3.4 Finish Coat3.4 JOINT SEALING3.4.1 Surface Preparation, Backer Rod, and Primer3.4.2 Sealant3.5 FIELD QUALITY CONTROL3.5.1 Third Party Inspection3.5.2 Inspection Check List3.6 CLEANUP- End of Section Table of Contents -SECTION 07 24 00 Page 2Provided by IHSNot for R
9、esaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA UFGS-07 24 00 (May 2011)-Preparing Activity: NAVFAC SupersedingUFGS-07 24 00 (August 2008)UFGS-07 24 00 (July 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONReferences are in agreement with UMRL dated Apr
10、il 2011*SECTION 07 24 00EXTERIOR INSULATION AND FINISH SYSTEMS05/11*NOTE: This guide specification covers the requirements for barrier-type and drainable exterior insulation and finish systems (EIFS), Classes PB and PM, which may be applied to concrete or brick masonry, or to wood or metal frame con
11、struction. EIFS are exterior finish systems that include an integral layer of thermal insulation.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification
12、for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended
13、 changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*NOTE: Do not specify EIFS for areas below grade or in areas subject to abuse by moving vehicles or equipment, such as a loading dock. Avoid the use of EIFS in expected heavy pedestrian traff
14、ic areas. If such use can not be avoided, select an appropriate high-impact resistant system. Avoid exposure of EIFS to standing water or prolonged contact with snow. Do not specify EIFS for other than vertical surfaces, except narrow ledges and window sills where the minimum slope is 25 mm in 50 mm
15、 one inch in 2 inch. Flashing is required at parapet caps.For EIFS directly applied over existing substrate SECTION 07 24 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-(brick, concrete), specify preparation of substrate in this section. Fo
16、r EIFS installed over new substrate, specify preparation of substrate under applicable section(s). Substrate must be sound, true, plumb, and within flatness tolerance of EIFS manufacturer, usually not more than 6 mm within 3000 mm 1/4 inch within 10 feet. If existing substrate can not be brought up
17、to these requirements, a new substrate should be provided.For EIFS installed over new sheathing board, provide sheathing in this section. If sheathing is to be installed on metal furring or studs, provide furring or studs in Section 05 40 00 COLD-FORMED METAL FRAMING, specifying EIFS manufacturers t
18、olerance requirements.In marine environments, light gage metal framing is subject to corrosion if water infiltrating through the EIFS is allowed to accumulate in runners. In locations near salt water, do not use metal framing for the support of the substrate or detail carefully to prevent water accu
19、mulation.*NOTE: The coordination of work with other trades is important for the performance of the the EIFS wall assembly, in particular the installation of flashing above windows and door heads, beneath window and door sills, at roof/wall intersections, decks, intersection of lower walls with highe
20、r ones, above projecting features, and at the base of the wall to ensure that where water is likely to penetrate the wall assembly, it will be drained to the exterior at the source of the leak. *NOTE: EIFS provides insulation and exterior finish for both new and renovated buildings. The systems are
21、available in two classes: PB and PM. a. Class PB Systems are typically composed of a 2 mm to 6 mm 1/16 inch to 1/4 inch cementitious or non-cementitious base coat, one or more layers of polymer-coated glass fiber mesh, and a non-cementitious finish coat. PB systems are most commonly used over molded
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS0724002011EXTERIORINSULATIONANDFINISHSYSTEMS 外部 绝缘 系统 PDF

链接地址:http://www.mydoc123.com/p-984722.html