NAVY MIL-R-81965 A-1976 RACK BOMB AIRCRAFT BRU-14 AND BRU-15 SERIES《BRU-14及 BRU-15系列飞机炸弹机架》.pdf
《NAVY MIL-R-81965 A-1976 RACK BOMB AIRCRAFT BRU-14 AND BRU-15 SERIES《BRU-14及 BRU-15系列飞机炸弹机架》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-R-81965 A-1976 RACK BOMB AIRCRAFT BRU-14 AND BRU-15 SERIES《BRU-14及 BRU-15系列飞机炸弹机架》.pdf(22页珍藏版)》请在麦多课文档分享上搜索。
1、ML-R-BL965A LO = 7799906 036017Z B W MI L-R-8 1 965 A (AS) Superseding 11 March 1974 MIL-R-8 1965(AS) n ILITARY SPECIFIC, TION RACK, BOMB, AIRCRAFT; BRU-14 AND BRU-15 SERIES This specification is approved for use by the Naval Air Systems Command, Department of the Navy, and is available for use by a
2、li Departments and Agencies of the Department of Defense. 1. SCOPE AND CLASSIFICATION 1.1 Scope. This specification covers two types of bomb racks capable of carrying and releasing stores having suspension lugs spaced 14 inches (35.56 centimeters) apart and weighing up to 2,200 pounds (997.90 kilogr
3、ams). The test limits in this specification define minimum acceptable capabilities. 1.2 Classification. Bomb racks covered by this specification shall be of the following types: Type I BRU-l4/A Bomb Rack Type II BRU-lS/A Bomb Rack 2. APPLICABLE DOCUMENTS 2.1 Issues of docume General Specification fo
4、r Hooks, Bomb Rack, Generar Specification for F - .- - - - Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-R-81966A (AS) STANDARDS MIL-STD-100 MIL-STD-129 MIL-STD-130 MIL-STD-143 MIL-STD-46 I MIL-STD-462 MIL-STD-704 MI L-STD-794 MIL-STD-831 MS33
5、14 Engineering Drawing Practices Marking for Shipment and Storage Identification Marking of U.S. Military Property Specifications and Standards, Order of Precedence for the Selection of Electromagnetic Interference Characteristics Requirements for Equipment Military Standard, Electromagnetic Interfe
6、rence Characteristics, Measurement of Electric Power, Aircraft, Characteristics and Utilization of Parts and Equipment, Procedures for Packaging and Packing of Test Reports, Preparation of Lug, Suspension, 1,000 lb. (453.6 Kg.) class, Airborne Equipment DRAWINGS Naval Air Systems Command DL909AS 100
7、 Data List, Test Fixture, BRU-12, 14, 15 and AERO 1A Adapter (Copies of specifications, standards, drawings, and publications required by sup- pliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer.) 2.2 Order
8、 of precedence of specifications and standards. Should a conflict exist between any requirement in this specification and any requirement in the applicable documents referenced herein, the requirements of this specification shall take precedence over the referenced (applicable) document. 3. REQUIREM
9、ENTS .3.1 First article. The bomb racks furnished under this specification shall be a product which has been inspected and passed the first article inspection specified herein (see 4.3). 3.2 Selection of specifications and standards. Specifications and standards for necessary commodities and service
10、s not specified herein shall be selected in accordance with MIL-STD-143. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-/IL-R-B3365A 10 = 7777706 0360354 3 MIL-R-81965A (AS) 3.3 Interchangeability. All parts having the same part number shall be di
11、rectly and com- pletely interchangeable with each other with respect to installation and performance. 3.4 Identification of parts. All parts shall be marked as specified on the drawings listed in the data list for the bomb rack being procured, or in accordance with MIL-STD-130, if not specified on t
12、he drawings, The item identification and part number requirements of MIL-STD-100 shall govern the part number and changesthereto. 3.6 Bomb rack. 3.6.1 Construction. The construction of the bomb rack shall be in accordance with the drawings listed in the data list for the bomb rack being procured and
13、 as Specified herein (see 6.2.lg). 3.6.2 Performance. The bomb racks shall satisfy all performance requirements when sub- jected to the following inspections in the order specified in Tables I and II. a. b. C. d. e. f. g. h. 1. j. k. 1. m. n. O. P. 9. 3.6 Electromechanical Component Inspection (4.6.
14、1) Bomb Rack Inspection (4.6.2) Functional Test (4.6.3) Arming Mechanism (4.6.4) Electromagnetic Compatibility (4.6.5) Secondary Systems (4.6.6) Manual Operation (4.6.7a) Electrical Characteristics (4.6.7b) Lag Determination (4.6.7) High-g Release (4.6.7d) Sand (4.6.7e) . Salt Spray (4.6.70 Shock Te
15、st (4.6.73) Vibration Test (4.6.7h) Life Test (4.6.71) Static Test (4.6.7j) Lock Shut Firing (Type I only) (4.6.8) Bomb rack hooks. The construction and inspection of the bomb rack hooks shall be in accordance with MIL-H-85042. 3.7 . Workmanship. The workmanship displayed in fabrication and assembly
16、 of the bomb racks shall be such as to assure, within design limitations, the ability of the bomb racks to meet their performance requirements under all applicable environmental conditions specified herein. Unauthorized repair, welding, heavy burrs, or parts assembled by introduction of high stresse
17、s not prescribed in the drawings, are typical signs of inferior workmanship and shall be cause for rejection. The standards of 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NIL-R-LSb5A 20 m 777390b 03bO255 3 W - MIL-R-81965A (AS) workmanship exhi
18、bited in the approved first article sampfe, subject to any qualification stated in the governments notice of approval, shall be determinative of the requirements of the contract relative to workmanship. 4. QUALITY ASSURANCE PROVISIONS (see 6.4) 4.1 Responsibility for inspection. Unless otherwise spe
19、cified in the contract, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified he
20、rein, unless disapproved by the government. The government reserves the right to perform any of the inspections set forth in the specification, where such inspections are deemed necessary to assure that the supplies and services conform to prescribed requirements. 4.2 Classification of inspection. T
21、he inspection of the bomb racks shall be classified as -follows: a. b. First article inspection (see 4.3) Quality conformance inspection (see 4.4) 4.3 First article inspection. First article inspect.m shall consist of all of the inspections listed in Table I. First article inspection report format s
22、hall be in accordance with MIL-STD-831 (see 6.3). 4.3.1 Sampling for first article inspection. First article bomb rack samples shall consist of the first two bomb racks manufactured on contract. The bomb racks shall be permanently labeled A and B for ease of identification. Failure of the bomb racks
23、 to pass any of the first article inspections shall be cause for rejection (see 6.3). 4.4 Qualip conformance inspection. Quality conformance inspection shall consist of the following inspections: a. Individual Inspections (see 4.4.1) b. Sampling Inspections (see 4.4.2) Quality conformance inspection
24、 report format shall be in accordance with MIL-STD-83 1 (see 6.3). .- 4.4.1 Individual inspections. Individual inspections are those inspections conducted on each bomb rack. Individual inspections for the bomb racks are shown in Table II, Group 1. Failure to pass any of these inspections shall be ca
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILR81965A1976RACKBOMBAIRCRAFTBRU14ANDBRU15SERIESBRU14 BRU15 系列 飞机 炸弹 机架 PDF

链接地址:http://www.mydoc123.com/p-981404.html