NAVY MIL-E-24652 (1)-1986 EXTINGUISHER FIRE AQUEOUS FILM FORMING FOAM (AFFF) 2-1 2 GALLON《水薄膜形成泡沫2-1 2加仑灭火器》.pdf
《NAVY MIL-E-24652 (1)-1986 EXTINGUISHER FIRE AQUEOUS FILM FORMING FOAM (AFFF) 2-1 2 GALLON《水薄膜形成泡沫2-1 2加仑灭火器》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-E-24652 (1)-1986 EXTINGUISHER FIRE AQUEOUS FILM FORMING FOAM (AFFF) 2-1 2 GALLON《水薄膜形成泡沫2-1 2加仑灭火器》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-E-2qb52 (1) LI2 7777706 0232770 O . 5-13 - Add: “FED-STD-595 - Colors“. 2.1.1, under STANDARDS, MILITARY; Add: “DOD-STD-100 - Engineering Drawing Practices . PAGE 3 3.1: Delete and substitute: - CL- “3.1 First article. When specified in the contract or purchase order, a sample shall be subjected
2、 to first article inspection (see 4.2 and 6.3).“ 3.2.1: Delete and substitute: “3.2.1 Finish. The shell shall be finished with a red enamel protective coating such as polyester or polyurethane, for identification and enhanced corrosion resistance. dance with FED-STD-595.“ The coating shall be color
3、no. 11105 red gloss in accor- AMSC N/A FSC 4210 DISTRIBUTION STATEMENT A Approved for public release; distribution unlimited 1 of 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-E-29652 (3) 92 m 7797706 0232773 2 m MIL-E-24652(SH) AMENDMENT 1 P
4、AGE 7 Add as paragraph 3.10: “3.10 Drawings. When specified in the contract or order, drawings shall be prepared in accordance with DOD-STD-100 (see 6.2.2): Add as new paragraph 4.1.1: “4.1.1 Responsibility for compliance. All items must meet all require- ments of sections 3 and 5. The inspection se
5、t forth in this specification shall become a part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of assuring that all products or supplies submitted to the Governm
6、ent for acceptance comply with all requirements of the contract. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, nor does it commit the Government to acceptance of defective material.“ PAGE 8 4.3.1: Delete in its entirety. 4.4: D
7、elete and substitute: “4.4 Quality conformance inspection. Quality conformance inspection shall e,-. consist of the examination of 4.5.“ - PAGE 9 4.6.2.1, line 9: Delete “Fialure“ and substitute “Failure.“ 6.2.2: Delete and substitute: “6.2.2 Data requirements. When this specification is used in an
8、acquisi- tion and data are required to be delivered, the data requirements identified below shall be developed as specified by an approved Data Item Description (DD Form 1664) and delivered in accordance with the approved Contract Data Require- ments List (CDRL), incorporated into the contract. When
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILE2465211986EXTINGUISHERFIREAQUEOUSFILMFORMINGFOAMAFFF212GALLON 薄膜 形成 泡沫 212 加仑 灭火器 PDF

链接地址:http://www.mydoc123.com/p-979027.html