NAVY MIL-C-6026 B-1959 CONTROL UNIT PRESSURE GENERATING MANUALLY OPERATED AIRCRAFT HYDRAULIC BRAKE SYSTEM《飞机的液压刹车系统手动操作压力发电机控制单元》.pdf
《NAVY MIL-C-6026 B-1959 CONTROL UNIT PRESSURE GENERATING MANUALLY OPERATED AIRCRAFT HYDRAULIC BRAKE SYSTEM《飞机的液压刹车系统手动操作压力发电机控制单元》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-C-6026 B-1959 CONTROL UNIT PRESSURE GENERATING MANUALLY OPERATED AIRCRAFT HYDRAULIC BRAKE SYSTEM《飞机的液压刹车系统手动操作压力发电机控制单元》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、. . . . . . flIL-C-bO268 3b W 77777Ob O385330 3 9 . . . . . . . . MILITARY SPECIFICATION . -. . .-. . I , ._ .- - , . . ,.-. . . . .- . . . . 4 .l. ( . . “-.* . . - - . .- . . . _l-llll-.-I -. _ * _._.i I /- -y M Gen- eral Tests for. MIL-H-5606 - H y d r a u 1 i c Fluid, Petroleum B a s e, Aircraft
2、and Ordn- ance. S J- s t e m s , W he e 1, Aircraft, Design of. MIGB-8584 - Brake MIGA4625 - Anodic-Coatings, for Aluminum and Alu- minum Alloys. MIL-A-8629 - Airplane 8tr e% g t h and Rigidity. MIL-H-8775 - Hydraulic S y s t e m Components, Air- craft, General Spec- ification for. STANDARDS MILITAR
3、Y KL-STD-105 - Sampling Procedures and Tables for In- spection by Attri- butes. MIL-STD-129 - Marking f o r Ship- ment and Storage. (Copies of specifications, standards, drawings, and publications required by contractors in connection with spwific procurement funcons should be ob- tained from the pr
4、ocuring activity or as directed by the contracting officer.) 3. REQUIREMENTS 3.1 Preproduction sample. Prior to begin- ning quantity production, preproduction samples shall be subjected to preproduction testing. The preproduction sample shall be ir , ZI p e. Provided by IHSNot for ResaleNo reproduct
5、ion or networking permitted without license from IHS-,-,-MIL-C-6026B lb 7797706 018531l 3 MILG6026B produced by the same method and of the same material that will be used for quantity production of the item. 3.2 General. The requirements of specifi- cation MIGH-8775 apply as a requirements of this s
6、pecification with the exceptions and additions specified herein. When the two specifications conflict, this specifidion shall govern. 3.3 Design and construction. Design of control units for manually operated hydrau- lic brake systems shall consist of a mechanic- ally actuated hydraulic power genera
7、tor. The incorporation into the unit of a re- servoir to maintain a reserve supply of fluid shall be optional. This unit shall be operable by the pilots brake pedal, and it shall conform to the applicable requirements of Specification MIL-B-8584. 3.3.1 Operation tempwatures. The control units shall
8、be designed and constructed for operation at temperatures of from -54O to 71OC. (45O to 160OF.). 3.3.2 Operating pressure. Normal oper- ating pressure shall be that pressure re- quired to lock the wheels of the airplane, assuming a coefficient of friction of 0.31 be- tween the tires and the ground.
9、Maximum operating pressure shall be that pressure required to lock the wheels of the airplane, assuming a static coefficient o friction of 0.55 between the tires and the ground. 3.3.3 Pumping. Control units shall be de- signed to permit “pumping up” of the hydrau- lic pressure in a brake system wher
10、e the control unit travel to operate the brake may become greater than the travel normally re- quired, such as in the case of% failed pack- ing in the unit, or a leak in the brake sys- tem. It shall also serve to facilitate bleeding of air from the brake system and maintain- ing an airfree system. T
11、he pumping valve shall remain sealed at all times during the operating stroke of the unit, but shall be designed to open immediately at any time when the brake line hydraulic pressure may become appreciably less than the reservoir . pressure. Pressure drop through the valve during pumping shall be s
12、ufficiently low to assure complianee with the pumping test Specified in 4.8.3. 3.3.3.1 Return mechanhm. A means shall be provided within the unit to return the pressure generator to its relaxed position upon release of the actuating force. The return rate shall be sufficiently rapid to provide a pre
13、ssure drop in the unit enough greater than that in the brake system to assure a buildup to the required pressure within the required number of pumping strokes when tested as specified in 4.8.3. 3.3.4 Bleeding. Provisions shall be made in the design of the control unit in order that the pumping valve
14、 is mechanically unseated and remains open when the unit is in the relaxed position with no mechanical force applied. 3.3.5 Structurai strength. The structural stren.gth of the control units shall be such that no part of the unit or its mounting shall give evidence of failure under the maxi- mum imp
15、osed mechanical operating loads, or wrench torque loads required for making connections. Operating load strengths shall be as specified in Specification MIGA-8629. 3.4 Performance. The control nit shall satisfy the performance requirements speci- fied in Section 4 when subjected to the fol- lowing t
16、ests: (a) Immersion (4.8.2). (b) Pumping (4.8.3). (c) Elevated temperature cycling (4.8.4) . (d) Cold temperature cycling (4.8.6). (e) Life (4.8.6). (f) Proof pressure and leakage (4.8.7). (9) Efficiency (4.8.7.3). (h) Burst pressure (4.8.8). 3.5 Marking. All ports for tube connections shall be clea
17、rly and permanently marked to indicate the proper connections to be made. , , . I . -. . . . - . 1 . 1 -1 -. . . . ! . 1 A . .-. ! . _.- .- . 7.: . . . -. . . . . . . .- . ._ . . . . . . . ”._ . . . . . . . . . . Provided by IHSNot for ResaleNo reproduction or networking permitted without license fr
18、om IHS-,-,-. MIL-C-60268 26 7779906 OL53L2 5 .: . . . . . . . . . . I . . . . . . 1 , . . 1 I . Y .I . . -. , . . 1 . I ._ 4 . - . - _._._.” . . -. . - . . r . -: - . . I - -.- . -., .-._ .- -.- . - .- . . .-.-.-. I.-.- -., -_ . . . _. - . _._ _._-_ . ., . , . . I . . . . - . .- - . i . 1 4. QUALITY
19、 ASSURANCE PROVISIONS 4.1 Unless otherwise specified herein? the supplier is responsible for the performance of all inspection requirements prior to sub- mission for Government inspection and ac- ceptance. Except as otherwise specified? the supplier may utilize his own facilities or any commercial l
20、aboratory acceptable to the Gov- ernment. Inspection records of the examina- tions and tests shall be kept camplete and available to the Government as specified in the contract or order. 4.2 The quality assurance provisions of Specification MIGH-8775 shall apply as quality assurance provisions of th
21、e specifica- tion with the exceptions and additions spec- ified herein. When the two specifications con- flict, this specification shall govern. 4.3 Classification of tests. The inspection and testing of control units shall be classified as follows: (a) Preproduction tests (4.4). (b) Acceptance test
22、s (4.5). 4.4 Preproduction tests. 4.4.1 One sample test unit of a new design shall be made with critical fits within 10 percent of the minimum allowed clearances specified by the detail drawing tolerances and with maximum squeeze piston and rod packings. This unit shall be used for the elevated temp
23、erature cycling test and the cold temperature cycling test, as specified in 4.8.4 and 4.8.5, respectively. 4.4.2 The second sample unit shall be made with critical fits within 10 percent of the maximum allowed clearances specified by the detail drawing tolerances. It shall also have maximum squeeze
24、piston and rod packings. It shall be subjected to the Life test (4.8.6) 3nd all other tests required by this specifi- cation? as described under 4.8. 4.4.3 Tests. The preproduction tests of brake control units shall consist of all he RIIL-C-6026B tests of this specification as described under 4.8. .
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILC6026B1959CONTROLUNITPRESSUREGENERATINGMANUALLYOPERATEDAIRCRAFTHYDRAULICBRAKESYSTEM 飞机 液压 刹车 系统

链接地址:http://www.mydoc123.com/p-977881.html