NAVY MIL-B-23360 B-1970 BOMB INCENDIARY TH3 4 POUND M126《M1264英磅TH3燃烧弹炸弹》.pdf
《NAVY MIL-B-23360 B-1970 BOMB INCENDIARY TH3 4 POUND M126《M1264英磅TH3燃烧弹炸弹》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-B-23360 B-1970 BOMB INCENDIARY TH3 4 POUND M126《M1264英磅TH3燃烧弹炸弹》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、I* _I I 4 : -. *. I . :. I VIL-B-23360B i. *I * *. -: : .I 30 Anril 1970 SUPERSEDING 20 February 196s IFITERIM AMENDMENT 3( MU) 1 April 1969 .I . -. -$*. * / -e- ._ VIL-B-23360A i. MILITARY SPECIFICATION BOMB, INCENDIARY. TH3, 4-POUND, F126 This specification is mandatory for use by all De- partment
2、s and Agencies of the Department of Defense. 1. SCOPE 1.1 This specification covers the filling and assembly of the M726 incendiary bomb, 2. APPLICABLE DQCUYENTS 2.1 The following documents of the issue in effect on date of invitation for bids or request for proposal, form a part of this specificati
3、on to the extent specified herein. STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables for Insnection by * MIL-STD-129 - Marking for Shipment and Storage. MIL-STD-1168 - Lot Numbering of Ammunition. DRANINGS Attributes. US ARYY MUNITIONS COMMAND EDGEWOOD ARSENAL DL14-5-3018 - Bomb, Incen
4、diary, 4 Pound, TH3, M120. IDL14-5-3018 - Bomb Incendairy, 4 Pound, TH3, M126, Inspection Data List. FSC 1325 THIS DOCUMENT CONTAINS PAGES, Licensed by Information Handling ServicesMIL-B-233bOB 13 77777Ob 0303332 O W MIL-B-233606 (Copies of specifications standards, drawings, and puhlicatians reqiii
5、red by suppliers in connection with specific procurement functions should be obtained from the procurins activity or ar directed by the contractinq off i Cer. ) 3. REQUIREMENTS 3.1 Naterial s and components. 3.1.1 Materials. All materials cited on Drawing DL14-5-3018 or on the subsidiarfir-s shall c
6、onform to the specifications thereon, or to the speci f i c characteristics set forth on the drawi nqs . 3.1 .2 Com onents . Al 1 components chal 1 conform to the specification& and drawings re- isted on Drawing DL14-5-3018 and subsidiary drawings. 3.2 Filling and assembly. 3.2.1 Filling. (see 6.2).
7、 (a) Main charqe. The bomb shall be filled with thennate TH3 as specified on Drawing 07a-5-3018. The themate shall be consolidated in no less than 3 approximately eaual increments under a minimum dead load of 6500 pounds and a maximun of 7500 pounds dead load. be maintained for a minimum of 3 second
8、s for each increment. The ram used for the consolidation of all increments shall be shaped to give the depres- sion as shown on Drawing 014-5-3018. The dead load shall (See 6.3). (b) First fire mixture. The bomb shall contain 42 to 62 grams of first fire mixture. The mixture shall be consoldiated at
9、 a dead load of 6500 to 7500 pounds, using a ram shaped to form the depression shown on Drawing 014-5-3018. The dead load shall be maintained for 3 to 5 seconds. 3.2.2 Assembly. The bomb shall be assembled in accordance with Drawing D14-5-3018. 3.3 Functioning. The bomb shall function as follows: (a
10、) Primer detonation. (b) Ignition of first-fire mixture. (c) Ignition of thermate (TH3). (d) Complete burning of the magnesium body to full depth of the thermate. 3.3.1 Five foot dro . The bomb shall not function when dropped from a height of-idches and tested as specified in 4.4.4 and 4.4.5. 3.3.2
11、Forty-foot drop. The bomb shall function when dropped from a height of 40 feet - + 3 inches and tested as specified in 4.4.4 and 4.4.5, 2 1 Licensed by Information Handling ServicesMIL-B-233bOB 13 W 7977706 0303333 2 W - - - MI L - B - 2 3360B 3.4 Preproduction. Prior to the start of regular product
12、ion, a pre- production lot of bombs shall be produced in accordance with this specification for examination and test (see 4.3). 3.5 lorkmanship. The bomb shall be free of all foreign matter and damage such as cracks, and deformation which could affect its intended use . 4. QUALITY ASSURANCE PROVISIO
13、NS 4.1 Responsibility for inspection. - 4.1 .l Suppliers responsibility-. Unless otherwise specified in the contract or purchase order, the supplier is responsibie for the perform- ance of all inspection requirements as specified herein. Except as otherwise specified in the contract or order, the su
14、pplier may use his own or any other facilities suitable for the performance of the inspec- ti on requirements specified herein, un1 ess di sapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspection are deemed
15、necessary to assure supplies and services conform to specified requirements. 4.1.2 Objective evidence. The supplier shall provided objective evidence acceptable to the contracting officer that the requirements of 3.1 and section 5 for which specific inspection has not been pro- vided in this specifi
16、cation have been satisfied. 4.2 Classification of inspections. The inspection requirements specified herein are classified as follows: (a) Preproducti on i nspecti on (see 4.3) . (b) Qual ity conformance inspection (see 4.4). 4.3 Preproduction inspection. 4.3.1 - Lot. A preproduction lot of 2000 bom
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILB23360B1970BOMBINCENDIARYTH34POUNDM126M1264 英磅 TH3 燃烧弹 炸弹 PDF

链接地址:http://www.mydoc123.com/p-977224.html