1、*USACE / NAVFAC / AFCESA / NASA UFGS-09 23 82 (May 2010)-Preparing Activity: NASA SupersedingUFGS-09 23 82.00 40 (January 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION TABLE OF CONTENTSDIVISION 09 - FINISHESSECTION 09 23 82FIREPROOF GYPSUM
2、 PLASTERING05/10PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 DELIVERY, HANDLING, AND STORAGE1.4 QUALITY CONTROL1.4.1 Catalog Data1.4.2 Plaster Sample1.4.3 Drawing Requirements1.4.4 Four Hour Fire Rated ConstructionPART 2 PRODUCTS2.1 MATERIALS2.1.1 Fireproof Plaster2.1.2 WaterPART 3 EXECUTION3.1 INS
3、TALLATION3.1.1 General Requirements3.1.2 Application3.2 ACCEPTANCE PROVISIONS- End of Section Table of Contents -SECTION 09 23 82 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-09 23 82 (May 2010)-Preparing
4、 Activity: NASA SupersedingUFGS-09 23 82.00 40 (January 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION 09 23 82FIREPROOF GYPSUM PLASTERING05/10*NOTE: This section covers fire protection applications of specified plaster bases.Edit this guid
5、e specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggesti
6、ons on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Cha
7、nge Request (CCR).*PART 1 GENERAL*NOTE: Associated work found in other sections includes metal framing, furring systems, and metal lath, and standard gypsum plastering applications. Show areas and location of application and installation details on drawings.*1.1 REFERENCES*NOTE: This paragraph is us
8、ed to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.SECTION 09 23 82 Page 2Provided by IHSNot for ResaleNo reproduction or networkin
9、g permitted without license from IHS-,-,-Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.Refe
10、rences not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to wi
11、thin the text by the basic designation only.ASTM INTERNATIONAL (ASTM)ASTM E 119 (2009c) Standard Test Methods for Fire Tests of Building Construction and MaterialsASTM E 84 (2009c) Standard Test Method for Surface Burning Characteristics of Building MaterialsINTERNATIONAL CODE COUNCIL (ICC)ICC IBC (
12、2009; Errata First Printing) International Building Code1.2 SUBMITTALS*NOTE: Review Submittal Description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required f
13、or adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system.
14、Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Code
15、s for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the SECTION 09 23 82 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Distri
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NASAUFGS0923822010FIREPROOFGYPSUMPLASTERING 防火 石膏 工艺 PDF

链接地址:http://www.mydoc123.com/p-836571.html