1、 WORLDWIDE ENGINEERING STANDARDS Test Procedure GMW15079 Extended Stall Test for Assessment of Gear Jams Copyright 2011 General Motors Company All Rights Reserved June 2011 Originating Department: North American Engineering Standards Page 1 of 6 1 Scope Note: Nothing in this standard supercedes appl
2、icable laws and regulations. Note: In the event of conflict between the English and domestic language, the English language shall take precedence. 1.1 Purpose. This specification assesses the robustness of regulator motor gear system against stall loads at High Temperatures by simulating creep effec
3、ts on motor gear drive. 1.2 Foreword. This specification is a comparison test for regulator systems. The voltage and line resistances do not necessarily represent the vehicle electrical architecture. 1.3 Applicability. This procedure applies to all cable-drive regulator systems. 2 References Note: O
4、nly the latest approved standards are applicable unless otherwise specified. 2.1 External Standards/Specifications. None 2.2 GM Standards/Specifications. None 3 Resources 3.1 Facilities. The testing may be performed in any recognized structural/body test lab as long as the following conditions are o
5、bserved: 3.1.1 The test facilities and equipment shall be in good working order and shall have a valid calibration label. 3.1.2 Alternative test facilities and equipment may also be used. However, all measuring variables as specified in this specification shall be determined correctly with respect t
6、o its physical definition. 3.2 Equipment. Testing should be performed using a test fixture. The mounting locations should be identical as that used in a real vehicle. See Appendix A, Figure A1. 3.3 Test Vehicle/Test Piece. Testing must be performed on a new set of regulators and motors. 3.4 Test Tim
7、e. Calendar time: 8 days Test hours: 96 hours test + 96 hours soak Coordination hours: 16 hours (range 2 hours/day) 3.5 Test Required Information. Not applicable. 3.6 Personnel/Skills. Not applicable. 4 Procedure After the regulator has been forced into its Full Up Stall Position by the Motor Stall
8、Force, on a test fixture, it must be able to reverse from its Full Up stalled position with 8.5 V DC or less at the motor terminal (MT). 4.1 Preparation. Ensure that the window regulator is mounted in the same way as in the actual vehicle. The Load cells need to be calibrated before beginning the te
9、st. Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW15079 Copyright 2011 General Motors Company All Rights Reserved June 2011 Page 2 of 6
10、 4.2 Conditions. Use Hard Up Stall unless otherwise specified. 4.2.1 Environmental Conditions. All testing and soak shall be performed at hot 85 2 C unless otherwise specified. 4.2.2 Test Conditions. Deviations from the requirements of this standard shall have been agreed upon. Such requirements sha
11、ll be specified on component drawings, test certificates, reports, etc. 4.3 Instructions. 4.3.1 Break in the regulator by performing the following initial cycles: 4.3.1.1 Cycle the window regulator continuously with 16.0 V at MT until first Thermal Protection Device (TPD) breakdown. 4.3.1.2 Use a st
12、all time of 1 second for up stall and down stall. 4.3.1.3 Let the motor cool to ambient. 4.3.2 Reverse Voltage Test. Apply 6 V DC at MT, in the down direction and raise the voltage in increments of 0.5 V until window regulator lowers (must reverse within 8.5 V DC or less at MT). 4.3.3 Long cycle Tes
13、t. 4.3.3.1 Cycle the motor for 60 Long cycles with 16.0 V at MT. The stall time in the up stall is 12 minutes for each cycle. Stall time at down stall is 1 second. Do not allow any reversal as a result of back drive by shorting motor terminals. 4.3.3.2 At the end of the Final cycle, stop at up stall
14、. Do not allow any reversal as a result of back drive by shorting motor terminals. 4.3.4 Soak for 12 hours at up stall. 4.3.5 Apply 6 V DC at MT, in the down direction and raise the voltage by 0.5 V increments (must reverse with 8.5 V DC or less) until window regulator lowers. 4.3.6 Repeat 4.3.3, 4.
15、3.4, and 4.3.5 until failure (motor does not reverse at 8.5 V or less at MT) or for a maximum of 500 cycles. Following the above test, the window regulator must operate without objectionable noise or bind conditions and must meet performance requirements. 5 Data 5.1 Calculations. Collect data for st
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMWGMW150792011EXTENDEDSTALLTESTFORASSESSMENTOFGEARJAMSISSUE2ENGLISH 齿轮 堵塞 评估 扩展 失速 试验 出版 英文 版本 PDF

链接地址:http://www.mydoc123.com/p-757610.html