FORD WSS-M11P28-D-2016 ADHESION REQUIREMENTS ADHESIVE FOR BONDING EXTERIOR FRONT AND REAR LAMP ASSEMBLIES TO BE USED WITH FORD WSS-M99P1111-A .pdf
《FORD WSS-M11P28-D-2016 ADHESION REQUIREMENTS ADHESIVE FOR BONDING EXTERIOR FRONT AND REAR LAMP ASSEMBLIES TO BE USED WITH FORD WSS-M99P1111-A .pdf》由会员分享,可在线阅读,更多相关《FORD WSS-M11P28-D-2016 ADHESION REQUIREMENTS ADHESIVE FOR BONDING EXTERIOR FRONT AND REAR LAMP ASSEMBLIES TO BE USED WITH FORD WSS-M99P1111-A .pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、 ENGINEERING MATERIAL SPECIFICATION Date Action Revisions Rev. 1 2016 06 08 Revised K.Mueller, NA 2014 01 07 Released R Harris, C McComb, NA Controlled document at www.MATS Copyright 2016, Ford Global Technologies, LLC Page 1 of 7 ADHESION REQUIREMENTS, ADHESIVE FOR WSS-M11P28-D BONDING EXTERIOR FRO
2、NT AND REAR LAMP ASSEMBLIES 1. SCOPE This specification defines the performance requirements for an adhesive or adhesive system suitable for bonding front and rear lighting. 2. APPLICATION This specification was released originally for an adhesive or an adhesive system used to bond lenses to bodies
3、in the construction of lamp assemblies. 2.1 LIMITATIONS 2.1.1 Use of thermoplastic sealers and adhesives are not allowed. 2.1.2 Surface treatment (adhesion promoting CPO primer or plasma fluming) of polypropylene is necessary to achieve adequate bonding. 3. REQUIREMENTS Materials meeting these perfo
4、rmance specifications are identified on the Approved Source List Adhesive bonded lamp assemblies must meet all other exterior lighting system requirements. Initial material approval testing is to be conducted at DV using plaques. PV testing is on full lamp assemblies. See Table 1 for sample sizes an
5、d required testing. 3.1 APPROVED SOURCES This specification is performance based and does not have approved sources. 3.2 CONDITIONING AND TEST CONDITIONS All test values are based on material conditioned for not less than 24 h prior to testing in a controlled environment of 23 +/- 2 C and 50 +/- 5%
6、relative humidity. Testing of the material should occur in the conditioning environment or soon after removal. 3.3 ADHESION STRENGTH LAP SHEAR (ASTM D3163, 12.7 mm/min crosshead speed) The lap shear coupons shall consist of typical production materials. Clean the surfaces to be bonded with a hot, so
7、apy water solution. The soap shall be free rinsing, similar to that used for glassware. After cleaning, the coupons are blown dry and conditioned at 23 +/- 2 C for 24 h to ensure dryness. Dispense an amount of adhesive on to the housing material coupon that will fill a 25 mm overlap with a minimum b
8、ond thickness of 0.76 mm. Shim the interface with 0.76 mm wire or glass beads to maintain the required minimum thickness and overlap. Apply the lens material coupon onto the adhesive/housing coupon and remove any excess adhesive. Maintain proper alignment of the ENGINEERING MATERIAL SPECIFICATION WS
9、S-M11P28-D Copyright 2016, Ford Global Technologies, LLC Page 2 of 7 assemblies during cure. Follow the cure schedule as recommended by the adhesive manufacturer. Include the manufacturers recommended open time and cure schedule in the test report. Note: Proper alignment of the test assembly is crit
10、ical. Every effort should be made to maintain uniform tension across the bond area. Cleavage or peel of the bond area could yield inaccurate results. Evaluate a minimum of three assemblies per condition. Report failure mode (both the lens and housing substrates) and peak load. Min Load, N Failure Mo
11、de (lens and housing) Normal (Condition for 30 minutes at specified temperature prior to test) 3.3.1 Test at 23 +/- 2 C 600 Report 3.3.2 Test at 107 +/- 2 C 450 Report 3.3.3 Test at -30 +/- 1 C 900 Report Exposed (After environmental aging in paragraphs 3.3.4- 3.3.8 condition samples for 24 h at 23
12、+/- 2 C prior to lap shear testing) 3.3.4 Heat Age 700 Report (14 days at 107 +/- 2 C) 3.3.5 Humidity 500 Report (14 days at 38 +/- 1 C and 95-100% R.H ) 3.3.6 Water Immersion 500 Report (14 days, FLTM BI 104-01) 3.3.7 Accelerated Weathering 700 Report (ASTM D7869, 1500 hours) - Preferred or (SAE J2
13、527 (Boro/Boro), 2000 hours) 3.3.8 Thermal Cycle 600 Report (10 cycles, DVO-19766) 1 cycle = 2 h at 50 C Ramp to -40 C (rate 0.75 1.5 C/min) 2 h at -40 C Ramp to 50 C (rate 0.75 1.5 C/min) ENGINEERING MATERIAL SPECIFICATION WSS-M11P28-D Copyright 2016, Ford Global Technologies, LLC Page 3 of 7 3.4 S
14、TABILITY When subjected to the following exposures, the adhesive viscosity and adhesion strength shall be +/- 25% of that obtained when originally tested. 3.4.1 Shelf Life (6 months at 23 +/- 2 C) 3.4.1.1 Viscosity +/- 25% 3.4.1.2 Adhesion strength, Para 3.2.1 3.2.8 +/- 25% 3.4.2 Viscosity, original
15、 Report (per ASTM) (ASTM D3236 - spindle, temperature and speed per suppliers recommendation) 3.5 CREEPAGE No slippage (ASTM D1780, prepare test samples per para 3.2, apply a 4.5 kg dead weight load to test samples and expose to 85 +/- 2 C for 24 h) 3.6 COLD SLAM RESISTANCE No cracking, adhesive (FL
16、TM BV 101-02, 10 cycles of 6 slams or cohesive failure per cycle at -30 +/- 1 C) Prepare test assemblies as illustrated in Figure 1. Test substrates shall consist of 100 x 250 mm panels Follow the cure schedule as recommended by the adhesive manufacturer. Mechanically attach bonded test assembly to
17、a 0.8 x 300 x 300 mm CRS base panel. Centrally locate test assembly on base panel. Conduct test as outlined per FLTM BV 101-02 following steps 9, 10 and 11. Position panel in slam fixture with reinforcement facing inward. Subject each test assembly to 10 cycles of six slams per cycle at -30 +/- 1 C.
18、 3.7 LAMP ASSEMBLY TESTING Test parts shall be manufactured with production or production representative processes and equipment. Evaluate a minimum of 2 pair (left and right) per condition at 23 +/- 2 C. Every lamp shall be pressure tested prior to, and after the specific exposures listed below. 3.
19、7.1 Seal Integrity Under Air Pressure, Baseline No leaks (RQT-170000-011017, Legacy (EX-0224) 3.7.2 Resistance to Thermal Cycle (RQT-170000-010972, Legacy (EX-0009) Para 3.2.8: All lamps are lit at point A, off at point B - Reverse lamps are cycled separately Lamp assembly shall not exhibit warpage,
20、 degradation in photometrics, or sink marks when subjected to thermal conditioning. They shall not leak when tested for seal integrity under air pressure. 3.7.3 Resistance to Heat Age (14 days at 107 +/- 2 C, DVM-14455) ENGINEERING MATERIAL SPECIFICATION WSS-M11P28-D Copyright 2016, Ford Global Tech
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FORDWSSM11P28D2016ADHESIONREQUIREMENTSADHESIVEFORBONDINGEXTERIORFRONTANDREARLAMPASSEMBLIESTOBEUSEDWITHFORDWSSM99P1111APDF

链接地址:http://www.mydoc123.com/p-751204.html