FORD FLTM BZ 105-04-2000 COMPONENT PERMEATION TEST《部件渗透性试验》.pdf
《FORD FLTM BZ 105-04-2000 COMPONENT PERMEATION TEST《部件渗透性试验》.pdf》由会员分享,可在线阅读,更多相关《FORD FLTM BZ 105-04-2000 COMPONENT PERMEATION TEST《部件渗透性试验》.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、 FORD LABORATORY TEST METHOD BZ 105-04 Date Action Revisions 2000 08 30 Revised Editorial no technical change A. Cockman 1993 07 02 Printed copies are uncontrolled Page 1 of 4 Copyright 2000, Ford Global Technologies, Inc. COMPONENT PERMEATION TEST Application The purpose of this test method is to d
2、etermine the grams of hydrocarbons emitted by each component while simulating vehicle conditions of the CARB/EPA vehicle SHED procedure. This test method is to be used for perm eation testing of components other than fuel/vapor hose and fuel/vapor connectors. Fuel/vapor hose and fuel/vapor connector
3、s shall be tested using FLTM BZ 114 - 02 (Recirculation Method). Required Test Equipment SHED Chamber Must be suitable for measuring hydrocarbon emission. Must be capable of maintaining diurnal temperature cycle per attached chart (+/ - 2 C). Must be Variable Volume/Variable Temperature (VV/VT) SHED
4、. Must be able to demonstrate a 4 % maximum leakage loss over 24 h diurnal temperatur e cycle. FID (Flame Ionization Detector) Must be suitable for measuring hydrocarbon emission. Need a heated sample pump for the FID. Pressure Decay Monitoring System Must be capable of measuring to +/ - 0.025 kPa o
5、f water. Test Fixture (See Figure 1) Te st component must be attached to the fixture using the same component adaptor as intended for production (e.g. cut the fixture top from actual production intent fuel tank). Machined component adaptor is unacceptable. Soak Stand Soak stand must be able to hold
6、the test fixture upside down so that the test component will be 100 % immersed in fuel. Soak Fuel Reference fuel C + 5 % methanol + 2 % ethanol. Test Fuel Indolene Clear (9 # r.v.p.) Cleaner Alconox or equivalent. FORD LABORATORY TEST METHOD BZ 105-04 Page 2 of 4 Cop yright 2000, Ford Global Technol
7、ogies, Inc. Conditioning and Test Conditions All test values indicated herein are based on material conditioned in a controlled atmosphere of 23 +/ - 2 C and 50 +/ - 5 % relative humidity for not less than 24 h prior to testing and tested under the same conditions unless otherwise specified. Procedu
8、re 1. Prepare the test component by plugging all holes and ports with teflon plugs, steel plugs, heat sealed teflon tubing, or other non - permeating means. 2. Install the test component onto the test fixture. Once installed, DO NOT REMOVE until testing is complete. This is to simulate installation
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FORDFLTMBZ105042000COMPONENTPERMEATIONTEST 部件 渗透性 试验 PDF

链接地址:http://www.mydoc123.com/p-747696.html